EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS.

4. SEAM STRIP / FORMFLASH AROUND ENTIRE PERIMETER OF EACH EXHAUST FAN (8 TOTAL). #1. EXTEND REPAIR UNDER EXISTING LCC CAP AT BOTH ENDS OF BUILDING. RESEAL LCC CAP. EXISTING WALK-OFF MATS. RE-ADHERE ALL MATS TO EPDM. EXHAUST FAN. EXHAUST FAN. EXHAUST FAN. EXHAUST FAN. EXHAUST

Télécharger la présentation

EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4 SEAM STRIP / FORMFLASH AROUND ENTIRE PERIMETER OF EACH EXHAUST FAN (8 TOTAL). #1 EXTEND REPAIR UNDER EXISTING LCC CAP AT BOTH ENDS OF BUILDING. RESEAL LCC CAP. EXISTING WALK-OFF MATS. RE-ADHERE ALL MATS TO EPDM. EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXTEND REPAIR UNDER EXISTING LCC CAP AT BOTH ENDS OF BUILDING. RESEAL LCC CAP. EXHAUST FAN EXHAUST FAN EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT SECTION OF EXISTING PIPE FLASHING. REPAIR SHALL BE CIRCULAR AND SHINGLE LAPPED. (TYPICAL FOR EACH SUPPORT POST). CUT OUT EIFS. INSTALL NEW LCC FLASHING AND COUNTERFLASHING TO COVER BASE OF LADDER ANCHORS. CAULK AND PROVIDE WATERTIGHT SEAL AT LADDER BRACKETS. 2 SEAM STRIP / FORMFLASH ALL EXISTING SEAMS, T-JOINTS AND ALL PREVIOUSLY PATCHED AREAS IN TOTO BETWEEN THE WALK-OFF PADS FOR THE ENTIRE LENGTH OF THE BARREL ROOF – SEE REPAIR DETAILS ON SHEET RP-3). EXISTING VENT PIPE (TYP). REFLASH PER PIPE FLASHING DETAIL ON SHEET RP-2. FALL PROTECTION SYSTEM TO BE PURCHASED BY OWNER AND INSTALLED BY ROOFING CONTRACTOR. ROOFING CONTRACTOR TO FLASH ALL ANCHORS FOR A WATERTIGHT INSTALLATION. REFER TO SHEETS RP-11 TO RP-18 NOT TO SCALE

  2. **NOTE: CAREFULLY RELEASE AND BEND UP EXISTING LCC COUNTERFLASHING TO INSTALL NEW EPDM. CAREFULLY BEND DOWN FLASHING UPON COMPLETION OF EPDM. CAREFULLY RELEASE AND BEND UP EXISTING LCC COUNTERFLASHING TO INSTALL NEW EPDM. CAREFULLY BEND DOWN FLASHING UPON COMPLETION OF EPDM. ** NEW REMOVE EXISTING EPDM. MAINTAIN EXISTING LCC CAP INPLACE. MODIFY VERTICAL FASCIA AS REQUIRED TO ACCEPT NEW FASCIA COVER. (REFER TO SECTION 00200 SCOPE OF WORK FOR ALTERNATE #1 REQUIREMENTS). EXISTING DRAIN TO REMAIN (SEE NOTE 5). CUT OUT EIFS. INSTALL NEW LCC FLASHING AND COUNTERFLASHING TO COVER BASE OF LADDER ANCHORS. CAULK AND PROVIDE WATERTIGHT SEAL AT LADDER BRACKETS. NEW FLASHING AT NE ROOF LADDER 3

  3. EXECUTION #1 THE REPAIR OF FIELD SEAMS WITH 6" QUICK SEAM BATTEN COVER 1. IN THE EVENT THAT THERE ARE ANY OBSTRUCTIONS TO HINDER THIS REPAIR EXECUTION I.E.: WALK PADS, LIGHTNING PROTECTION CABLES, ETC. REMOVE OR MOVE THE ITEM TO THE SIDE AND CONTINUE WITH THE REPAIR UNINTERRUPTED. UPON COMPLETION OF THE REPAIR REPLACE OR REPOSITION THE OBSTACLE TO IT’S ORIGINAL POSITION. BE SURE TO REMOVE ANY FIELD PATCHES THAT OCCUR IN THE SPLICE AREA TO BE REPAIRED. WHEN REMOVING EXISTING PATCHES, A RIDGE OF LAP SEAL WILL REMAIN, THIS MUST BE REMOVED OR ADDRESSED AS A T-JOINT. IF NOT REMOVED, STRIP-IN LARGE PATCHES AND OVERLAY SMALL PATCHES WITH FORMFLASH. 2. CLEAN A MINIMUM 10" SECTION OF THE IN-SERVICE MEMBRANE, CENTERED OVER THE EXISTING SEAM STEP-OFF, AS OUTLINED IN THE ATTACHED SPECIFICATION "CLEANING OF IN-SERVICE MEMBRANE". 3. APPLY THE SPLICE ADHESIVE TO THE RECEIVING SURFACE A MINIMUM 4" ON EACH SIDE OF THE EXISTING SEAM STEP-OFF AS OUTLINED IN THE ATTACHED SPECIFICATION FOR THE "APPLICATION OF SPLICE ADHESIVE AND LAP SEALANT”. DO NOT APPLY SPLICE ADHESIVE TO THE QUICK SEAM BATTEN COVER. 4. AFTER THE ADHESIVE HAS FLASHED OFF INSTALL THE FIRESTONE 6" QUICK SEAM BATTEN COVER INTO THE ADHESIVE FILM CENTERING THE STRIP OVER THE EDGE OF THE SEAM. 5. WITH 3" SILICONE ROLLERS, ROLL THE NEWLY SPLICED PIECE TWICE; FIRST ACROSS (OR PERPENDICULAR TO) THE MATED SURFACE, THEN SECOND ALONG THE LENGTH OF THE SPLICED EDGE. 6. AT ALL T-JOINTS (TAPE TO TAPE, TAPE TO FORMFLASH AND TAPE TO EPDM) AND AT TAPE ENDS A FORMFLASH PATCH MUST BE INSTALLED EXTENDING A MINIMUM OF 3" ON EACH SIDE OF THE T-JOINT. 7. AFTER ADHESIVE HAS CURED A MINIMUM OF FOUR HOURS, INSTALL EDGE TREATMENT OF SA-1065 & LAP SEALANT PER THE ATTACHED SPECIFICATION TITLED "APPLICATION OF SPLICE ADHESIVE AND LAP SEALANT" TO THE ENTIRE FORMFLASH PATCH. LAP SEALANT IS NOT REQUIRED ALONG BATTEN COVER EDGES. 8. ENSURE THAT THE ROOF IS LEFT WATERTIGHT AT THE END OF EACH WORKING DAY. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y FIRESTONE SEAM REPAIR DETAILS 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-3 SHEET 1 OF ??

  4. Construction Services 170 Long Lane Middletown, CT 06457 SEAM STRIP / FORMFLASH ALL EXISTING SEAMS, T-JOINTS AND ALL PREVIOUSLY PATCHED AREAS IN TOTO BETWEEN THE WALK-OFF PADS FOR THE ENTIRE LENGTH OF THE BARREL ROOF – SEE REPAIR DETAILS ON SHEET RP-3). WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS EXISTING WALK-OFF MATS. RE-ADHERE ALL MATS TO EPDM. RP-4 TOP OF BARREL ROOF NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SHEET 1 OF ??

  5. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS TYPICAL EXHAUST FAN SEAM STRIP / FORMFLASH AROUND ENTIRE PERIMETER OF EACH EXHAUST FAN (8 TOTAL). RP-5 SHEET 1 OF ??

  6. Construction Services 170 Long Lane Middletown, CT 06457 RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT SECTION OF EXISTING PIPE FLASHING. REPAIR SHALL BE CIRCULAR AND SHINGLE LAPPED. (TYPICAL FOR EACH SUPPORT POST). WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS ACCESS LADDER TO BARREL ROOF RP-6 SHEET 1 OF ??

  7. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-7 EXISTING CONDITION PHOTOS SHEET 1 OF ??

  8. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-8 EXISTING CONDITION PHOTOS SHEET 1 OF ??

  9. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-9 EXISTING CONDITION PHOTOS SHEET 1 OF ??

  10. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-10 ALTERNATE – SOUTH LOWER ROOF SHEET 1 OF ??

  11. Construction Services 170 Long Lane Middletown, CT 06457 FALL PROTECTION LAYOUT PLAN FROM FIXFAST WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-11 SHEET 1 OF ??

  12. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-12 SHEET 1 OF ??

  13. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-13 SHEET 1 OF ??

  14. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-14 SHEET 1 OF ??

  15. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y - PROVIDED & INSTALLED BY ROOFING CONTRACTOR 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-15 SHEET 1 OF ??

  16. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-16 SHEET 1 OF ??

  17. Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-17 SHEET 1 OF ??

  18. FALL PROTECTION SYSTEM COMPONENTS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS MAJOR MAINTENANCE FY15 DATE: 3/28/14 REVISIONS RP-18 SHEET 1 OF ??