An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FAIR GmbH and FAIR ProjectHistory, Status and Outlook Simone Richter Administrative Managing Director HICforFAIR

  2. Content and Agenda Simone Richter • FAIR GmbH • Some information and facts on the FAIR GmbH History • Goals and Activities – Status and Outlook • FAIR Project 2

  3. FAIR GmbH – Creating an organisation for the FAIR Project • 199x - first ideas for GSI Upgrades • 2001 - The scientific community prepared the CDR • 2004 - The international Committees ISC, AFI, STI started the steering and manageing of the adminstrative, financial, and scientific activities • 2005 – The two company model for the FAIR Project has been signed • 2006 – The FAIR Joint Core Team and the FAIR Technical Devision have been founded to run the operational work • 2007 – FAIR Start Event • 2010, 4th October - Foundation of the FAIR GmbH Simone Richter 3

  4. Signatory Ceremony and Foundation of FAIR GmbH Signatory Ceremony at Wiesbaden 4th October 2010 The convention was signed by Finland France India Poland Romania Russia Slovenia Sweden Germany Foundation act of FAIR GmbH The Foundation papers for the FAIR GmbH were signed by Horst Stöcker Hartmut Eickhoff at 2010, 4th of October Simone Richter

  5. Organisational Chart (1/2) Council Scientific Council AFC Machine Advisory Committee In-Kind Review Board Managing Directors Technical Departement Scientific Departement Site & Buildings Departement Administration Departement Simone Richter

  6. Organisational Chart (2/2) Council • Weekly management • board meetings Managing Directors B. Sharkov (Chairman), S. Richter Director‘s Office Legal Advisor 3rd Party Funding Officer Council Matters Office S. Richter B. Sharkov Technical Director D. Krämer Research Director acting B. Sharkov (G. Rosner) Director Site&Buildings acting D. Krämer (L. Miralles) Administration S. Richter Controlling and Ressource Planning Project Office Acc-Liaison Finances Technical Follow-up In-kindcoordination Simone Richter

  7. Shareholders and Contributions Spain is expected to join soon Negotiations are ongoing with China and UK for contributions to experiments The total Project Cost on Basis of 2005 prices is 1027 M€ Simone Richter

  8. FAIR GmbH Status • Official entry into the Commercial Register 10 November 2010 (HRB 89372) • 5 Registered Shareholders: GSI, Rosatom, BOSE Institute, Swedish Research Council, NASR • Approval of Budget 2011 is reached The budget of 2011 is agreed to be 23,7 MEuro • The Business Management Contract, defining the close Cooperation between FAIR and GSI, was signed in January 2011 Simone Richter

  9. FAIR – Facility for Antiproton and Ion Research Simone Richter

  10. Modularized Start Version Development of Project Staging Simone Richter

  11. Module 0: SIS100 and connection to existing GSI accel. Simone Richter

  12. Module 0: SIS100 and connection to existing GSI accel. Module 1: Experimental areas Simone Richter

  13. Module 0: SIS100 and connection to existing GSI accel. Module 1: Experimental areas Module 2: Super-FRS Simone Richter

  14. Module 0: SIS100 and connection to existing GSI accel. Module 1: Experimental areas Module 2: Super-FRS Module 3: High-energy antiprotons (p-linac, pbar-target, CR, HESR) Simone Richter

  15. Module 0: SIS100 and connection to existing GSI accel. Module 4: low energy RIB and low energy antiprotons Module 1: Experimental areas Module 2: Super-FRS Module 3: High-energy antiprotons (p-linac, pbar-target, CR, HESR) Simone Richter

  16. Module 0: SIS100 and connection to existing GSI accel. Module 4: low energy RIB and low energy antiprotons Module 1: Experimental areas Module 5: RESR storage ring Module 2: Super-FRS Module 3: High-energy antiprotons (p-linac, pbar-target, CR, HESR) Simone Richter

  17. CBM/HADES APPA PANDA NuSTAR Science with the Modularized Start Version Simone Richter

  18. Site and Buildings Major Activities in the next twelve month • 2nd Planning Phase • Kick Off Sept. 22nd 2010 • Regular meetings with Users • finalize details of buildings • include details of media transport in the buildings • Target: Application for Building-Permit • May 2011 • Target: Application to Radiation Safety Authority • to errect and operate the facility • Site preparation start in Winter 2011 Simone Richter

  19. FAIR ACC Organisation Simone Richter

  20. Research Board of FAIR Collaborations established • interface between FAIR and all scientist communities • 2 respresentatives for each pillar of APPA, CBM, NuSTAR, PANDA Major activities for the next twelve month Nominations by the collaborations started for • Technical Coordinators • Resource Coordinators job descriptions close to final; approval by new Research Director needed Simone Richter

  21. Milestones and Schedule • Experiment MoUs ready autumn 2011 • Detector TDRs expected spring 2012 • In-Kind Contributions to the accelerator defined autumn 2011 • Site preparation winter 2011/2012 • Start of ground breaking work Q2 2012 • Ready to move in for buildings and tunnels – 2016/2017 • Begin of accelerator commissioning 2017/2018 Simone Richter