Fuji Test Beam Line commissioning

Fuji Test Beam Line commissioning. Y.Sudo Univ. of Tsukuba. Room for test beam @Fuji B3. We can control currents of magnets from this room. Network is ready. position of magnets and monitors ( Fuji strait section ). Target + rate monitor. Electron monitor(strip scintillator ). M1. M2.

tolla
Télécharger la présentation

Fuji Test Beam Line commissioning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fuji Test Beam Linecommissioning Y.Sudo Univ. of Tsukuba

  2. Room for test beam @Fuji B3 We can control currents of magnets from this room. Network is ready.

  3. position of magnets and monitors(Fuji strait section) Target + rate monitor Electron monitor(strip scintillator ) M1 M2 M3 M4 M5 M6 Trigger counter Beam shutter M7 10/11 at 18:00 Magnets are turned on with 3.0GeV/c. 10/12at 11:00 HER started injection of beam. lead-glass counter

  4. Beam shutter Beam shutter Concrete block Beam line This stage is able to move only vertically. Controller of the stage

  5. Result of last week and plan • HER 700mA, LER 1200mA • We observed beam ~30Hz. • Beam energy looks constant. • (according to oscilloscope) • When shutter is closed, rate of • the beam goes down 0Hz. • Plans of this week • Measurement of correlation • between beam intensity and • - HER current • - condition of the vacuum • correlation of intensity between upper side of shutter and lower side • Measurement of beam profile with electron monitor. • Adjustment of magnets • adjust currents of B2-4 between -1% and +1% Pulse shape of lead-glass counter