1 / 5

Dimp distribution integrity management program

Dimp distribution integrity management program. Where we stand. 1) how will dimp change the way your company performs operation and maintenance work? A) more paper work B) adding EFV valves (tracking performance)

trent
Télécharger la présentation

Dimp distribution integrity management program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dimpdistribution integrity management program Where we stand

  2. 1) how will dimp change the way your company performs operation and maintenance work? • A) more paper work • B) adding EFV valves (tracking performance) • I can think of no real changes in our O&M procedures as we already prioritize our system needs

  3. Progress made so far in preparation for DIMP • There have been several systems upgrading their maps, not necessarily in preparation for DIMP, but because it was needed, and with the new mapping technologies available it was just time to do it. • Waiting for the Shrimp program from APGA

  4. What issues we expect to receive the greatest focus as we prepare for DIMP • Mapping; as our systems have grown a lot of the maps have not been kept up to date. • A lot of the additions have not been transferred to the main map, now they have several small maps to reference,. And some have penciled in the changes on the large map

  5. The most challenging part of the regulation to implement • RE-evaluation for effectiveness; and show improvement. • For instance, this year we had 2 dig-ins, but there was almost no activity, in 2 years there are 10. but there was a lot of activity, we are not sure the one call slips are going to reflect what really transpired

More Related