An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRAINING FACILITIES/WORKSHOP

  2. TRAINING FACILITIES SHIELDED METAL ARC WELDING The welding workshop must be of concrete structure. Based on class size of 25 students the space requirements for the teaching/learning and circulation areas are as follows: * This area can also be used by other welding courses. ** Circulation Area is equivalent to 30% of the total teaching/learning areas • Height of the workshop must be of a building structure

  3. TRAINING FACILITIES AUTOMOTIVE SERVICING The automotive workshop must be made of reinforced concrete or steel structure. The size must be suited on the requirements of the competencies. The class size of 25 students is reserved for the lecture room and the practical demonstration area for carrying out servicing of minor automotive parts. Most of the learning activities such as on-vehicle servicing are performed in the workshop. • ** Circulation Area is equivalent to 30% of the total teaching/learning areas

  4. TRAINING FACILITIES DRESSMAKING The Dressmaking workshop must be made of reinforced concrete or wooden structure. Based on a class intake of 25 students, the size must be suited on the requirements of the competencies. • ** Circulation Area is equivalent to 30% of the total teaching/learning areas

  5. TRAINING FACILITIES AQUACULTURE The Aquaculture workshop must be made of reinforced concrete or wooden structure. Based on a class intake of 25 students, the size must be suited on the requirements of the competencies. Note: Experimental fish farm will vary according to availability of land but not lower than the prescribe. • ** Circulation Area is equivalent to 30% of the total teaching/learning areas

  6. TRAINING FACILITIES AGRICULTURAL CROP PRODUCTION The Agricultural workshop must be made of reinforced concrete or wooden structure. Based on a class intake of 25 students, the size must be suited on the requirements of the competencies. Note: Experimental farm will vary according to availability of land but not lower than the prescribe. • ** Circulation Area is equivalent to 30% of the total teaching/learning areas

  7. TRAINING FACILITIES BEAUTY CARE • The Beauty care workshop must be of concrete structure. Based on a class intake of 25 students, the space requirements must be suited on the requirements of the competencies.

  8. TRAINING FACILITIES FOOD PROCESSING The food processing workshop must be of concrete structure. Based on a class size of 25 students the space requirements for the teaching/learning and circulation areas are as follows:

  9. TRAINING FACILITIES CARPENTRY The food processing workshop must be of concrete structure. Based on a class size of 25 students the space requirements for the teaching/learning and circulation areas are as follows:

  10. TRAINING FACILITIES ELECTRICAL INSTALLATION & MAINTENANCE The Electrical Installation Maintenance workshop must be of concrete structure .Based on a class intake of 25 students/trainees, below are the space requirement & their sizes:

  11. TRAINING FACILITIES CONSUMER ELECTRONICS The Consumer electronicsworkshop must be of concrete structure .Based on a class intake of 25 students/trainees.Recommended space requirements for the various teaching/learning areas are as follows: