530 likes | 622 Vues
This instructive material covers REMP requirements, primary pathways, critical pathway analysis, direct radiation measurements, and dose projections for air and water pathways. It details categories of food and water sampling techniques, emphasizing the importance of preoperational monitoring for radiological assurance and regulatory compliance.
E N D
Radiological Environmental Monitoring Program (REMP) ACADs (08-006) Covered Keywords Direct radiation levels, gross beta activity, Cs-137, primary pathways, critical pathways, operating report, dose patterns, weather patterns, population distribution, land use. Description Supporting Material Radiological Environmental Monitoring Program Instructor Handout
Enabling Objectives • Objectives of REMP • REMP Requirements Document • Two Primary Pathways • Parameters of Critical Pathway Analysis • Importance of Preoperational Monitoring • Direct Radiation Measurements • Local, Perimeter, & Remote Stations
Enabling Objectives • Categories of Food Products • Water Sampling Technique • Categories of Fish • Quality Control Samples • Purpose of Land Use Survey • Predominant Fission/Activation Product • Results Report
REMP Objectives • Determine Plant Effects on People • Determine Trends of Radioactivity in the Environment • Provide Assurance to the Public • Meet Regulatory Requirements • Provide for Monitoring during Emergencies
REMP Bases • 10 CFR 50, Appendix A, General Design Criterion 64 - Monitor Plant Environs for Radioactivity. • 10 CFR 50, Appendix I, Appropriate Monitoring to Evaluate Doses. • NRC Generic Letter 89-01 – Programmatic Controls in Tech Specs & ODCM
REMP Descriptions • FSAR – General Monitoring Program • Plant Technical Specifications – Administrative Controls. • Plant Offsite Dose Calculation Manual (ODCM) – Specific Requirements for the Monitoring Programs
Critical Pathways • Airborne Pathways • Waterborne Pathways
Airborne Pathways • Direct (Air)1. Direct Radiation2. Inhalation • Indirect (Ground or Terrestrial)1. Materials Deposited on Ground2. Materials Deposited on Plants and Ingested.
Waterborne Pathway • Ingestion of Water • Ingestion of Fish or other Aquatic Animals or Plants • Direct Exposure at the Shoreline
Parameters for aCritical Pathway Analysis • Dose Projections • Weather Patterns • Population Distribution • Land Use
Air-Related Pathways Dose Conc. LLDmRem/yr1. Air pCi/m3pCi/m3 I-131 0.05 0.0024 0.0100 Noble Gas 0.43 2. Milk pCi/LpCi/L I-131 0.09 0.05 0.503. Vegetables pCi/KgpCi/Kg I-131 0.62 0.21 1-8 Sr-90 1.00 0.11 8 Sr-89 0.70 1.00 40
RankingAir-Related Pathways Based on Calculated Annual Dose (mRem/yr) SrIodineNoble Gases • Vegetation(1.7) Milk (>1)(1.0 Sr-90) (Conservative(0.7 Sr-89) Assumptions) • Vegetation (0.62) Direct (0.43) • Inhalation (0.05) Milk (0.09) (Actual Location)
Dose Distribution – SQN % of Total MonitorsRank Dose Sector 1-10 Miles>10 Miles 1 19.1 SSW LM, PM 2 15.4 NNE LM, PM RM 3 13.9 NE LM 4 9.0 N LM, PM 5 9.0 SW PM RM 6 6.6 S 7 5.0 SSE 8 4.7 ENE 9 3.4 SE 10 3.0 NNW 11 2.5 WSW PM 12 2.3 E 13 2.2 ESE RM 14 1.5 W PM 15 1.4 NW 16 0.9 WNW RM
Dose DistributionTimes Population - SQN % of TotalRank DoseSectorMonitors, 1-10 Miles 1 19 SSW LM, PM 2 15 WSW PM 3 12 SW PM 4 9 NW 5 9 W PM 6 6 WNW 7 5 S 8 3 NNW 9 3 SSE 10 2 N LM 11 2 NNE LM 12 2 SE 13 1 ESE 14 1 NE LM 15 1 ENE 16 1 E
Water-Related Pathways Annual DosemRem/yrConcentrationLLD • Water pCi/LpCi/LMF&AP 0.0023 0.0920 5-10I-131 0.0051 0.0036 1-8H-3 0.0001 2.0000 330Sr-90 0.0022 0.0004 2 • Fish pCi/gpCi/gMF&AP 0.3800 2.0000 0.01-0.10I-131 0.0210 0.0020 0.02Sr-90 0.0055 0.0001 0.10 MF&AP = Mixed Fission & Activated Products
RankingWater-Related Pathways Based on Calculated Annual Dose (mRem/yr) IodineSrMF&AP • Fish (0.38) • Fish Ingestion (0.021) • Water Water Water Ingestion (0.0051) Ingestion (0.0022) Ingestion Fish (0.0055) (0.0023) MF&AP = Mixed Fission & Activated Products
PreoperationalMonitoring Program • Establish Background Radiation Levels • Identify Fluctuations in Background Data
Background Fluctuations • Seasonal • Annual • Random
Atmospheric MonitoringStations • Local Monitors (LM) – On or Adjacent to the Site Boundary • Perimeter Monitors (PM) – 3-10 Miles from the Site • Remote Monitors (RM) – > 10 Miles from the Site
Typical Food Products - 1 • Fresh Leafy Vegetables1. Lettuce2. Cabbage3. Greens • Other Vegetables1. Tomatoes2. Green Beans3. Corn
Typical Food Products - 2 • Tubers1. Potatoes2. Turnips • Fruits1. Apples2. Peaches • Meat/Poultry1. Beef2. Chicken
Fish Samples • Commercial Species1. Catfish2. Smallmouth Buffalo • Game Species1. Bass2. Crappie
Sample Analyses • Gross Beta – Low Background Counter • I-131 Specific – Chemical Separation & Beta-Gamma Coincidence Counting • Sr-89,90 – Chemical Separation/Beta Ct. • Tritium – Liquid Scintillation Counting
Sample Analyses • Gross Beta – Low Background Counter • I-131 Specific – Chemical Separation & Beta-Gamma Coincidence Counting • Sr-89,90 – Chemical Separation/Beta Ct. • Tritium – Liquid Scintillation Counting • Gamma – Gamma Spectroscopy1. Marinelli Beaker2. “Cottage Cheese” Type Container, Various • Charcoal Cartridge – High Resolution Gamma
Quality Control Program • Equipment Checks • Laboratory Cross Check Program with Outside Laboratory • Split Samples with AL, TN, & EPA • Quality Control Samples • Supervisors Review Trends/Problems
Quality Control Samples • Blank Samples • Duplicate Samples • Split Samples • Analytical Knowns • Blind Spikes • Internal Cross-Checks
Annual Radiological Environmental Operating Report • Site/Plant Descriptions • Monitoring Program Description • Assessment/Evaluation of Plant Impacts • Monitoring Program Modifications • Missed Samples/Analyses