1 / 13

Marble installation method statement from Tajmarble.ae

Tajmarble.ae's marble stair treads and risers!. Our marble stair treads and risers are made from premium quality marble, which is strong, durable and easy to maintain. We offer a wide selection of colors, sizes and styles to fit your decor needs. We also offer installation services to make sure your marble stair treads and risers are installed correctly. Please contact us for more information and pricing. We look forward to helping you create the perfect stairway for your home or business.<br><br>MarbleinstallationinDubai,<br>MarbleandGraniteSteps,<br>SandstoneSupplierinDubai

tajmarble
Télécharger la présentation

Marble installation method statement from Tajmarble.ae

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Downloaded from: justpaste.it/Marbleinstallationmethodstatemen Marble installation method statement from Tajmarble.ae This tutorial explains the steps needed to create a successful pumice stone recipe, including proper surface preparation, using the right materials, adhesives and plaster, and timely finishing the stone. If you follow these instructions, you will get a quality installation. Be sure to also follow all safety instructions to avoid injury when working with sand. This article explains the specific steps for purchasing and installing ceramic tile and granite on floors, floors, walls, work surfaces, and other locations according to the project schedule.

  2. Marble Stone Flooring:- Marble stone flooring is a timeless and luxurious choice for any home. It is durable, easy to clean, and adds a sophisticated touch to any room. It is also very versatile and can be used in a variety of design schemes. However, it is important to note that marble flooring can be quite expensive and can require professional installation. It also needs regular maintenance, such as resealing, to maintain its shine and prevent staining. Marble Stair Treads and Risers Tajmarble.ae's marble stair treads and risers!. Our marble stair treads and risers are made from premium quality marble, which is strong, durable and easy to maintain. We offer a wide selection of colors, sizes and styles to fit your decor needs. We also offer installation services to make sure your marble stair treads and risers are installed correctly. Please contact us for

  3. more information and pricing. We look forward to helping you create the perfect stairway for your home or business. Marble Bases marble bases, there are a few great options available. You could either purchase them online, or even try making your own if you have access to the necessary supplies. You'll need a piece of marble, a drill, a saw, and some other tools. If you can't find the exact shape and size you're looking for, you could always try customizing one of the pre-made pieces that you find. Another great way to find marble bases is to search for local antique shops or flea markets. They often have one-of-a-kind pieces that you can't find anywhere else. Marble Threshold We are so glad you're interested in our marble threshold products! We have a wide selection of marble thresholds that are available in different sizes, colors, and finishes. We also offer

  4. installation and delivery services so you don't have to worry about setting up the threshold yourself. Please feel free to take a look at our website for more information about our products and services. We are always here to answer any questions you may have. Thank you for considering Tajmarble.ae for your marble threshold needs! Materials for Application marble stone;-Tajmarble.ae About materials for application marble stone. Tajmarble.ae is a great source for this type of material. They offer a wide selection of quality marble stones in various sizes, colors, and textures. Their website has lots of helpful information to help you make the best choice for your project. They also offer free samples and free shipping on orders over a certain amount. We hope this helps and wish you the best of luck with your project! Marble Flooring, Made in the Area We are proud to offer locally made marble flooring options that are sure to bring a touch of luxury and elegance to your home. Our marble flooring is made from high-quality materials and is available in a variety of colors and styles to match your design preferences. Feel free to contact us with any questions you may have or to arrange for a free consultation. Floors with marble Sylvia Light we highly recommend Sylvia Light from Tajmarble.ae. They offer high quality marble flooring options for residential and commercial spaces and have excellent customer service to help you with all your needs. Their marble products come in a variety of sizes and styles, so you're sure to find something that fits your needs. Marble is a beautiful and classic flooring option that can add a timeless look to any room in your home. The Sylvia Light variation is a warm-toned ivory and gray marble with a subtle veining pattern that will give your home an elegant look. If you're considering marble flooring, you'll want to make sure it's properly sealed and maintained. We'd be happy to provide you with more information on the best ways to care for your floors. Medium-light Sylvia marble flooring We are happy to tell you that we offer a wide selection of marble flooring in the Sylvia Medium shade. Our marble flooring is made with the highest quality materials and is sure to provide a beautiful, timeless look to your home. Preparation of marble stone: 1. Sand beds underneath flooring tiles unfold and compact it manually to acquire uniform depth and distribution. Remove stones and foreign materials. Lightly rinse with water. 2. Clean stone surfaces that have been grow to be soiled or stained via getting rid of soil, stains and overseas substances earlier than setting. Clean stone totally through scrubbing with fiber brushes and then drenching with smooth water.

  5. 3. Examine concrete surfaces of stairs, flooring, base, and threshold for compliance with the necessities for set up tolerances and different stipulations affecting overall performance of stone end of stairs. Proceed to set up if fantastic stipulations have been achieved. Tolerances of marble stone: 1. For role shown in format for edges of steps, modifications in shade or finish and non-stop joint lines, no longer to exceed three mm in 2400 mm, 2. Do now not exceed three mm in three m, 6 mm in 6 m or 10 mm maximum From degree or slope indicated for floor aircraft flooring. 3. Joint thickness shall now not range greater than 1.5 mm or one fourth of The nominal joint whichever is less. 4. Between planes and adjoining devices it shall no longer exceed 0.8 mm. 5.

  6. Marble stone installation: 1. General a.) Execute floor set up by way of expert fixers and do quintessential reducing at the site. b.) Produce strains reduce straight and true, with edges eased barely to stop stripping. Use energy saws. c.) Set stone to comply with drawings and save drawings. Match for colour and sample via the use of gadgets numbered in sequences as indicated.

  7. d.) Produce traces reduce straight and true, with edges eased barely to joints. e.) Produce strains reduce straight and true, with edges eased barely to preferred specification referred for set up of stone paving and flooring. f.) Locate and deploy enlargement joints according to necessities of popular specification referred for installation of stone paving and flooring. 2. Flooring a.) Marble floor shall be set with thick moist mortar bedding on sand bedding with a thickness of 25-30 mm. b.) Each stone shall be cautiously set into a degree and line required and shall Be crushed alongside full floor location to make certain company placing and full contact between mortar and lower back floor of the stone. c.) Tamp and beat stone with timber block or rubber mallet to reap full contact with the placing mattress and carry completed surfaces inside tolerances. 3. Treads a.) Saturate with smooth water a number of hours earlier than setting putting bed.Remove floor water one hour earlier than putting putting bed. b.) Apply cement paste slush coat over floor of concrete about 15 minutes earlier than putting putting placing bed. Limit vicinity of slush coat to keep away from drying out earlier than putting putting bed, the slush coat cement paste shall now not exceed 1.5 mm. c.) Apply mortar putting mattress over cement-paste slush coat right away after slush coat has been applied. Spread and screed putting mattress to uniform thickness at sub grade elevations required for correct placing of stone to end grade as indicated.

  8. d.) Place stone earlier than preliminary set of cement occurs. Do no longer installation one tread until riser of the previous step has been set and mortar bedding appropriate hardened. e.) Tamp and beat stone with a timber block or rubber mallet to gain full contact with placing mattress and to convey completed surfaces within tolerances. f.) Set every unit in a single operation earlier than preliminary set of mortar, do now not return to the areas already set and disturbed stone for purposes of realigning completed surfaces or adjusting joints. Finish stair tread flawlessly plumbed as to traces indicated. g.) Tool joints flat, uniform and clean except seen voids. 4. Risers a.) Set risers to line intending tread, furnish pinnacle degree side and 25 mm clearance between again of riser and face of concrete step riser. b.) Fix quickly in location with gypsum dots and fill again clearance with cement and sand grout blended with enough water to achieve pourable consistency. The ratio of cement to sand should be four hundred kg of normal Portland cement to 1 m3 sand. 5. Bases a.) Bed marble bases in thick mortar about 10 mm thick and deploy at once to masonry wall covered with plaster sprint coat. b.) Refer to the plans for the small print on indicated drawings. c.) The exterior and indoors corners should be mitered at 45º. d.) Grout joints, which includes joints with ground with the identical pointing mortar used in floors. 6. Threshold

  9. a.) At places adjoining to Jenna Marbles flooring, installation stone threshold in identical kind of placing mattress as abutting stone flooring. b.) Set threshold in skinny set, latex-Portland cement mortar at areas the place mortar mattress would in any other case be uncovered above different adjoining flooring. c.) At areas no longer adjoining to stone flooring, reduce lower back and discard any placing mattress fabric from the different end aspect and depart mortar floor uniform with floor of threshold. 7. Adjusting, Cleaning and Protection a.) Remove and exchange marbles which are broken, damaged, stained, faulty joints, stone paving and ground no longer complying with different necessities indicated. b.) Apply sealer to cleaned marble stone floor in accordance to sealer manufacturer’s written instruction. c.) Prohibit visitors from the set up marble stone for at least seventy two hours. Marble installation instructions process statement Prepare the Subfloor Marble flooring tile (like all ground tile) requires a smooth, flat, waterproof base for installation. In most cases, this will require doing away with the present ground overlaying down to the subfloor layer, which is normally plywood or MDF. Once you have uncovered the wooden subfloor, cowl it with a layer of cement board to add each stiffness and moisture resistance to the floor. Cement board does not end moisture from passing thru it—it's no longer a vapor or moisture barrier—but it may not be broken by using moisture the identical way wooden is. Cement board additionally is engineered to bond very properly with thin-set mortar adhesive, which you will use to set up your marble tile. Tips:- Because marble is heavy, your subfloor ought to be extraordinarily sturdy. This can also require some structural work to beef up the joists aiding the subfloor earlier than putting in

  10. tiles. Create Reference Lines Your set up will seem quality if the tiles radiate outward from the core of the room, instead than beginning all at once from one of the walls. In order to attain this symmetrical effect, you want to create reference strains on the floor of the cement board underlayment. Find the core of two opposing partitions and use a chalk line to mark a direction between them, dividing the room in half. Then, measure to the core of that line, and use a T-square to draw a perpendicular line at the mark, the use of a pencil. Snap a chalk line throughout the ground the usage of the pencil line as a guide, dividing the ground into 4 equal quadrants. Check your sketch by using test-fitting full tiles alongside each reference traces from wall to wall. If the final row of tiles in opposition to any of the partitions is less than a few inches wide, alter your chalk line grid as wanted so that the tiles alongside the partitions are an proper width, based totally on your preference. Mix and Spread the Mortar Mix thin-set mortar in accordance to the manufacturer's instructions. Mix solely a little bit at a time, and make extra when necessary. The thickness of the thin-set is integral and varies by means of the dimension of tiles and trowel notch used. The ratio of eater to dry combine ought to be maintained when mixing small amounts. A digital kitchen scale, measuring cup, and a little math will allow that ratio to be maintained at one-of-a-kind quantities of mix. Using a notched trowel, unfold the adhesive onto the floor, beginning the place the reference strains intersect at the middle of the room. As you work, use the notched side of the trowel to create grooves in the mortar. This will make bigger the adhesive electricity of the bond between the cement board and the backside of the marble. Ridges of mortar ought to continually run in one direction. This permits air to break out for a uniform set. Tips:-

  11. On marble tiles that are 12 inches rectangular and smaller, a 1/4-inch notched trowel will create massive adequate grooves. However, if you have plenty large tiles, or if you are the use of irregular tumbled or herbal cleft materials, use a 1/2-inch notched trowel to create wider, deeper grooves in the adhesive. Set the First Tile Spread adequate mortar to effortlessly cowl the backside of a single tile, and make certain that its whole floor is notched. Gently press the first tile into place, aligning two of its edges with the chalk strains in the nook of the layout. As you press it down, twist the tile barely to make sure that it top units in the mortar mattress below. "Set" the Tile With a Rubber Mallet A rubber mallet is a massive hammer with a smooth rubber head. Use this to gently faucet the floor of the marble tile, urgent it extra firmly into the mortar. However, be cautious now not to faucet too hard, as marble is a quite tender fabric and can crack alternatively easily. Avoid transferring the tile as you are putting it. Install Additional Tiles Continue to unfold mortar for every tile, then vicinity the tile earlier than transferring on to the subsequent one. Follow the reference line toward the wall, the usage of it as a information to maintaining your placement straight. Use tile spacers to keep constant spacing between tiles. The spacers must be chosen for some thing width you have chosen for the joints. Spacers assist make certain the grout traces are sharp and uniform. Install the Remaining Full-Size Tiles After putting each three or 4 tiles, use a 2x4 board to make sure that they are at a uniform height. Place the board throughout the tiles, and faucet the board gently with the rubber mallet. If the marble is polished you might also prefer to cowl the the front of the timber with a piece of carpet to forestall scratches. You can additionally do this throughout a couple of rows when you have extra tiles installed. Once you attain the wall with the first row, take observe of the hole at the give up that may additionally require a custom-cut piece. Then, cross returned to the middle factor of the reference lines, and proceed to area tiles adjoining to the first row. Take a second after each few tiles to make sure that all of your traces meet up and the complete flooring appears sharp and consistent.

  12. As you work, be cautious now not to step on any mounted tiles. Typically, marble flooring tile ought to be allowed to set for at least forty eight hours after installation. Because of this, you have to be cautious now not to tile your self into a nook that you can now not get away from. Be certain to go away a visitors direction for yourself; the remaining quadrant you work on ought to be the one the place the door is located. Cut Tiles With a Wet Saw Use a moist tile noticed to reduce tiles as needed. You can buy a small moist noticed for underneath $100, however many DIYers sincerely lease one through the day or week. Smaller, transportable saws are capable to take care of fundamental straight cuts on tiles up to 12 inches. Rental costs can also consist of a flat price for the noticed plus a prorated cost for put on on the diamond blade. For challenging cuts, or if you pick no longer to use a saw, ask your tile provider if they will reduce portions for you. If you want to reduce holes in marble tile, such as may also be imperative if you have plumbing pipes coming up via the floor, distinctive gap saws with diamond-encrusted slicing edges can be used. The gap saws are genuinely hooked up in a electricity drill. Make certain to reduce at a sluggish pace to forestall overheating the gap saw. Remove Excess Mortar If there is any extra adhesive that has oozed up from the gaps between tiles, use a paint stick or utility knife to cast off it. When all tile has been installed, let the mortar adhesive dry completely, following the manufacturer's directions. Do no longer stroll on the flooring for the duration of this time, or you danger transferring or depressing a tile. Seal the Marble Marble is porous, and many materials can penetrate the floor of the stone, inflicting everlasting stains. For this reason, it need to be sealed with a awesome marble tile sealant earlier than you grout. Grout can badly stain marble tile if it is utilized earlier than the marble is sealed. If you have polished marble, follow a very skinny coat of sealant. Use the foam brush to easy out any puddles or tiny bubbles that show up on the surface, as they can dry into everlasting

  13. features. The floor of tumbled and honed marble will be extra forgiving, however the identical policies follow there, as well. It's typically a true thinking to seal a marble tile at least twice—and possibly a number of times —waiting for every coat to dry earlier than making use of a new one. This creates a robust shielding layer on the floor of the material. You may additionally want to reseal the tile each 6 to 12 months, relying on how plenty site visitors the room gets. Grout the Tile Mix the grout as directed by way of the manufacturer. As with ceramic tile, use unsanded grout if the joints are 1/8-inch extensive or less; used sanded grout for wider joints. As with the mortar, combine solely as a whole lot as you can observe in about 15 or 20 minutes—the factor the place the grout starts offevolved to set up. Use a grout glide to observe the grout to the joints, the use of a sweeping movement to pressure it down into the joints. Running the grout drift at a forty five diploma attitude to the joints will decrease catching edges and end result in a full stuffed joint. Holding the device barely on part can assist push the grout downward. Try to direct as plenty of the combine into the grooves as possible, and wipe up any extra that receives on the tiles. Ideally, the seams between tiles ought to be wholly packed with grout, besides void areas. Wipe the Tiles Clean Use a massive grout sponge that is barely damp to gently wipe the floor of the marble tiles smooth and put off extra grout. Be cautious now not to enable any moisture to seep down into the grout lines, as this can purpose the combine to emerge as muddy and wash out. Also, strive to keep away from inadvertently pulling the grout out of the joints as you work with the sponge—focus your efforts on the floor of the tiles only. Allow the grout to remedy as directed. Seal the Grout Check the grout manufacturer's endorsed ready time earlier than sealing the grout. Waiting for seven days is now not uncommon. Seal the grout with a foam brush, following the manufacturer's instructions for application. Source:-https://tajmarble.blogspot.com/2023/01/marble-installation-method-statement.html

More Related