Special considerations regarding the development of cost models in small countries

Special considerations regarding the development of cost models in small countries IIR‘s Telecoms Cost Accounting Conference 2009, Dubai 25th – 29th October 2009. SBR.

triage
Télécharger la présentation

Special considerations regarding the development of cost models in small countries

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Special considerations regarding the development of cost models in small countries IIR‘s Telecoms Cost Accounting Conference 2009, Dubai 25th – 29th October 2009

  2. SBR SBR Juconomy Consulting AG offers sound business, technical, regulatory and legal advice on regulated markets in the telecoms sector and other network industries (post, electricity, gas, railways), as well as the media and information technology (ICT) segments Established 1st March 2004 Practices in Düsseldorf and Vienna 07.08.2014 2

  3. SBR Broad international project experience in Europe, the Middle East, Asia, Africa and the Pacific Afghanistan, Austria, Bahrain, China, Czech Republic, France, Germany, Ghana, Greece, Italy, Kosovo, Madagascar, Namibia, Netherlands, Norway, Oman, Poland, Romania, Samoa, Saudi Arabia, Slovenia, Spain, Switzerland, Tunisia, UAE, UK 07.08.2014 3

  4. SBR‘s experiences from cost modelling • Top-down and bottom-up cost models • Models for regulators, operators and industry organisations • Cost models provided in e.g. Germany, Austria, Afghanistan, Samoa etc. • Projects on regulatory cost issues in Germany, Austria, Bahrain, UAE, Madagascar etc. 07.08.2014 4

  5. Content Introduction Establishing Cost Models in Small Countries Doing Cost Assessments in Small Countries Summary 07.08.2014 5

  6. Introduction Aspects • Listenpunkt • Listenpunkt • Listenpunkt • Listenpunkt • CM are required for both operators and regulators. • Aims of CM are e.g. to set prices (through regulator or operator), decide on investments and acquisitions. Cost models (CM) • Operators and regulators in small countries faces some different considerations  e.g. smaller networks, smaller and/or less operators, less economies of scale. • Definition of a small country: one with less than 1-2 Mio. inhabitants. Small countries 07.08.2014

  7. Introduction Modelling decisions to be made are including a large set of aspects: • Cost Base (LRIC/LRIC+/ FAC/Marginal Costs) • HCA vs. CCA (w/o FL) • Bottom-up or top-down • Cost of capital (WACC CAPM or current costs) • Identification of cost drivers • Identification of CVRs (cost volume relationships) • Definition of services • Definition of business units 07.08.2014 7

  8. Special issues regarding CM in small countries Network design Issues for regulators Economical issues • Simple backbone network structures and traffic modelling • Small territory  No geographical deaveraging possible • More detailled modelling required • Large proportion of international traffic • Low economies of scale • Limited ressources for economic modelling • Low transmission costs but high OH costs • Centralized organisations • Few and/or small operators  Challenging competition situation • Less anonymous and more direct communication (?) • Limited resources 07.08.2014 8

  9. Cost modelling in small countries Situation in small countries Decisions to be made • Development of the models • Top-down vs. Bottom-up • FAC/FDC vs. LRIC • HCA vs. CCA • Definition of services and cost centers • Designing the network • Cost assessments • Operator to be modelled • Data gathering • Smaller networks but more detailled modelling • Small or no backbone / simple backhaul • Low transmission costs but high proportion of OPEX • Cost constraints on modelling • Challenging market situation for regulators • Direct communication 07.08.2014 9

  10. Content Introduction Establishing Cost Models in Small Countries Doing Cost Assessments in Small Countries Summary 07.08.2014 10

  11. Cost base: FAC/FDC vs. LRIC The pros and cons of FAC/FDC Pros • Implies low costs for the regulator • Lower requirements on the know-how of the regulator • Low risk of underestimating the costs Cons • Information asymmetries in combination with principal-agency problems makes it hardly possible for the regulator to approve the data delivery from the operators • Difficulties to define and quantify the allocation keys • Difficulties to exclude inefficiencies • Implies high costs for the operators • Updates of the cost models implies extensive work • Intransparent regulation as most data is not public 07.08.2014 11

  12. Cost base: FAC/FDC vs. LRIC The pros and cons of LRIC Pros • Incentives for operators to minimize costs • Excludes historic developments and sunk costs • Excludes inefficiencies • Enables bottom-up modelling  Less principle-agency problems • Implies low costs for the operators (due to limited data gathering) • Updating the cost models is relatively easy at a low cost Cons • Requires extensive knowledge for the establishment of the cost models in order to assess all relevant costs • Implies high costs for the regulator • Difficult to assess the incremental cost and to exclude inefficiencies in a top-down model • Risk of underestimating the costs 07.08.2014 12

  13. Cost base: FAC/FDC vs. LRIC * High setup costs but low costs of operation of the cost model 07.08.2014 13

  14. Top-down vs. Bottom-up and HCA vs. CCA Decision on top-down vs. Bottom-up as well as HCA vs. CCA depends inter alia on the decision on FAC vs. LRIC FAC/FDC • Top-down as bottom-up is hardly possible • Both HCA and CCA are available (Decision should depend on the age of the networks, historic development and development of equipment prices etc.) • Top-Down or bottom-up decision depends on aspects like the support from the operators and their accounting departments, certainties about inefficiencies and the definition of cost centers and services etc. • Based on the simplier network design in small countries, a bottom-up approach is often more appropriate for small countries • LRIC as cost standard is generally to be used with CCA LRIC 07.08.2014 14

  15. „Building the network“ within the model Characteristics of networks in small countries Implications for the network modelling • More detailed models required as the „law of large numbers“ does not apply. • Importance to downsize the networks (including number of nodes) in order to increase utilization. • Redundancy problems have high impact on costs • Compression is no large issue 1-3 core sites (switches and MSCs) – limited backbone Simple star-formed backhaul network Low traffic volumes Short distances 07.08.2014 15

  16. Modelling must be aligned with available data Garbage in – garbage out • A cost assessment based on modelling can never be better than the quality of the inputs. • If the model is more detailed than the availbale input variables, the outcome has no quality! 1. The cost modelling must be aligned with the data gathering process 2. Cost models must be adapted to each country 3. Tailormade cost models have a higher quality 07.08.2014 16

  17. Content Introduction Establishing Cost Models in Small Countries Doing Cost Assessments in Small Countries Summary 07.08.2014 17

  18. Definition of the „operator“ to be modelled Hypothetical operator One real operator Multiple real operators • The cost models are fed with input data for a virtual hypothetical operator • Enables easy use of benchmark data • Assessment effort is relativ low as only one operator is modelled • The costs are modelled for one operator and results are used for all market participants • Assessment quality and time needed rely on the one operator • Benchmark data can be used to a limited extent • The costs are modelled for all regulated operators • Assessment is time consuming as all operators must deliver input data • Benchmarks are less required as multiple input are delivered nationally Decision depends on national conditions, e.g. the number of operators, legal situation, market situation, aims of the regulator, age of the networks etc. 07.08.2014 18

  19. General quality aspects of data gathering Quality aspects Implications for the network modelling • Interaction with the operators has a large impact on quality. • National adaptation of cost models required. • Standardized cost models have the risk of lower quality. • International benchmarking and triangulation in the data gathering required. Garbage in – garbage out Understanding the deliverables Cross checking of the data 07.08.2014 19

  20. Challanges regarding the data gathering in small countries Data Gathering from operators a) Small countries have few operators  Heavy dependency on existing operators and difficulties to assess the quality of data. b) Distance to operators is limited enabling intense contact with operators as long as these are managed nationally c) As operators and regulator are relatively small, the resources are limited International benchmarks Challenge to adjust data from large countries to small countries  i.e.for network equipment, OPEX ratios and other mark-ups Miscellanious 3rd party resources (consultancy studies, white papers, ITU sources) mostly done for large countries 07.08.2014 20

  21. Content Introduction Establishing Cost Models in Small Countries Doing Cost Assessments in Small Countries Summary 07.08.2014 21

  22. Summary Cost modells in small countries • Small networks and regulators accompanied by limited resources • Required detailled modelling of networks (but therefore less modelling of backbone networks) • Dependancy on a small number of operators to deliver input data • Larger importance of OPEX relative to CAPEX than in bigger countries 07.08.2014 22

  23. Summary Expected results from the cost assessment in small countries • High proportion of fixed costs due to low volumes and less economies of scale  Traffic sensitive models and costs • Relatively high transmission costs due to low economies of scale • Network quality drives costs to a large extent  The degree of redundancy rapidly leads to low utilization • Relatively high OPEX due to low volumes • No or low backbone costs 07.08.2014 23

  24. Contact SBR JUCONOMY Consulting AG Vienna Office: Düsseldorf Office: Parkring 10/1/10 Nordstrasse 116 1010 Vienna 40477 Düsseldorf Austria Germany Tel: + 43-1-513 514 0-0 Tel: + 49-211-68 78 88-0 Fax: + 43-1-513 514 0-95 Fax: + 49-211-68 78 88-33 Lundborg@sbr-net.com