This project involves the extensive construction of a water storage tank in North Andover, MA. Key activities include the removal of the existing liner and fence around the reservoir, preparation of the subgrade for the natgun tank, and the installation of critical structural components such as the tank roof, wall, and dome panels. Additionally, centering devices for winding operations will be utilized to ensure precise assembly. The project aims to enhance water storage capabilities for the community, with all work conducted in accordance with wastewater construction standards.

taryn
Télécharger la présentation

Comprehensive Water Storage Tank Construction Project in North Andover, MA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Storage Tank, No. Andover, MA Back Forward Water & Wastewater Construction

  2. Tank Roof 2 No. Andover, MA Back Forward Water & Wastewater Construction

  3. Center of Tank Centering Device for Winding Operation, No. Andover, MA Back Forward Water & Wastewater Construction

  4. Reservoir 1 Liner & Fence Removal, No. Andover, MA Back Forward Water & Wastewater Construction

  5. Subgrade for Natgun Tank (1), No. Andover, MA Back Forward Water & Wastewater Construction

  6. Natgun Tank Ready for Water, No. Andover, MA Back Forward Water & Wastewater Construction

  7. Placing Wall & Dome Panels, No. Andover, MA Back Forward Water & Wastewater Construction

  8. Water Storage Tank Complete, No. Andover, MA Back Forward Water & Wastewater Construction

  9. PCC Shelter Placed, No. Andover, MA Back Forward Water & Wastewater Construction