Download
slide1 n.
Skip this Video
Loading SlideShow in 5 Seconds..
FORT BLISS HOSPITAL REPLACEMENT PROJECT EL P ASO, TEXAS PowerPoint Presentation
Download Presentation
FORT BLISS HOSPITAL REPLACEMENT PROJECT EL P ASO, TEXAS

FORT BLISS HOSPITAL REPLACEMENT PROJECT EL P ASO, TEXAS

252 Vues Download Presentation
Télécharger la présentation

FORT BLISS HOSPITAL REPLACEMENT PROJECT EL P ASO, TEXAS

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. FORT BLISS HOSPITAL REPLACEMENT PROJECT EL P ASO, TEXAS El Paso Community College Contractors Networking & Teaming Forum January 17, 2012 Jeffrey Allen, Senior Project Manager, USACE, Ft. Worth District Mitchell Alguadich, Senior Project Manager, HDR Architects Maurice Salata, Senior Architect, HDR Architects

  2. Contractors Networking & Teaming Forum • Project Team • Overview • Project Award Packages • Projected Schedule • HDR Presentation 2

  3. Project Team HA/TMA – Health Affairs/Tricare Management Activity ACSFAC (MEDCOM) – Assistant Chief of Staff, Facilities HFPA – Army Health Facilities Planning Agency WBAMC – William Beaumont Army Medical Center USACE Ft. Worth District / Ft. Bliss Program Office Ft. Bliss Garrison Contractors Infrastructure Project – Sundt Construction, Inc. Water Tower Project – Jamco Ventures, LLC

  4. Overview • Ft. Bliss Hospital Replacement project includes a 1.132 M square foot World-Class Medical Facility • Replaces William Beaumont Army Medical Center (WBAMC) • Design-Bid-Build execution • Campus buildings & features include - hospital, clinics, admin, research, central utility plant, access control points, therapeutic gardens, nature trails, and surface parking • The Project Delivery Team have endeavored to incorporate state-of-art design ideas including the latest in Evidence-Based Design (EBD) and Sustainability as well as design innovations promoting family and patient-centered care

  5. Project Award Packages *Dates subject to change 5

  6. Projected Schedule(calendar year) Current Quarter Legend *Dates subject to change Construction Duration Construction in-Progress/Duration Construction Completion Initial Outfitting / Transition FOD – Facility Operations Date 6