Train Presentation Update Aug 2011
100 likes | 253 Vues
Train Presentation Update Aug 2011. Simon Crabtree & Marc Silverwood. Train Presentation. Background Train Presentation covers all aspects of Cleaning and Maintenance within Northern’s Engineering department, with 290 trains (644 Vehicles) covered by our three main depots
Train Presentation Update Aug 2011
E N D
Presentation Transcript
Train Presentation Update Aug 2011 Simon Crabtree & Marc Silverwood
Train Presentation • Background • Train Presentation covers all aspects of Cleaning and Maintenance within Northern’s Engineering department, with 290 trains (644 Vehicles) covered by our three main depots • Neville Hill (East) • Heaton (North) • Newton Heath (West) • 320 Train Presentation staff carry out cleaning duties 7 days a week • Methods • C6 Works • B Exam Work • Periodic Heavy Cleaning • Night Cleaning • Turnaround Cleaning • Onboard Cleaning
MonitoringStandards • Cleaning Standards Manual • Train Presentation Auditor • NPS (National Passenger Survey) results • Customer Surveys are conducted in the Spring and Autumn every year • Service Quality Regime • Audits are carried out by Lloyds Register Rail and the local PTEs for each PMU • Train Crew • Litter picks and reporting defects
Project Updates • Toilet Project • Tanking facilities throughout Northern to be reviewed • New chemicals/Products (Odour Master, Toilet Duck & Sanitising Wipes) • Reduction of track contamination (CET, Low speed flush system) • NPS Project • Poster campaigns will be launched this year to promote upgrades • Heavy Cleaning Focus • VMI changes for increased interior maintenance on all fleets Closed
District West Operations • CleaningLocations • Onboard Team (Piccadilly Based)
Improving the Future • Environmental Impact • Chemical Usage & Low Hazard, Water Management, Equipment lifespan • New Intranet Page • A source for all train presentation reports and information • SQ Database (Fleet Database) • Monitor all vehicle condition defects for B exams (Live) • SQ Reports • A suite of reports has been developed to highlight issues • Cleaning & Maintenance KPI • Enhance ownership within Engineering teams • High Profile Uniform • All front line staff have been issued with new branded uniform
National Passenger Survey • Staff briefs • VMI changes • Vehicle refresh work • Staff briefs • Cleaning processes • Facility improvements • Chemical improvements
No of Staff • Background into re org • working 1 over establishment due to relocation of conductor • Issues affecting i.e. tanking at Lpool and TPL starting trains, benefits of this • Thanks for Audits from Edge Hill • Relationships with Alstom, i.e. Longsight improvements • Current SQ Position • 158 CET installation