1 / 6

Taesang Choi choits@etri.re.kr

Taesang Choi choits@etri.re.kr. Telecommunications Technology Association. 11 th CJK NGN-WG (CJK NGN Test-bed: Performance Monitoring Scenarios and Schedule). Contents. Original Test Scenarios Proposed Test Scenarios Proposed Schedule Changes Some Issues.

thalia
Télécharger la présentation

Taesang Choi choits@etri.re.kr

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Taesang Choi choits@etri.re.kr Telecommunications Technology Association 11th CJK NGN-WG (CJK NGN Test-bed: Performance Monitoring Scenarios and Schedule)

  2. Contents • Original Test Scenarios • Proposed Test Scenarios • Proposed Schedule Changes • Some Issues

  3. Original Test Scenarios • Scenario 1: Single Call Server within a single NGN Network Domain without PSTN • Scenario 2: Call Servers across multiple IP Network Domains without PSTN • Scenario 3: Single Call Server within a single NGN Network Domain with PSTN • Scenario 4: Call Servers across multiple NGN Network Domains with PSTN • Scenario 5: Call Servers across multiple NGN Network Domains with PSTN & Value Added Services • Scenario 6: Performance Evaluation with RTP/RTCP-based Measurement extension • Scenario 7: Call Servers across multiple NGN Network Domains with PSTN, Value Added Services and RACF Involvement

  4. Proposed Test Scenarios • P Scenario1: Performance evaluation of Network Segments • Measure Network Performance Metrics among CJK independent from services • Periodic and constant measurement • Measurement intervals and other details to be defined • IPTD, IPDV, IPLR of C-K, C-J, J-K, J-C, K-C, K-J • P Scenario2: Performance evaluation of VoIP serviceamong CPEs • Measure RTP/RTCP performance of VoIP service based on CS and/or IMS • CPE-to-CPE performance evaluation • P Scenario 3: Performance evaluation of IPTV service among CPEs • P Scenario 4: Performance evaluation of VoIP service with two MPMs • Measure RTP/RTCP performance of VoIP service based on CS and/or IMS • CPE – MPM1 – MPM2 – CPE performance evaluation • P Scenario 5: Performance evaluation of IPTV service with two MPMs • P Scenario 6: Performance evaluation of VoIP service with over two MPMs • Measure RTP/RTCP performance of VoIP service based on CS and/or IMS • MPMs send/append evaluated performances • CPE – MPM1 – MPM2 – MPM3 – CPE performance evaluation • P Scenario 7: Performance evaluation of IPTV service with over two MPMS

  5. Proposed Schedule Changes • Phase I: 2006 3rd/4th Quarter (Completed) • Network Connectivity • Scenario 2 and 4 only (2 CS and 2 domains) • Status Report during 8th CJK NGN Meeting (January 2007) • Phase II: 2007 1st/2nd Quarter(In Progress) • Scenario 1 and 3, (simpler version of 2 and 4, single domain) • Status Report at the 12th CJK NGN Meeting (March 2008) • Phase III: 2008 1st/2nd Quarter (Proposed) • Scenarios 5 ~ 6 • Performance Evaluation of RTP/RTCP-based VoIP service (led by TTC) • Network connective for Performance evaluation and Performance Monitoring Scenario 1 ~ 3 • Status report at the 13th CJK NGN Meeting in 2008. 9 or 10 • Phase IV: 2008 3rd ~ 2009 2nd Quarter (Proposed) • Performance Evaluation of RTP/RTCP-based VoIP and IPTV services • Performance Monitoring Scenario 4 ~ 6 • Initial RACF Interoperability testing : Scenario 7 • Testing of RACF and RTP/RTCP-based MPM Interactions • IPTV Interoperability testing • Status report at the 14th and 15th CJK NGN Meetings

  6. Some Issues to be discussed • Current planned network connectivity is a mixture of R&D network and commercial network: R&D between C-K and Commercial between C-J and K-J • One possible alternative is to test in two different environment separately and compare the results • Commercial service providers and solution vendors involvement • Budget support for the additional testing by each SDO • Finding collaboration opportunities with other related Testing Programs (e.g., BcN test-bed, KDDItest-bed) • Other performance evaluation methods besides RTP/RTCP-based passive measurement? – MPM defines others as well

More Related