DOE REVIEW TASK C May. 14-16, 2007 WORK AT SLAC – Babar & ILC

DOE REVIEW TASK C May. 14-16, 2007 WORK AT SLAC – Babar & ILC. R. Prepost Faculty S. Dasu Faculty H. Band Senior Scientist K. Flood PostDoc

thuong
Télécharger la présentation

DOE REVIEW TASK C May. 14-16, 2007 WORK AT SLAC – Babar & ILC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DOE REVIEW TASK C May. 14-16, 2007 WORK AT SLAC – Babar & ILC R. Prepost Faculty S. Dasu Faculty H. Band Senior Scientist K. Flood PostDoc M. Pierini PostDoc (Now CERN Fellow) Students J. Hollar Graduated (Now LLNL PostDoc) C. Vuosalo Started 6/06 M. Anderson Started 6/06 DOE Review 5/14-16/07

  2. Former Group Members • Erez Etzion, Scientist Professor Tel Aviv University • Francesca Di Lodovico Lecturer Queen Mary College, University of London • Ajit Mohapatra UW CMS Staff • Maurizio Pierini CERN Fellow • P. Tan Fermilab CMS PostDoc • J. Hollar LLNL CMS PostDoc • A. Eichenbaum DotCom Software Company Past Task C Collaborations • e+e- MAC Detector (PEP 1) SLAC • e+e- SLD Detector (SLC) SLAC • Polarized Spin Structure Functions SLAC Fixed Target E142, E143, E154, E155 DOE Review 5/14-16/07

  3. BaBar Physics Analysis BaBar System Work IFR Muon System Management BaBar Particle ID Muon ID/Neural Net Development ILC Polarized Photocathode R&D Source Laser Development Proposal for Muon System R&D KPIX ADC IC Testing Task C Activities DOE Review 5/14-16/07

  4. DOE Review 5/14-16/07

  5. ICHEP08 Double again from 2006 to 2008 Double from 2004 to 2006 ICHEP06 Projected data sample growth 20 Integrated Luminosity [fb-1] 17 12 Lpeak = 9x1033 DOE Review 5/14-16/07

  6. Babar AnalysesCompleted Theses DOE Review 5/14-16/07

  7. Babar Current Analyses Electroweak Penguins C. Vuosalo M. Pierini Co-Convener of Two-Body Charmless B Decay Analysis Group Group Published Babar Papers Penguin Analyses - 5 Papers UT Fit – 4 Papers RPC Detector - 4 Papers DOE Review 5/14-16/07

  8. DOE Review 5/14-16/07

  9. Papers • EichenbaumPRL 93, 21804 (2004); PRD 72, 052004 (2005). • Ping/DasuPRD 70, 112006 (2004); PRL 94, 011801 (2005). • HollarLepton Photon 05 Paper; PRD 73, 092001(2006). • Band (IFR) NIM A552, 27 (2005); NIM A539, 155 (2005); NIM A538, 801 (2005). • Prepost Appl. Phys Lett. 85, 2640 (2004). • Pierini JHEP 0603, 080 (2006); PRD 72, 051103 (2005); PRD 71, 111102 (2005); PRL 95, 011801 (2005). DOE Review 5/14-16/07

  10. DOE Review 5/14-16/07

  11. DOE Review 5/14-16/07

  12. RPC Management RPC Studies and Gas Chemistry Forward EndCap Upgrade Complete RPC Operations – Band and Students BaBar System Work - Band BaBar Particle ID –Flood/Band/Vuosalo • Muon Identification • K. Flood PID Group Co-Convener 2006 DOE Review 5/14-16/07

  13. Babar Near Term Plans 2007 (Analyses using 500 fb–1) • Complete D mixing analysis • Use complete dataset through 2007 (K. Flood) • Complete b  s l+ l– analysis including asymmetries • Improvements from NN m ID and reconstruction of several Xs final states, much like in Eichenbaum b  s analysis (K. Flood) • Continue Global analysis of CKM parameters • Add new results from BaBar and Belle (Completion of M. Pierini Work ) • Time dependent CP asymmetries (Pierini - Finish up Summer 07) • Update of B  K K K analyses • Update of B  K 0 analysis • New study of B  K +– analysis • Rare decays Finish B  l+l– analysis • Recoil technique to study difficult rare decays (C. Vuosalo) • Improve the technique to study, e.g., B  K and B  K  DOE Review 5/14-16/07

  14. Babar Long Term Plans > 2008 (Analyses using 800 fb–1) • Measure CKM parameters in rare decays • Continue to probe for deviations from Standard Model • Semi-inclusive b  s l+ l – • Improve ACP and forward-backward asymmetry zero-crossing point • Recoil method • Fully reconstruct one B to reduce backgrounds • Reduced signal statistics compensated by improved systematics • Cleaner samples of inclusive decays of the other B • Access to rare decays with neutrinos, Knn, Ktt DOE Review 5/14-16/07

  15. ILC Polarized Source • Proposal to ILC Accelerator R&D at Universities. DOE Awards FY04 FY05 FY06 of $34.6k/FY • Budget used for X-Ray Analysis, SIMS Analyses and Photoluminescence Hardware. • Group expands effort to include full electron polarized source system. DOE Review 5/14-16/07

  16. Components of Polarized Source R&D • Source Laser R&D • Photocathode Structures • Measurement of Photocathode Spin Relaxation Times: Faraday Rotation (new experiment & setup) DOE Review 5/14-16/07

  17. Polarized Source R&D Program DOE Review 5/14-16/07

  18. DOE Review 5/14-16/07

  19. Cathode Structure R&D DOE Review 5/14-16/07

  20. Faraday Effect Rotation to Measure Spin Relaxation Times • Prepare Pump/Probe Laser Pulses with Variable Probe Delay Time. • Pump with Circularly Polarized Light to Create Polarized Electrons in the Conduction Band. • Probe with Linearly Polarized Light Laser Pulse at Time t wrt Pump. • Measure the Rotation Angle of the Linear Polarization as a Function of time t. The Rotation Angle is Proportional to the Polarization. • A Series of Measurements will give P(t) and thus the Relaxation t. • Obtained a laser with femtosecond pulses to be able to measure picosecond values of t. DOE Review 5/14-16/07