1 / 12

Nasim Fatemi-Ghomi

Double Beta Decay Study of 150 Nd. Nasim Fatemi-Ghomi. Introduction. Data Selection. Data taking time =422.665 days = 1.16 yr - 348.036 days=0.95 yr (status=1) Dubna-2006 - 74.629 days=0.21 yr (status!=1)

tovah
Télécharger la présentation

Nasim Fatemi-Ghomi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Double Beta Decay Study of 150Nd Nasim Fatemi-Ghomi

  2. Introduction Data Selection • Data taking time =422.665 days = 1.16 yr • - 348.036 days=0.95 yr (status=1) Dubna-2006 • - 74.629 days=0.21 yr (status!=1) • Events should come from Nd2O3. The foil has 57g mass (37g pure 150Nd). Analysis tool Used UCL OO framework written by V.Vasiliev.

  3. External Background & Background on the Surface of the Wires and Foils. Internal Background Found by V.Vasilev checked with Cu foil

  4. Pre-selection for 150Nd to 2 events: • Two negatively charged tracks associated with isolated PMTs and • E1 ,E2 > 0.2 MeV. • Both electrons originate from a common vertex • with |∆r| < 2 cm & |∆z| < 4 cm. • Internal TOF hypothesis > 4% & external TOF hypothesis < 1%. • Track starts from layers 1 & 2 of GG. • No delayed alpha decay with refiring time > 70 s. • No single or group delayed hit(s).

  5. 150Nd Half-life (with Status ==1) 1.11e-19 0.030 0.01988 9.22e-4

  6. 150Nd Half-life (status !=1) • Problems with PMs during runs (status 2 &10). 83 events • Problems with Geigers during run (status 3 &100). 12 events • Less than ~24 hours after absolute calibration (status 4 & 1000). 27 events • Less than ~24 hours after general HV shutdown (status 5 &10000) / less than ~24 hours after HV shutdown of 1HV board (status 20000). 51 events • Problems with ventilation, high radon rate (status 6&100000). 15 events • No laser run for day correction (status 1000000) 28 events

  7. Combined good and bad runs

  8. Half-life result for good and bad data. Good data: Number of data events: 1055 Number of total background: 315 Efficiency: 6.75% T12= 9.23 -0.40+0.43(stat)  0.82(syst) x 1018 y Bad data: Number of data events: 216 Number of total background: 78 Efficiency: 6.70% T12= 10.5 -1.0+1.3(stat)  0.96(syst) x 1018 y The results are consistent  Can combine the data

  9. Half-life result for the combined data Number of data events: 1271 Number of total background: 412 Efficiency 6.74% T12= 9.46 -0.37+0.41(stat)  0.85(syst) x 1018 y

  10. Preliminary 0 result using MCLIMIT Number of generated 0 = 50000 Number of accepted events = 3943 Using 1-dim histogram: Esum for all energy regions (E1+E2>0.4 MeV) Limit on half-life with 90% CL: T120 >2.73 x 1020 y

  11. Summary • Half-life was extracted for good data and bad data separately and the result for the half-life was consistent. • The half-life was extracted for the combined data. • Avery preliminary result on limit on T120 was presented. • Have to start working with Phase II Data!! • + • The first draft of a technical note on 150Nd2 (phaseI) analysis is written!

More Related