1 / 12

Wayne Bexton – Head of Energy Services

Wayne Bexton – Head of Energy Services. Project Overview. “A Smart Energy Management System integrating Renewable Energy and Electric Vehicles” September 2017 to March 2021 Funding €918,684 Interreg NWE £193,497 Innovate UK NCC match (EDF, GUL, Fleet Replacement). Project Overview.

tpfister
Télécharger la présentation

Wayne Bexton – Head of Energy Services

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wayne Bexton – Head of Energy Services

  2. Project Overview • “A Smart Energy Management System integrating Renewable Energy and Electric Vehicles” • September 2017 to March 2021 • Funding • €918,684 InterregNWE • £193,497 Innovate UK • NCC match (EDF, GUL, Fleet Replacement)

  3. Project Overview • 9 partners in 6 countries • Led by City of Arnhem • Range of Partners (inc. Leicester City Council) • Transport/Energy relationship

  4. Project Overview

  5. Components • 40 battery electric V2G compatible vans and cars

  6. Components • Up to 40 V2G bi-directional charging units

  7. Components • Installation 89kW of solar PV on the Tamar Building, 30kW on the Tyne Building and 63 kW on the Humber Building

  8. Components • Procurement and installation of a 378kW/678kWh lithium Ion battery

  9. Components • A purpose built ‘Interoperable Energy Management System’ (iEMS).

  10. Aims and objectives • Aim: • To develop and test the iEMS • Objectives: • Maximise use of locally generated renewable energy in office buildings and when charging ULEVs in order to reduce running costs and carbon emissions • Reduce grid peak demand by using vehicles for short-term storage, feeding residual charge back into the grid as required • Explore other financial benefits associated with large scale and aggregated battery storage

  11. Aims and objectives

  12. Any Questions?

More Related