This document outlines the preliminary design criteria and configuration details for the quadrupole cryostats utilized in the BTeV project at Fermilab. Key specifications include maximum allowable working pressures (MAWP) for single-phase, two-phase, and LN2 shield, along with operational pressures and heat loads to 4K. Various cryostat layouts, cross-sections, and support structures are presented, contributing to the effective functionality and safety of the BTeV systems. Detailed notes provide insights for engineers and researchers involved in the project.
Quadrupole Cryostats
E N D
Presentation Transcript
Quadrupole Cryostats T. Nicol Fermilab – Technical Division Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Misc preliminary design criteria • Single phase MAWP*: 200 psi • Two phase MAWP: 50 psi • LN2 shield MAWP: 100 psi • Heat load to 4K: 5 W per device (spool, quad, etc.) • Single phase operating pressure: 16 psig • Two phase operating pressure: 5 psig *: MAWP is Maximum Allowable Working Pressure Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Misc lengths and cryo service notes Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Lattice printout (page 1) Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Triplet layout from lattice Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Cryostat cross section Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Cryostat solid model cross section Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Q2 isometric view Cold mass supports External supports and lift points Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Q2 upstream end Two phase supply Two phase annular shell Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Q2 downstream end Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout
Q2 post to cold mass interface Fermilab Internal CD1 Review of BTeV – March 30-April 1, 2004 Quadrupole Cryostat Breakout