1 / 21

EWEC 2007 – Milan, 2007 May 9th

Wind Development Strategies: environmental acceptance and critical aspects Luigi La Pegna Head of Projects – Renewable Energies Business Unit luigi.lapegna@enel.it. EWEC 2007 – Milan, 2007 May 9th. Summary. Overview on Enel’s Renewables Wind Investment Strategies and Targets

Télécharger la présentation

EWEC 2007 – Milan, 2007 May 9th

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind Development Strategies:environmental acceptance and critical aspectsLuigi La Pegna Head of Projects – Renewable Energies Business Unitluigi.lapegna@enel.it • EWEC 2007 – Milan, 2007 May 9th

  2. Summary • Overview on Enel’s Renewables • Wind Investment Strategies and Targets • Wind Environmental acceptance and critical aspects

  3. A brief overview of Enel • Enel is the third* largest listed utility in Europe with a market capitalisation of EUR 50 billion. • The Italian Economy Ministry owns 31.6 %** of the company, leaving a free-float of some 70%, with 2.3 million shareholders. • Its 58.548 employees work in 16 countries, producing and distributing power and gas in Europe, North & Latin America. • Thanks to the strong commitment to Corporate Social Respon-sibility, Enel has been included in the world’s most selective ethical indexes, such as the Dow Jones Sustainability Index. Enel aims to be the most efficient, market driven, quality focused provider of power and gas, creating value for customers, shareholders and people * as of 28th March 2007 ** 21,4% directly and 10,2% indirectly through state-run lender Cassa Depositi e Prestiti

  4. Generation capacity (GW) Customers (mn) EBITDA (€bn) European players 2006 (1) (1) (1) (1) ()2 (1) (2) (1) (1) (2) One of the leading players in Europe Source: company reports. Data refer to 2006 unless otherwise stated. FY_05 Include Energy Only 1

  5. Canada22 MWHydro, biomass Italy 15,358 MW Hydro, geothermal, wind, solar USA 380 MWHydro, wind Guatemala69 MW - Hydro Slovakia 2.329 MW Hydro Costa Rica55 MW - Hydro, wind Brazil 97 MW - Hydro Panama300 MW - Hydro Spain900 MW Hydro, wind, cogeneration Chile100 MW - Hydro Worldwide renewables portfolio 20.000 MW worldwide, 600 MW wind farms

  6. Enel Wind Farms in Italy Domestic Generation & Energy Management 20 wind farms, 309 MW MONTARONE I4.3 MW COLLARMELE 9 MW CAMPOLIETO I e II5.6 MW TULA23.8 MW ACQUASPRUZZA2.45 MW ALTANURRA12.3 MW SERRA CORTINA2.6 MW LITTIGHEDDU27+27 MW MONTEARCI10.9 MW SERRA MARROCCO46.7 MW CONTRADA CORVO-COZZO MITURRO38.3 MW MONTE ZIMMARA 27,2 MW CALTABELLOTTA 7.5 MW COZZO VALLEFONDI 10,2 MW SCLAFANI BAGNI I e II15.8 MW CARLENTINI 7.3 MW

  7. Domestic Generation & Energy Management Renewables development in Italy 24,6 (**) Hydro 1,4TWh In project 20 (*) Wind 11,4 TWh 15,0 Biomass 2,2 TWh In operation 9,2 New producibility for Green Certificates Kyoto objectives and RES directive (*) additional to reach Directive UE 01/77 for 75 TWh (**) GSE: plants qualified at 30/06/2006; includes also revamping

  8. Enel’s Production Mix <1% Domestic Generation & Energy Management Environmental impact Assessment

  9. Environment and innovation Growth in renewables – Italy and International • 1,500 MW in wind • 100 MW in hydro • 100 MW in geo Growth in renewables € 3.3 bn • Innovative solution for renewable energy • Energy efficiency and distributed generation • Toward “zero emissions” and the hydrogen frontier Innovation projects € 0.8 bn An ambitious plan built on material projects

  10. Growth in renewables 2003-2006 2007-2011 ITALY - Domestic Generation & Energy Management • 13 plants started up in 2006 • 44 MW additional renewable capacity achieved in 2006 • 400 MW of additional domestic capacity in 2007-2011 Investments (€bn) Delivering Enel’s strategy in renewables

  11. ITALY - Domestic Generation & Energy Management Off Shore Wind Farms • Present situation: rapid development of technology in Northern Seas and no installation in Mediterranean Sea • Off-shore wind farm in Italy defined as part of Enel Business Plan • Design and execution plan started in 2005 and undergoing. • Site definition within 2007, environmental studies and authorization within 2009. • Realization of 1 or 2 off-shore wind farms in Italy (50 to 200MW) within 2011

  12. Critical to wind developmentPublic opinion opposition 12 december 2006, four different Italian regions

  13. 11 stamps !! Authorization 16 months from presentation (dec 04 – may 06) Critical to wind development Bureaucracy Replacement of 8 old WTGs (not working) with new WTGs. Same number, same dimensions, same power

  14. Wind installation in Europe New installations 2006 Germany 2,233 MW + 12% Spain 1,587 MW + 16 % Denmark 22 MW - Italy 421 MW + 24%

  15. Mainly prejudices, few real criticalities Critical to wind development Main items As commonly reported • Visual impact • Noise • Impacts on birds and wildlife • Electromagnetic pollution

  16. Visual impact: the past

  17. Visual impact Enel project advise in lay-out definition • Avoid “forest” effect • Underground paths for power cables • Accurate definition of plant internal roads and finitures through condivision with local population • Specific attention to maintenance of wind farms through operational period Tula wind farm (Sardinia) “Sa Turrina Manna”

  18. Visual impact Colours • Advanced WTGs design and study of colours effect in different seasons • WTGs transformer internal at supporting tower Spring Wind Farm Sclafani Bagni (Sicily) “Incatena Cugno” Fall

  19. Visual impact Transportation and erection • Accurate study to minimize impact and reduce service infrastructures at minimum essential • Fast and efficient restoring of ‘ante operam’ conditions after erection and in final plant dismountling phase.

  20. Utah California U.S. Desert Sardinia, Enel Plant

More Related