An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MFCS Norfolk MGySgt Freiler 2008 LRG Wednesday 21 May

  2. MAILING NAVAIR MFCS-NORFOLK 8581 PATROL RD ATTN: MGYSGT R.J. FREILER NORFOLK VA 23511-4213 SHIPPING NAVAIR MFCS-NORFOLK N58070 8581 PATROL RD BLDG NM92 ATTN: MGYSGT R.J. FREILER NORFOLK VA 23511-4213 Address Information

  3. POC Information • PHONE • 757 444-7334 • 757 444-7132 (FAX) • DSN 564

  4. Present Manning • 1 NAVAIR Liaison • 1 FRC Support Equipment Program Officer • 3 BAE Support Staff

  5. Present Manning • DynCorp Staff • Site Manager • Production Foremen • Electricians • Mechanics/ Workers • Painter/CC • Supply • QA

  6. Workload • MV22 • HY-06C • RR-04A • RR-05B • TB-02

  7. Workload • MV22 (cont) • MALS 29 • HY-06C: Delivered to unit • RR-04A: Complete (Compressor delivered to unit) • RR-05B: Complete • TB-02: Awaiting delivery of tube bender • MALS 16 • HY-06C: Work Stopped awaiting Hyd Control • RR-04A: Packout • RR-05B: Packout • TB-02: Awaiting delivery of tube bender

  8. Workload • JSF • LN-01: Awaiting installation of Fire Suppression System • Packout • Air Force • KA-18A • 2 MFs assigned; all identified materials on order • 2 HY-06 Mobile Tables complete (1 Shipped on 16 May) • 1 KA-14 complete • 1 KA-17 to KA-14 conversion • KA-17 configuration stripped out • KA-14 Materials on order • CSC issue

  9. Workload • PMA-213 (ATC) • 3 configurations (AT-11, AT-12, CR-03) • 4 MFs per set {AT-11 (1), AT-12 (1) , CR-03 (2)} • 9 sets (36 MFs) on current work load

  10. PMA-213 (ATC) MFS • All from rehabbed MFs • Incorporated many common MF components along with other customer requested features • Exterior is CARC tan • Butcher-block countertops • Non-skid floors • Built-in telephone circuits • R134 ECUs

  11. Accomplishments • UIC Establishment • MFCS-Norfolk is now N58070 • Establish PLAD for Norfolk configuration site • All paperwork has been submitted • Awaiting controlling authorities to activate it • NAVAIR MFCS NORFOLK VA

  12. Accomplishments • MV22 MF Builds • MALS-26 & MALS-26 TSA • Delivered to units • Fleet MF Builds/Rehabs • 8 KA-14s & 2 KA-15s • Awaiting destinations • 2 FS-01s for M49 • Used Asia return shells • 1 CR-01, 1 SU-02 & 2 SU-03 for M49 • TT-04B for M41 • Original shell was BER

  13. Accomplishments • Survey and disposal of MFs • MFs stripped of non-metals and useable parts and sent to Base Metal Recycling • Disposed 6 previously surveyed MFs from site • Disposed 31 MFs from Asset Report • 10 more processed • 12 MFs awaiting teardown • 1 MF transferred to Norfolk Dive Team E via DRMO

  14. Tasks • Investigate using polyurethane tan as a possible exterior color for future MFs • Temperature test to be performed this summer

  15. Tasks • TQG ETool Kits • Install ID plates and serialize kit components • 25 kits received and completed • Deliver kits to fleet • Active MALS units • Shipped out on 16 May • Marine Reserve and Navy Units • 30 to 60 days before TQG deliveries

  16. Tasks • R134 ECU Special Tool Kits • Shipped with TQG ETools

  17. Industry Day Recap

  18. Fleet Return MF Issues • ECUs not properly shored • Packout Items missing • Deconfiguration • Mismatched doors • Filth

  19. What can we do for you?