NextGen Modeling Requirements

NextGen Modeling Requirements. The ATO Perspective. Introduction. FAA Office of NextGen Systems Analysis (AJP-D) Objective: Estimating the monetary benefits of FAA's NextGen investments over next 10 years Platform: Modernized NASPAC Includes demand generation process Question:

sutton
Télécharger la présentation

NextGen Modeling Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NextGenModelingRequirements The ATO Perspective

  2. Introduction • FAA Office of NextGen Systems Analysis (AJP-D) Objective: Estimating the monetary benefits of FAA's NextGen investments over next 10 years • Platform: Modernized NASPAC • Includes demand generation process • Question: What modeling improvements are needed to fully realize this objective?

  3. What Is NextGen?

  4. 7 Solution Sets TBO High Density Airports Flexible Terminal & Airports CATM Reduced Weather Impact Safety, Security, & Environ. Transform Facilities Airfield Improvements New Runways Runway Extensions Airfield Reconfigurations 41 Mid-Term Capabilities FAA NextGen Portfolio Transformational Programs ADS-B SWIM NextGen Data Communications NextGen Network Enabled Weather NAS Voice Switch RNAV/RNP

  5. Trajectory-Based Ops

  6. High-Density Airports

  7. Flexible Terminal

  8. Collaborative ATM

  9. Reduce Weather Impact

  10. Transform Facilities

  11. Shortfall Summary Terminal • Routes • Inter-arrival time variance • Convective weather • CDTI-Assisted Visual Separation (CAVS) • Severe IMC • Cat II/III operations • Airport closure • Diversions • Equipage-specific effects En Route • Conflict resolution (inefficiency) • Dynamic sectorization • Off-nominal operations • Re-routing - Tactical • Fix Balancing • Convective weather • Storm tops • Route vs. sector capacity En Route/Terminal • SIDs/STARs

  12. Shortfall Summary (cont.) Surface • Gates • Taxiways • Runway usage • De-icing • Tail numbers and delay propagation • Passenger delay Oceanic • In-trail climb • Separations • Track assignment Traffic Flow Management • GDPs/Ground Stops • Probabalistic demand/capacity • Airspace Flow Programs (AFPs) • Re-routing - Strategic • Miles-In-Trail • Time-based metering Airline Operations Center • Cancellations • Substitutions • User preferences and decision-making • Value of flexibility

  13. Additional Requirements • Improved ease of use • GUI? • Future fleet representation • International fleet • Avionics • Monte Carlo capability • Demand • Capacities • Weather • Routings • etc. • Visualization • Validation

  14. Any Questions?