1 / 33

TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement)

TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement). Who is customer? What Level of Quality do they need? Are they purchasing to Some Quality Specification? Any Safety Considerations? Future Litigation? Ethical Issues?. QUALITY CONTROL Inspection ·         Destructive

tara-nelson
Télécharger la présentation

TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement)

  2. Who is customer? What Level of Quality do they need? Are they purchasing to Some Quality Specification? Any Safety Considerations? Future Litigation? Ethical Issues?

  3. QUALITY CONTROL Inspection ·        Destructive ·        Non-destructive ·        Sampling Process Control ·        Monitoring Process (relates to inspection) ·        Feedback Control ·        Statistical Process Control (knowing when the process is out of control) Correction ·        Knowing what to correct when process is out of control 

  4. Tools for Quality Control Check Sheets Pareto Charts Why-Why Diagrams Cause & Effect Diagrams Flowcharts Histograms Scatter Diagram Control Charts

  5. Problem Solving Steps Plan Do Study Act Link these Two in Quality Circle

  6. PARETO CHART A graphical representation ranking discontinuities from the most to least significant. Used to help brainstorm what discontinuities, if worked upon first, would be the most likely to produce the greatest improvement in quality. CHECK SHEETS Used to keep a record of the number and type of discontinuities over a specified period of time or within a certain batch of product. • Class Example • Our manufacturing procedure is composed of several steps. Several of these procedures have lead to discontinuities noticed upon inspection. The steps causing defectives are as follows: • ·        Caulking 198 defectives • ·        Fitting 25 defectives • ·        Connections 103 defectives • ·        Torque 18 defectives • ·        Gapping 72 defective •   A Pareto Diagram will be developed.

  7. WHY-WHY DIAGRAMS A systematic representation of causes of why some occurrence happens. Used to guide brainstorming sessions.

  8. FLOW CHARTS Flow charts are graphical representations of the steps involved in a process. Constructing a flow chart helps give a better understanding of the systems involved.

  9. CAUSE AND EFFECT DIAGRAMS (Fishbone Diagram) Used in brainstorming session to help identify the causes of quality losses. This diagram is particularly useful after the flow chart and the Pareto diagrams have been developed. Step 1: Decide on the quality characteristic {e.g. Reduction of wobble during machine rotation} Step 2: Set up the fish bone backbone Step 3: Identify main factors causing effect {e.g. Workers, Materials, Inspection, Tools} Step 4: Add Cause to each branch

  10. Benefits of Cause and Effect Diagram ·         Making diagram is educational in itself ·         Outline relationship ·         Note what samples need to be taken ·         Guide for discussion ·         Causes are actively sought and results written on diagram ·         Appropriate data collected - no time wasted ·         Shows level of technology

  11. Problem Solving Steps Plan Do Study Act Link these Two in Quality Circle

  12. CONTROL CHARTS ·        Used to test if the process is in control ·        Used to see if significant changes have occurred in the process over time “Discrete Data Charts” or “pn-p charts” Inspection on lot or batch Note # good/defective # of parts inspected in the lot = n Fraction of defective in lot = p Number of defectives = pn “Indiscreet” or “Continuous Data Chart” or “X-R Chart” Measurement at time intervals Measurements compared - control over time. Examples: Length (mm) Volume (cc) Weight (gm) Power (kwh) Time (sec) Pressure (psi) Voltage (v)

  13. - R CHART CONSTRUCTION Class Example In the manufacturing process for this example parts are being machined with a nominal diameter of 13 mm. Samples are taken at the following times of day: 6:00, 10:00, 14:00, 18:00 and 22:00, for 25 consecutive days. The diameter measurements from these samples are presented on the table in the next slide.

  14. Step 8: Plot Chart

  15. P CONTROL CHART CONSTRUCTION Class Example An inspector at the end of the manufacturing line for the production of car wheel rims, at the end of each shift, inspects the lot of wheel rims made during that shift. On good days when the welder is running properly, over 400 wheels are made per batch. On poor days, as low as 50 to 60 wheels are made per batch. The inspector marks on his/her “check sheet” for each batch the total number of wheels inspected and the number of defects returned for rework in each lot.

  16. Step 6: Draw P Control Chart

  17. PN CONTROL CHART CONSTRUCTION Class Example On an assembly line of windshield wiper motors, the inspector selects randomly 100 motors per hour to examine. The inspector notes on the “check sheet” the number of defective motors in each 100 selected.

  18. ISO 9000

  19. Homework

More Related