trory
Uploaded by
15 SLIDES
290 VUES
150LIKES

OOI Cyberinfrastructure and Semantics

DESCRIPTION

This document outlines the design and architecture of the Ocean Observing Initiative (OOI) Cyberinfrastructure, presented at a workshop on November 18, 2008, by the UCSD/Calit2 team. It details the project's current status, the development process, and the integration of various scientific investigation scenarios. Additionally, it discusses dynamic data distribution, metadata modeling, public access to datasets, and the importance of semantic mediation using ontologies. The OOI aims to enhance ocean research, education, and foster public participation in scientific activities.

1 / 15

Télécharger la présentation

OOI Cyberinfrastructure and Semantics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OOI Cyberinfrastructure and Semantics OOI CI Architecture & Design TeamUCSD/Calit2 Ocean Observing Systems Semantic InteroperabilityWorkshop, November 18 2008

  2. Outline • OOI Overview • Cyberinfrastructure Project Plan • Scientific Investigation Scenario • Data Collection Workflow • Data Management Services • Technologies

  3. OOI Overview

  4. Cyberinfrastructure Project Plan • Current status: Past FDR; prototyping in pilot period; construction planned for 7/2010 • Spiral development process, five releases, six subsystems • OOI observatories: Coastal, Global, Regional • External observatories: IOOS, Neptune CA, VENUS, …

  5. Science Activity Model Scientific Investigation

  6. Data Processing and Availability

  7. Subsystem • Dynamic Data and Information Distribution • Common data and metadata model • Stream and message based data distribution network (publish/subscribe) • Efficient dataset wire transport • Data/information catalog and repository • Persistent archive • Data Integration • Real-time QA/QC’ed data from OOI observatories • External observatory and dataset integration

  8. Subsystem • Data and Information Access • Public data access in various syntactical formats • Flexible search and navigation • Faceted queries using ontologies • Transformation and Mediation • Syntactical transformation (in and out of the DDN) • Aggregation of datasets • Attribution and association • Semantic mediation using ontologies/vocabularies • Manage provenance, lineage and policy

  9. Transformation Service Data Model • Relationship between the constituents of the Transformation Service and the Information Container Model

  10. Technology Mapping

  11. Summary • NSF’s OOI CI Goals • Build the next generation cyber-infrastructure for ocean research, education and public participation • Timeline • Prototyping ongoing • OOI construction planned for 7/2010 to 6/2015 • Semantics • Ontology based query and mediation • Success depends on the integration of MMI vocabularies and semantic framework, the VSTO semantic framework and faceted search

  12. Thanks!

  13. Information Container Model • Encapsulates all kinds of information resources, such as: scientific data, user identities, process definitions, virtual machine images, etc. • Multiple levels of meta-data • Separation of concerns between Information services

  14. Ingestion • Provides basic mechanisms for identifying the data streams and formats, parsing the content and identifying the associated meta-data, adding version information, and registering the streams with a ISN Repository

  15. Ingestion Service Data Model • Relationship between the constituents of the Ingestion Service and the Information Container Model

More Related