1 / 14

X-ray Calorimeter

X-ray Calorimeter. If the facts don't fit the theory, change the facts. Albert Einstein. Mechanical Sara Riall David Peters 2 – 6 April, 2012. X-RAY CALORIMETER. Falcon 9 Fit Check. Mass Properties (20120405 a.m.). C.G. – C.P. Offset (20120402 p.m.). Bus Dimensions.

tuyet
Télécharger la présentation

X-ray Calorimeter

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. X-ray Calorimeter If the facts don't fit the theory, change the facts. Albert Einstein Mechanical Sara Riall David Peters 2 – 6 April, 2012

  2. X-RAY CALORIMETER

  3. Falcon 9 Fit Check

  4. Mass Properties (20120405 a.m.)

  5. C.G. – C.P. Offset (20120402 p.m.)

  6. Bus Dimensions

  7. Metering Structure Mass/Fabrication Mass in kilograms (kg), dimensions in centimeters (cm)

  8. Metering Structure Mass/Fabrication(cont’d) Mass in kilograms (kg), dimensions in centimeters (cm) • Isogrid • Material thickness as shown • 48 webs (24 CW, 24 CCW) • Webs rotate 180° from top to bottom SKIN • Honeycomb panels • Panel thickness is 2.54cm [1.0 in] • Skin thickness varies as shown • Core 3.4-1/4-15-(5056)T • (0.0545 g/cm³ [3.4 lbs/ft³]) CORE SKIN

  9. Metering Structure Mass/Fabrication (cont’d) Mass in kilograms (kg), dimensions in centimeters (cm)

  10. Metering Structure Mass/Fabrication (cont’d) Mass in kilograms (kg), dimensions in centimeters (cm)

  11. Mass Rack-up Mass in kilograms (kg), dimensions in centimeters (cm)

  12. Mass Comparison

  13. Issues / Potential Risks / Future work • Verify that the CTE meets the mission requirements for the structure. • Determine if structure could be light-weighted further to improve on mass margin • Verify that the structure will support launch loads • Verify that the cp/cg offset can be managed in the x direction at 25 degree offset.

  14. Acronym list • CTE- coefficient of thermal expansion • FMA- flight mirror assembly • SMAD- space mission analysis and design • S/A –solar array • Cp-center of pressure • Cg- center of gravity • s/c –space craft • MS- mechanical structure • CCW- counterclockwise

More Related