160 likes | 274 Vues
This guide provides step-by-step instructions for installing the 0.9mm SC field connector. Recommended practices include using a tight buffer for optimal results. Key steps involve properly aligning the buffer, marking important points for stripping, cutting the fiber accurately, and inserting the fiber into the connector until specific marks are reached. The guide emphasizes careful handling and proper technique to ensure successful installation of the SC field connector.
E N D
0.9mm type SC Field Connector Installation Guide JyhEng Tech. 2011.09 Version 1
Insert the boot into the buffer Tight Buffer is highly recommended.
Align on the paper but beyond2.5~3cm at the right side Tight Buffer is highly recommended.
Make marks (1) & (2) on buffer Tight Buffer is highly recommended.
Strip off buffer till mark (1), and keep 125um fiber Tight Buffer is highly recommended.
Squeeze the ears to open the valve valve Tight Buffer is highly recommended.
Place the buffer onto the cutter Tight Buffer is highly recommended.
Align the buffer at the mark “4.5” Tight Buffer is highly recommended.
Press the arm to cut the fiber Tight Buffer is highly recommended.
Bend the buffer and latch together to break the fiber Tight Buffer is highly recommended.
Press and hold the tool, then insert the buffer into connector, till the mark(2) reach the edge mark(2) Tight Buffer is highly recommended.
After the mark(2) reach the edge, keep inserting the fiber until a curve is made, Tight Buffer is highly recommended.
Then release the tool Tight Buffer is highly recommended.
Take out the connector from tool Tight Buffer is highly recommended.
Move the boot toward to the stopper Tight Buffer is highly recommended.
Done Tight Buffer is highly recommended.