1 / 7

Workshop on 4D Trajectory Status and Navigation Requirements in Oceanic Coordination

This plenary session addresses critical topics related to the downlink of 4D trajectory status and navigation requirements for 4D trajectories. The discussions include conducting Change 1 of DO306/ED122, feedback coordination with WG85, and upcoming joint meetings for 2010. The session highlights the need for a new version of the SPR incorporating comments, a draft validation plan for P9, and the integration of oceanic and continental validation efforts. Key timelines and the framework for future coordination and validation activities are also established.

Télécharger la présentation

Workshop on 4D Trajectory Status and Navigation Requirements in Oceanic Coordination

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC-214/WG-78 Plenary 9: 14–18 December 2009Albuquerque

  2. Position Papers • Downlink of 4D Trajectory Status (Airbus) • Navigation Reqs for 4D Trad (Eurocontrol/Honeywell) • DO306/ED122 for ITP freetext in Oceanic

  3. Coordination with SC186/WG51 • Request from SC186 to conduct Change 1 of DO306/ED122 • Feedback ?

  4. Coordination with WG85 • Debriefing from Chairman of WG85

  5. SC-214/WG78 Meetings Plan

  6. Need for Joint SG meetings in 2010 ? • New SPR Version incorporating P9 comments need to be ready by end of February • Validation • P9 would initially focus on validation • Draft Validation Plan available by P10 • Framework for coordination with validation activities • Timing of expected validation results from NextGen/SESAR activities • SPR Coverage of validation • Oceanic/Continental Integration • P10 will kick-off the work • Draft framework for integrated SPR available by P1 • March time frame ? Location: Europe ? • Review the need for Joint SGs on Thursday

  7. WP2 Draft WP1 Draft WP1 + WP2 FAA Call to Industry StandardsPublication 2008 2009 2010 2011 SC-214/WG-78 Scope and Plan

More Related