An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Independent Laboratory TestingPART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer

  2. M+ESD • 16 Engineers and Scientists, - 2 engineering technicians • Responsible for mechanical aspects of mining equipment as it relates to the safety and health of miners • Approval programs include dust collectors evaluated under part 33 and diesel machines evaluated under part 36

  3. M+ESD • Our laboratory and field test functions include: • Dust collector field test followed by laboratory analysis of dust samples • Laboratory and field tests of diesel machines and components • Engines – emissions – under part 7 • Power Package – surface temperature, explosion, and safety control tests under Parts 7 and 36 • Diesel powered machine field tests under part 36

  4. M+ESD • Test procedures are documented in 30CFR and standard operating procedures

  5. M+ESD • An independent lab considering conducting testing for the MSHA approval of a mining product must produce a product equal or better than our present capability to maintain the integrity of the MSHA approval • Test equipment must be equal or better than MSHA including up to date calibration– equipment specifications found in 30CFR, MSHA website, or call us

  6. M+ESD • Data collecting, record keeping, report writing required • Quality Assurance

  7. M+ESD • Any ? • Call the M+ESD and speak to us anytime • 304 547 2042, John Faini