1 / 18

550 M EURO investment need for harmonization Serbian waste management and EU landfill Directive

550 M EURO investment need for harmonization Serbian waste management and EU landfill Directive. John Glazebrook, Arunas Kundrotas, Srdjan Radovic, Goran Vujic.

torn
Télécharger la présentation

550 M EURO investment need for harmonization Serbian waste management and EU landfill Directive

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 550 M EURO investment need for harmonization Serbian waste management and EU landfill Directive John Glazebrook, Arunas Kundrotas, Srdjan Radovic, Goran Vujic ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  2. Directive Specific Implementation Plan (DSIP) for justification for transitional periods for Directive 1999/31/EC of 26 April 1999 on the landfill of waste ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  3. Corresponding White Papers • WP 1. Landfill Cover Options in the Republic of Serbia • WP 3. Methodology for Performance of Investigation Works and Assessment of Risks at Waste Dumps and Landfills to Determine Proper RecultivationMethod • Cost assessment for closure ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  4. Number of non-compliant landfills according to regions ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  5. Closing landfills • 3582 landfills and dumpsites • Directive establishes requirements for closing • Possible to reduce requirements = costs based on risk assessment • Assessed risk for 214 landfills: • High risk – 141 • Medium risk - 71 • Low risk - 2 • Includes all municipal landfills, as well as the dumpsites bigger than 10 000 m3 ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  6. Recultivation options • Different recultivation regimes proposed for following groups of landfills: • Landfills below 1,000 m3 • Landfills from 1,001 m3 to 10,000 m3 • Landfills from 10,001 m3 to 100,000 m3 • Landfills above 100,000 m3 • Options: • Waste loading and removal to landfills to be closed with appropriate cover • Covering with simple earth cover • Covering with earth cover and water impermeable layer without gas drainage layer • Covering with earth cover and water impermeable layer including gas drainage layer ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  7. Cost of closure of landfills according to stages during period 2014 - 2028 ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  8. Activities • National plan for biodegradable waste to be developed • Need for implementation dates complying with reduction targets: • Not later than five years after ??? biodegradable municipal waste going to landfills must be reduced to 75 % of the total amount of biodegradable municipal waste produced in 1995 • Not later than eight years 50 % • Not later than 15 years 35 % • Composting is assumed as cheapest solution for the DSIP development ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  9. Corresponding White Papers • WP 2. Typical components for the Regional Waste Management System in the Republic of Serbia • Cost assessment of new infrastructure components ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  10. RWMS components. First phase • Sanitary landfill - first cell (5-7 ha) of landfill body • Transfer stations - where economically feasible • Primary separation - separation into two fractions (dry and wet, two containers system) • Collection system – trucks • Secondary separation - separation plant for secondary separation of pre-sorted waste(one per region) • Composting - one site per region • Recycling sites – one recycling site per municipality • Close of non compliant landfills ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  11. RWMS components. Necessary and optional • Sanitary landfill - first cell (5-7 ha) of landfill body • Transfer stations - where economically feasible • Primary separation - separation into two fractions (dry and wet, two containers system) • Secondary separation - separation plant for secondary separation of pre-sorted waste(one per region) • Composting - one site per region • Recycling sites – one recycling site per municipality • Close of non compliant landfills ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  12. Elements of RWMS infrastructure

  13. Costs of elements of RWMS infrastructure

  14. Managing costs of implementation • 550 MEUR • Main factors to consider: • Implementation time • Phases for implementation • Extent and quality of new infrastructure ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  15. Time management • Total costs 550 MEUR • National Waste Management Strategy implementation deadline 2019 (for both new infrastructure and closure) • Remaining 6 years (2014 – 2019) • 92 MEUR/year • NEAS - 2019 membership date • + 9 years as transitional period (2014- 2028) • 550 MEUR : 15 years = 37 MEUR/year ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  16. Phased approach • 550 MEUR = 300 MEUR (new infrastructure) + 250 MEUR (closure of non-compliant sites) • Closure of landfills and dumpsites is not required by date of accession and it is not strict requirements in the negotiating position • Possible choices when to address closing component: • During second stage after the new landfill is established? • In package with establishment of the new landfill? • Move closing to later stage and not to consider financing such costs from 2014 – 2020 financial perspective • Etc. ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  17. Phased approach • 300 MEUR • 300 MEUR : 6 years = 50 MEUR/year • 300 MEUR : 15 years = 20 MEUR/year • Postponing major closure costs and dealing only with prevention of disposal (fencing, supervision, enforcement) ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG

  18. Extend and quality of new infrastructure • Costs will increase if to aim for more sophisticated equipment or increasing number of components • MBT instead of separation line of presorted waste • Increasing number of transfer stations, recycling or composting sites • Current calculation includes simplest solutions ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA – MEDEP – IMG