100 likes | 267 Vues
The MOCHA Project aims for transparent access to distributed data with a scalable middleware architecture. Its 3-tier Java-based system allows plug-n-play code deployment, on-site data processing, and reduction of data movement over the internet. Users benefit from automatic deployment of code, access to distributed data, and efficient query processing. The platform offers easy customization, extensibility, and integration of user-defined methods. MOCHA stands out with its platform-independent solution that minimizes data movement and enhances data access efficiency. It supports web-based thin clients, unlimited extensibility, and seamless integration with existing systems.
E N D
The MOCHA Project • Goals: • Transparent access to distributed data sources • Scaleable middleware architecture • Automatic deployment of code (Plug-N-Play) • On-site processing and “filtering” of data • Reduction of data movement over Internet • Built upon Java and XML standards
MOCHA 3 -Tier Architecture • Clients • Web-based (applets) • Query Processing Coordinator • Metadata for schema translation • Java Code Repository (types and methods) • Data Access Provider • Data translation • Data filtering • Data Server • Repository of metadata and data products
DAP DAP Client Q Q Q Q Q Q Q Q Q Plug-N-Play Code Deployment Code Repository Catalog Informix Oracle QPC Maryland Texas Virginia Internet Select location, Composite(image) From Rasters Where week BETWEEN t1 and t2 Group By location Virginia
100MB 200MB tuples tuples DAP DAP Client 350KB 200KB 150KB 150KB 150KB 200KB 350KB 200KB results results results results results results results results Plug-N-Play Code Deployment Code Repository Catalog Informix Oracle QPC Maryland Texas Virginia Internet Select location, Composite(image) From Rasters Where week BETWEEN t1 and t2 Group By location Virginia
MOCHA Features • Uniform access to distributed data • Integrated schema for multiple sites • Platform independent solution • Java and XML • Fully extensible • User-defined types and methods (MOCHLETS) • Access data in their existing formats • On-site retrieval and processing of live data
MOCHA Features • Automatic code deployment (Plug-N-Play) • Easy to administer • Easy to extend and upgrade • “Light-weight” data access layer • Easy to customize, install, and enhance • XML-based metadata for • System catalog • Data products • Efficient Query Processing • Minimize data movement over Internet
Advantages Over Previous Solutions • Web-based Thin Clients • Single point of access to the system: QPC • Easy and inexpensive to configure • Users need not be aware of low-level details (data sites, data servers, schemas, …) • Unlimited Extensibility • SQL and XML query services (no inefficient scripting) • Customizable types and user-defined methods (MOCHLETS) • Scaleable • Easy to add new services, sites, code, and clients
Project Status • Operational System • Multi-threaded QPC with catalog and code repository • Relational and XML DAPs • Data Sites • 3 servers with relational DAPs • 1 high-performance SP2-HPSS data repository • Demonstrated at ACM SIGMOD 2000 Conf. • Access TM, AVHRR and GIS Data Products • Web demo: http://mocha.umiacs.umd.edu • Future work • Deployment on ESIP Federation