Welcome…. Transsmision Planning in India. R P Singh Chairman & Managing Director Power Grid Corporation of India Ltd rpsingh@powergridindia.com. Tr. Planning Practices. Indian Power System divided into five electrical Regions

tea
Télécharger la présentation

Transsmision Planning in India

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome… Transsmision Planning in India R P Singh Chairman & Managing Director Power Grid Corporation of India Ltd rpsingh@powergridindia.com

  2. Tr. Planning Practices • Indian Power System divided into five electrical Regions • Gradual shifting from Regional level planning to National level due to uneven disposition of energy resources • Planning of National Grid by interconnecting different regional grids with high capacity lines as well as development of Regional Grids

  3. Regional Grids I/C 28,700MW DEMAND 24,000 MW I/C 2,300MW DEMAND 1,200 MW NORTH EASTERN REGION NORTHERN REGION I/C 31,400MW DEMAND 25,600 MW EASTERN REGION WESTERN REGION I/C 15,700MW DEMAND 8,200 MW SOUTHERN REGION I/C 28,900MW DEMAND 21,000 MW

  4. Tr. Planning Practices … contd • Planning process involves Policy makers, Authority, Generating agencies, Beneficiaries and Transmission utilities • Tr. Planning is not confined only to connect generation to the grid points but also take care of overall development of the grid • Tr. Planning criteria and Indian Electricity Grid Code being followed

  5. Tr. Planning Procedures • Future Power demand projections carried by Central Govt. and Electric Power Survey Report published • Future generation Capacity addition programme for next 10-15 years developed by Central Govt. • Based on the above information, a long-term perspective Tr. Plan evolved

  6. Tr. Planning Procedures … contd Phased development of Tr. system • Different generation utilities both at Center & State level firm up generation schemes, their time frame and beneficiaries, based on which - • State Tr. Utility (STU) plans and coordinates transmission system within states • Central Transmision Utility(CTU) evolves optimal inter-state and inter-regional transmission system in co-ordination with Authority & STUs

  7. Tr. Planning Procedures … contd • The Tr. System so evolved fulfils the security standards as stipulated in the Planning criteria and Grid Code • The Tr. System so planned has adequate capacity margin for future requirements and also fits into long-term perspective plan • In addition to generation associated Tr. Schemes, system strengthening schemes are also evolved for overall development of the grid • Tr. Schemes discussed and finalised in a common forum of Authority, generation utilities, beneficiaries, STUs and CTU

  8. Hierarchy of Indian Power System National Grid 1 Regional Grids 5 State Utilities 33

  9. Tr. Planning Criteria • Tr. Capacity of a corridor evolved considering maximum power dispatch • Security standards • Withstand ‘n-1’ contingency without rescheduling of dispatch • Outage of 400kV D/c line, if such possibility is more • Application of ‘n-2’ contingency for multi line & vital Tr. corridors

  10. Tr. Planning Criteria … contd • Tr. Capacity of a corridor evolved considering maximum power dispatch • Security standards • Withstand ‘n-1’ contingency without rescheduling of dispatch • Outage of 400kV D/c line, if such possibility is more • Application of ‘n-2’ contingency for multi line & vital Tr. corridors • System should remain in synchronism with outage of one single largest unit/ 5 cycles SLG fault followed by opening of line/outage of one pole of HVDC bipole

  11. Tr. Planning Consideration • Bulk power transmission from generation resource confined to few pockets to far-off load centers across the regions • Conservation of Right-of-Way • Flexible for phase development • High availability/Reliability • Optimum Transmission cost

  12. Technological Options • Maximum utilisation of existing transmission facilities • Application of FACTS devices – SVC, TCSC etc. • Uprating/upgrading of Tr. Lines • Conversion of AC line to HVDC line • Dynamic Thermal circuit rating • Development of new Tr. corridor • Multi-conductor line • 800kV lines/HVDC bipole • Compact line/Multi-circuit lines • High thermal rating conductors like INVAR

  13. Transmission Plan

  14. Future Transmission Plan PHASE II & III

  15. Growth of cumulative capacity of inter-regional links

  16. POWERGRID, INDIA …with clear Vision. Thank You