1 / 25

Performance-Based Navigation (PBN) Concept & Change - ICAO Performance Symposium

This presentation discusses the concept and change involved in Performance-Based Navigation (PBN). It covers elements such as navigation application, navigation specification, and navaid infrastructure.

tmeachum
Télécharger la présentation

Performance-Based Navigation (PBN) Concept & Change - ICAO Performance Symposium

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PBNPerformance BasedNavigation Concept & Change - ICAO Performance Symposium March 2007 FederalAviation Administration Presented by: Lex Hendriks, EUROCONTROL

  2. 3 NAVIGATION APPLICATION NAVIGATION SPECIFICATION 2 NAVAID INFRASTRUCTURE 1 Elements of PBN Concept 3 1 2

  3. 3 NAVIGATION APPLICATION NAVIGATION SPECIFICATION 2 NAVAID INFRASTRUCTURE 1 Elements of PBN Concept 3 1 2

  4. Elements of PBN Concept- Navaid Infrastructure - • Ground-based Navigation Aids (Navaids) • VOR; DME; (Not NDB) • Space-based Navaids • GNSS • GPS; Glonass; futureGalileo NAVAID INFRASTRUCTURE 2 1

  5. 3 NAVIGATION APPLICATION NAVIGATION SPECIFICATION 2 NAVAID INFRASTRUCTURE 1 Elements of PBN Concept 3 1 2

  6. Elements of PBN Concept- Navigation Specification - International Navigation Specifications published in Volume II of PBN Manual Aim is to limit number of Nav. Specs in global use • What PERFORMANCE is required of the RNAV system? • What Functionalities must RNAV system have to achieve Performance • What Navigation Sensors must be integrated in RNAV system to achieve Performance • What requirements are placed on the Air crew to achieve the required Performance from the RNAV system? Accuracy Integrity Continuity Availability NAVIGATION SPECIFICATION 3 2 Document used by State as basis for developing Certification & Operational Approval

  7. International Navigation Specifications published in Volume II of PBN Manual • PERFORMANCE • Functionalities • Navigation Sensors • Air crew requirements Previous RNP Concept NAVIGATION SPECIFICATION 3 2 Document used by State as basis for developing Certification & Operational Approval Elements of PBN Concept- Navigation Specification -

  8. RNAV RNP Elements of PBN Concept- Navigation Specification - International NS in Volume II of PBN Manual NAVIGATION SPECIFICATION 3 2 • RNAV System PERFORMANCE Document used by State as basis for Certification & Operational Approval Better Performance On-Board performance Monitoring and Alerting

  9. RNAV RNP Elements of PBN Concept- Navigation Specification - On-Board performance Monitoring and Alerting • On-board performance monitoring and alerting does not only refer to ‘containment’ in the MASPS; Annex 11 or PANS-OPS. • On-board performance monitoring and alerting allows the air crew to detect that the RNAV system is not achieving the navigation performance required of the RNAV system

  10. Elements of PBN Concept- Navigation Specification - ICAO NAVIGATION SPECIFICATIONS RNAV SPECIFICATIONS RNP SPECIFICATIONS International NS in Volume II of PBN Manual

  11. RNAV X RNP X RNP descriptor RNAV X RNP X Elements of PBN Concept- Designation - NAVIGATION APPLICATION 1 NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE 3 2 B-RNP 1 RNAV 10 RNAV 5 RNP APCH RNP AR APCH RNP APCH B-RNP 1 RNAV 10 RNAV 5 RNP AR APCH X = Navigation Accuracy in NM

  12. 3 NAVIGATION APPLICATION NAVIGATION SPECIFICATION 2 NAVAID INFRASTRUCTURE 1 Elements of PBN Concept 3 1 2

  13. Elements of PBN Concept- Navigation Application - NAVIGATION APPLICATION 1 3 • The APPLICATION (use of) the Navigation Specification and Navaid Infrastructure - • For example: Routes based on RNAV and RNP Specifications (these rely on theNavaid Infrastructure); • For example: SIDs/STARs based on RNAV and RNP Specifications; • For example: Approach procedures based on RNP Specifications

  14. 3 NAVIGATION APPLICATION NAVIGATION SPECIFICATION 2 NAVAID INFRASTRUCTURE 1 Elements of PBN Concept 3 1 2

  15. RNAV 1 APPLICATION ICAO RNAV 1 SPECIFICATION NAVAID INFRASTRUCTURE Example: RNAV 1 Specification • PERFORMANCE • Functionalities • Navigation Sensors • Air crew requirements Navigation Sensors (1) DME/DME/IRU (1) DME (2) DME/DME (2) DME (3) GNSS (3) GPS

  16. E.G: RNAV 1 Specification (A) 1 STATE (A) RNAV 1 APPLICATION State A 3 2 STATE (A) RNAV 1 SPECIFICATION NAVAID INFRASTRUCTURE Navigation Sensors (1) DME/DME/IRU (1) DME (3) GNSS (3) GPS

  17. E.G: RNAV 1 Specification (B) 1 STATE (B) RNAV 1 APPLICATION State B 3 2 STATE (B) RNAV 1 SPECIFICATION NAVAID INFRASTRUCTURE Navigation Sensors (1) DME/DME/IRU (1) DME (2) DME/DME (2) DME

  18. NAVIGATION APPLICATION NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE Context of PBN Airspace Concept Airspace Concept COM NAV ATM SUR PBN

  19. Concept Summary (1) NAVIGATION APPLICATION • Use of Navigation Specification & Navaid Infrastructure (together) PBN NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE • RNAV SYSTEM PERFORMANCE • Functionalities • Navigation Sensors • Air crew requirements • Ground Based Navaids • Space-Based Navaids

  20. RNAV X RNP X RNP descriptor RNAV RNP Concept Summary (2) 1 NAVIGATION APPLICATION (Use of NS & NI) 3 2 NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE (Ground- Space-based) (RNAV System Perf.) X X

  21. Concept Summary (3) NAVIGATION SPECIFICATION RNAV RNP

  22. Concept Summary (3) NAVIGATION APPLICATION RNAV RNP

  23. Previous RNP Concept Why Change to PBN? • PERFORMANCE • Functionalities • Navigation Sensors • Air crew requirements • Proliferation of national standards • Wide variety of functional requirements • Variety of required navigation sensors • Differing air crew requirements • Lack of global harmonsiation Publication of PBN navigation specifications seeks to limit number of certification standards

  24. PBN BENEFITS • Reduction to number of sensor-specific routes • Allows more efficient use of airspace • Clarifies how RNAV systems are to be used • Facilitates operational approval process for operators by providing limited set of navigation specifications intended for global use • Provides potential to exploits capabilities of advanced RNAV systems • Enables navigation applications for Terminal Airspace

More Related