1 / 9

Background Workshop, 22 – 24 Sep 03

Background Workshop, 22 – 24 Sep 03. 3 themes.... In-depth review of radiation-abort policies “make BaBar & PEP-II transparent to each other” Harnessing the run-4 backgrounds (operational issues) Long-term projections Experimental extrapolations Background simulations & new IR design

Télécharger la présentation

Background Workshop, 22 – 24 Sep 03

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Background Workshop, 22 – 24 Sep 03 • 3 themes.... • In-depth review of radiation-abort policies “make BaBar & PEP-II transparent to each other” • Harnessing the run-4 backgrounds (operational issues) • Long-term projections • Experimental extrapolations • Background simulations & new IR design • ...in a wider context • PEP-II parameter projections (JS) • IR upgrade plans (MS) • machine-background experience @ Belle/KEKB

  2. In-depth review of radiation-abort policies (1) • SVT radiation hardness • damage mechanisms (slow, fast) & pain thresholds • measurement results; tests in progress/upcoming; uncertainties • Radiation exposure, past & future (mostly SVT, EMC) • accumulated dose to date, characterization (MID vs T/B, sources) • dose transfer pins  SVT • updated exptl projections on integrated dose (incl. underlying assumptions on injection etc) • comparison of pin dose rate vs current, normalized to extrapolations (idem DCH) • SVT maintenance/rotation scenarios • Beam-abort algorithms • stable beams: fast/slow • injection (inhibit/abort)

  3. In-depth review of radiation-abort policies (2) • Pushing the envelope: where are the hard limits? • what could SVTRAD change in its modus operandi (e.g. algorithms, thresholds, 1 or 2 beams) that woudl make life easier/more efficient? • how much reserve do we have in radiation budget? • what happens if we relax some threshold(s)? What are the implications for • detector damage (SVT, DCH, EMC) • integrated dose (SVT, EMC) • data quality (all) • Sharing the pain between running efficiency, detector integrated dose & BaBar data quality • what are data quality measures (e.g. ‘occupancy meter’ ?) in the various subdetectors? • x-calibration of data quality & pin-diode dose? • What questions/issues would PEP-II (AD/OPS) like to raise? • Belle experience

  4. In-depth review of radiation-abort policies (3) • SVTRAD upgrade plans • SVTRAD 1.5 • diamonds

  5. Harnessing the run-4 backgrounds (1) • Radiation bursts • characterization • strategy • possible experimental/monitoring actions • Trickle injection • recent experience, open issues, work in progress • Injection backgrounds • characterization • strategy • possible experimental/monitoring actions

  6. Harnessing the run-4 backgrounds (2) • Stored-beam tails • characterization/understanding • collimation

  7. Experimental extrapolations (1) • extrapolation of ‘traditional’ backgrounds(in present geometry)valid 20xx ? • b* ==> Coulomb still OK? • can one extrapolate beam-beam backgrounds – at all? • any limitations/vulnerabilities in Babar hardware or physics performance? • SVT radiation hardness? SVTRAD reliability ? • bgd ==> power supply limitations? dataflow BW? p0 reco’tn ? tracking occup’cy?

  8. Background simulations & new IR design (1) • Synchrotron radiation (SR) • overview on new IR design • summary of past SR simulations for the SVT • status of SR simulations for new IR design • Belle experience • Beam-gas • goals & scope of present effort • Overview of simulation architecture • Summary of past background simulation studies (SVT, DCH; EMC?) • Status of Turtle decks • Status of GEANT-4 geometry implementation • First simulation results (if any) • strategy, plans, timeline, milestones • Belle experience

  9. Background simulations & new IR design (2) • Beam-beam tails • existing packages (RS?) • Belle experience

More Related