An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional Seminar Series Dallas/Fort Worth The Use of PI at CPS Energy Speaker - Robert A. Silva SCADA Engineer CPS Energy January 27, 2010

  2. CPS Energy • CPS Energy has an installed generation capacity close to 5,800 MW. The diverse mix includes coal, nuclear, natural gas as well as renewables including wind, solar and landfill methane gas. • Peak load for the system is close to 4,700 MW during the summer months. The nation’s largest municipally-owned energy utility providing both natural gas and electric service – serving over 690,000 electric and 320,000 natural gas customers.

  3. CPS Energy – Energy Delivery Services System Operations and Customer Reliability is the group responsible for the real-time operation and control of the electric and gas delivery systems.

  4. CPS Energy – PI Systems utilized include • EMS for Electric T&D installed in Jun 2000, last upgrade Dec 2009 • Distribution/OMS/GIS installed in Oct 2006, DMS upgrade currently in progress • SCADA System for Gas Transmission/Distribution system installed in May 2005 • Gas Meter Resolution System installed in Aug 2007

  5. CPS Energy – Primary Drivers Primary Drivers for PI • Ability to create custom displays easier • Retrieve data quickly and easily using common tools such as Excel • Not satisfied with performance of existing historian • Make use of the multiple interface capability (T&D EMS, Gas SCADA, Modbus, etc.) • Provide access to data for staff in corporate offices

  6. CPS Energy – PI PI Historian system installed in August, 2007 to serve as historian for the T&D system EMS and the Gas system SCADA • PGAS data also mirrored in PI for analysis/forensics • New DMS install in 2009 includes a separate 40K tag PI system System features a 3.4 HA collective interfaces including • PI-OPC (redundant failover) • PI-RDBMS • Native interface to Gas SCADA • PI-to-PI

  7. CPS Energy – PI Primary tools of choice – ProcessBook and Datalink. Deployed at • Primary (Control room, operations and systems support staff) • Substation Engineering • Transmission/Distribution planning • Asset Management • Gas Engineering Plans in place to deploy PI Webparts in near future (NERC-CIP and upgrades took recent precedence)

  8. CPS Energy – System Summary

  9. CPS Energy – RTU Status

  10. CPS Energy – ICCP Status

  11. CPS Energy – PI PI ProcessBook is utilized for ‘Wide Area’ Visualization BARCO large screen display systems in the EMC control room for situational awareness 42” Plasma information displays located • In the EMC lobby – informational displays for visitors • In the Systems support area for system status displays

  12. CPS Energy – EMC BARCO Displays

  13. CPS Energy – Plasma Information Displays

  14. CPS Energy – additional use cases • Staff wanted to present system frequency and other system data in a wide-area view, replacing legacy system which was problematic. Source was video graphic recorder tied to tone-telemetry equipment which featured Modbus over Ethernet output • PI-Modbus was configured to collect data at 1-second samples

  15. CPS Energy – PI additional use case

  16. CPS Energy – additional use cases • System Operations Support staff uses PowerWorld Simulator product for network studies including load flow and contingency analysis. PowerWorld Retriever was added to provide additional wide-area visualization. • Integrates easily with many products, particularly PI

  17. CPS Energy – PowerWorld with PI data

  18. CPS Energy T&D – Value of PI The Northeast Blackout of 2003 produced recommendations calling for better visualization of system conditions • PI at system operations • Superior tool for trending, system visualization • Key tool for support staff for data analysis/forensics of system health and EMS and equipment troubleshooting • PI as a benefit to corporate engineers/planners • Planners able to see load in real-time as opposed to past methods which provided data 2 weeks in arrears • Now able to more easily identify and correlate feeder phase imbalance • Use for power factor improvement • Able to tune planning models more accurately and easily

  19. CPS Energy – PI for IT Monitoring • CPS Energy made decision to acquire IT Monitor in Fall of 2007. Installed HA IT Monitor collective and interfaces in March, 2008 • Interfaces utilized include • Perfmon • Ping • Windows Event Log • SNMP • TCP Response • Installed and collecting first data in < 3 hours

  20. CPS Energy – IT Monitor Overview

  21. CPS Energy – PI Windows Perfmon Overview

  22. CPS Energy – PI Interface Overview Display shows status of interfaces actually using Uniint Health tags • For interfaces which feature this, it provides a excellent method of monitoring data flow – including the health of the source system

  23. CPS Energy – PI Notifications • Originally installed as RTAlerts in 2008 • Over 700 notifications currently in service • Recently upgraded with plans to revise/standardize to take advantage of new notifications templates feature • Keeps operations doing their primary job – monitoring electric/gas systems, not the SCADA/network infrastructure • Makes support staff better at their jobs…

  24. CPS Energy – PI Notification Closed

  25. CPS Energy - Upgrade to PI Server v380 • Upgraded PI Historian Collective and IT Monitor in December, 2009 – while Transmission SCADA system was being upgraded. • Used procedure listed in ‘Configuring PI Server Security’ – “Migrate over Time” option. • ‘Turned up’ IT Monitor server to Windows Authentication level the day after software upgrade. • Make sure to set database defaults – since they determine default behaviors/configuration going forward.