1 / 3

TECHNICAL NOTE RELEASE

TECHNICAL NOTE RELEASE. Adi3tek® e liminates pre-heater build-up and ring formation in Cruz Azul Lagunas Oaxaca Kiln No. 4 Lagunas Oaxaca , México. MEX- CA-LAG-OAX-05-2012 . PROBLEM

thanh
Télécharger la présentation

TECHNICAL NOTE RELEASE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TECHNICAL NOTE RELEASE Adi3tek® eliminatespre-heater build-up and ring formation in Cruz Azul Lagunas Oaxaca Kiln No. 4 Lagunas Oaxaca , México MEX- CA-LAG-OAX-05-2012

  2. PROBLEM Cruz Azul Lagunas Oaxaca calcining line shows severe pre-heater build-up as well as extensive ring formation in Kiln No.4 A solution is urgently needed to avoid an unscheduled kiln stoppage SOLUTION Pre-heater and main burner Injection of a mix of Adi3tek® and 5% pet coke is recommended to eliminate build up and block ring formation in Cruz Azul Lagunas calcining line RESULTS Pre-heater build-up and ring formation are blocked in a 72 hour period approximately. A decrease in raw meal SO3 content as well as a corresponding clinker SO3 increase are observed A disturbing vibration problem at Tire No.1 caused by material accumulation inside the kiln was eliminated An 8-10% clinker production increase as well as significant calcining line stability are achieved False air entrance to the preheater is notably reduced. Preheater cleaning cycles are reduced from 2.5 h/shift to 15 minutes for inspection only The use of Woma pump to dislodge pre-heater build-up is eliminated. NEXT STEPS Cruz Azul Lagunas is pleased with the results. The use of pet coke with higher (6.5%) Sulfur content in Kiln No. 4 is planned for June 15, 2012. EXECUTIVE SUMMARY

  3. INFORMATION Fordetailedinformationpleasevisitourwebsite at www.adi3tek.com Orsendan email to: elias@adi3tek.com(Houston) luis@adi3tek.com(Houston) jgonzalez@adi3tek.com(Monterrey, Mexico)