1 / 24

Achievable Penetration Rates

Achievable Penetration Rates. The Pace of Conservation Acquisition April 17, 2009 Conservation Resources Advisory Committee. Outline in Two Parts. Part 1 Revisions to Ramp Rate Assumptions. Part 2 Sensitivity Testing. Based on Comments & Further Thought.

Télécharger la présentation

Achievable Penetration Rates

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Achievable Penetration Rates The Pace of Conservation Acquisition April 17, 2009 Conservation Resources Advisory Committee

  2. Outline in Two Parts • Part 1 • Revisions to Ramp Rate Assumptions • Part 2 • Sensitivity Testing

  3. Based on Comments & Further Thought Revisions: Tamping Down Max Annual Rates

  4. Slowed down two important new measures: From New Measure - Fast to New Measure - Medium Energy Project Management Integrated Plant Energy Management Represent about 20% of industrial savings Revisions: Industrial

  5. Formerly All at “New Measure - Medium” Now: Split by Measure Bundle System Voltage by LDC method at New Measure - Fast System Voltage EOL method at New Measure - Slow Light System Improvements at New Measure - Slow Major System Improvements at New Measure - Slow Revisions: Distribution Efficiency

  6. Measure 30-Mar Previous LPD Package-New LO 20Fast LO Fast LPD Package-NR LO 20Fast LO Fast Lighting Controls Interior-New LO Medium LO Fast Lighting Controls Interior-NR LO Medium LO Fast Glass-Retro Retro in 20 Retro in 10 Demand Control Ventilation-NR LO Slow LO Medium Roof Insulation-NR LO Fast Retro in 10 Computer Servers and IT-Retro LO Slow LO Medium Street and Roadway Lighting-NR LO Slow LO Medium Revisions: Commercial

  7. Residential • Consumer Electronics • New analysis adds 1000 MWa Potential over 20 years • LO Medium Ramp Rate ~ 30 MWa per year by 2014 • Heat Pump Water Heater • Emerging Technology Ramp Rate

  8. Results

  9. Lost-Opportunity

  10. Retrofit

  11. Comparative Max Rates

  12. Reality Check • Achieved over 200 MWa in 2007 • Expect higher in 2008 • Most programs exceed 2007 & NEEA too • Of the 200 MWa about 70 MWa was CFLs • But CFL savings not in 6th Plan targets • Many New Measures • Higher Avoided Costs • Federal Standards Push • State Code Revisions in the Works

  13. 5th Plan Targets Seemed Daunting 5th Plan Targets (130 to 150 MWa) Historic Performance

  14. Part 2: Ramp Rate Sensitivity Testing • Purpose: • What is the Value of Going Faster? • What is the Cost of Going Slower? • What are the Resource Consequences? • What are the Revenue Requirements? • Tool: Portfolio Model • Test Slow & Fast Achievable Penetration • Issue: What Ranges?

  15. Ramp Rate Sensitivity TestingStaff Proposal • Lost-Opportunity • SLOW: Up to $60 / MWh levelized cost • FAST: Up to $120 / MWh levelized cost • Non-Lost-Opportunity • SLOW: 5th Plan Rate • FAST: Washington I-937 rate • All Cost-Effective in 10 years – evenly paced

  16. Test Slow & Fast Deployment Rates Proposed Annual Maximum Limits on Deployment in MWa

  17. Annual Deployment Rates for Non-Lost Opportunity Resources

  18. Annual Deployment Rate for Lost Opportunity Resources

  19. Annual Deployment Rates for All Conservation Resources

  20. Cumulative Deployment Rate for Non-Lost Opportunity Resources

  21. Cumulative Deployment Rate for Lost Opportunity Resources

  22. Cumulative Deployment Rate for All Resources

  23. End

More Related