An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Funding Coordination Project Management Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION DURING DIKE OVERFLOW Tobias Kubetzek, Jesper Steuernagel, Hendrik Ramm, Nicole Saenger, Ulrich Zanke

  2. Introduction Introduction Experiment Set-up Dimensioning Measurement program Outlook • Urbanization brought a great damage potential to the areas along the rivers and to former floodplains. This trend has not been stopped yet • During the last flood periods several dams and dikes broke, causing enormous damage and the loss of many lives • As a consequence of the climate change the sea level and the river gauges will rise. Dikes existing could lose their protectional function within the next years • In the near future the majority of the German river dikes must be redeveloped 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 2

  3. Introduction Introduction Experiment Set-up Dimensioning Measurement program Outlook • Dikes effected by overflow must be built as an overflow structure, otherwise overflowing water erodes the top and the landside of the dike • In general erosion leads to a quick collapse of the dike • Common overflow section of dikes are protected by armourstones or concrete sealing. These methods are not suitable for the long distances of river dikes • Conventional structures of geosynthetics are not practicable for redevelopement 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 3

  4. Experiment set-up Introduction Experiment set-up Dimensioning Measurement program Outlook 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 4

  5. Experiment set-up Introduction Experiment set-up Dimensioning Measurement program Outlook • Full scale research dike (dimensions of a common dike along the Rhine, Germany) • A closed sheeting and a high capacity propeller pump enable the overtopping of the dike • Two experimental areas • Weir heads according to the width of the spillway slab 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 5

  6. Experiment set-up Introduction Experiment set-up Dimensioning Measurement program Outlook 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 6

  7. Experiment set-up Introduction Experiment set-up Dimensioning Measurement program Outlook • Revetment with new combinations of geosynthetics • Erosion control mat • Geogrid (top layer) • Non woven geotextile • Geogrid (bottom layer) • Top soil not as sacrificial layer but as part of the revetment • Stable with and without vegetation 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 7

  8. Experiment set-up Introduction Experiment set-up Dimensioning Measurement program Outlook • Fixing by pegs • State of construction • Worst case scenario • Stabilization by root penetration • Common loading case • Difficult to calculate • Laboratory test of shear resistance 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 8

  9. Dimensioning Introduction Experiment set-up Dimensioning Measurement program Outlook • Erosion of top soil and vegetation • Gliding of the top soil on the geosynthetics • Gliding of the geosynthetics on the ground • Erosion beneath the geosynthetics • Failure of the geosynthetics or the anchorage 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 9

  10. Dimensioning Introduction Experiment set-up Dimensioning Measurement program Outlook • Erosion of top soil and vegetation • Gliding of the topsoil on the geosynthetics • Gliding of the geosynthetics on the ground • Erosion beneath the geosynthetics • Failure of the geosynthetics or the anchorage 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 10

  11. Dimensioning Introduction Experiment set-up Dimensioning Measurement program Outlook • Wire heads up to 1.0 m causes shear stresses of approx. 900 N/m² • Investigation of heads up to 0.3 m • Loads have to be transferred by pegs 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 11

  12. Dimensioning Introduction Experiment set-up Dimensioning Measurement program Outlook • Minimization of load-displacement • Search for an optimal pitch • Reduction of effort while increase in efficiency • Reduction of the number of parts lowers the cost of deployment and maintenance 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 12

  13. Dimensioning Introduction Experiment set-up Dimensioning Measurement program Outlook • Finite-Element-Method (FEM) simulation of the deformation • ABAQUS 2-D-model • FEM-simulation of the estimated forces during the overflow • ABAQUS 3-D-model • Adaption of the peg pitch • Adaption of the top anchorage 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 13

  14. Dimensioning Introduction Experiment set-up Dimensioning Measurement program Outlook • Starting conditions • Peg dimension of 0.5 m length and Ø=12 mm • Spillway slab of 20 m to 12 m • Starting pitch 1 x 1 m • Non-vegetated (worst case) revetment 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 14

  15. Measurement program Introduction Experiment set-up Dimensioning Measurement program Outlook • Pressure sensor • Indikation of turbulences • Area scanner • Deformation of the geosynthetics • Ground radar • Erosion beneath the geosynthetics • Change in density of / rearrangement in the subsoil • If applicable • Resistance strain gauges on the geogrid • Turbidity sensor • Indication of erosion 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 15

  16. Outlook Introduction Experiment set-up Dimensioning Measurement program Outlook • Short-term experiments in 2008 • Certification of the effectivity of the geosynthetic combination (stability in a worst case scenario) • Optimizing the pitch for the pegs • Long-term experiment (winter 2008 / spring 2009) • Laboratory test of the shear resistance • Overflow on the vegetated testing area • Experiments with alternative erosion protection measures • Aim • Consideration of our results in the guidance for the remediation of the river dikes in Hesse, Germany 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 16

  17. End Introduction Experiment set-up Dimensioning Measurement program Outlook Thank you for your attention 08.10.2014 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 17