TMA Uniform Business Office. EWSR Enterprise-Wide Scheduling and Registration. Background of EWS-R. Original plan was a COTS Solution Mobiam contract had a one yr re-look Product only met 40% of need Re-build the other 60%. EWS-R Project Overview/Scope. EWS-R Phase (1)

urban
Télécharger la présentation

TMA Uniform Business Office

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TMA UniformBusiness Office EWSR Enterprise-Wide Scheduling and Registration Attachment #10 - Agenda Item 5.8

  2. Background of EWS-R • Original plan was a COTS Solution • Mobiam contract had a one yr re-look • Product only met 40% of need • Re-build the other 60% Attachment #10 - Agenda Item 5.8

  3. EWS-R Project Overview/Scope • EWS-R Phase (1) • Convert CHCS Baseline to Cache’ baseline • Application Code • Database • Utilities • Interfaces • Regression Test • EWS-R Phase (2) • Build out additional capabilities to meet EWS-R requirements • Block 1 Functionality: Develop GUI presentation to expose Registration and Medical Appointing • Block 2 Functionality: Develop GUI for Admission/Discharge/Transfer (ADT)- Bed Mgt and Medical Records Tracking, and Integrate OR Scheduling and Dental Appointing Solutions • Implement Central and Distributed Architecture • Expose Common Services • Central Registration • “Gold” Files and Tables • Messaging Attachment #10 - Agenda Item 5.8

  4. Phase I Attachment #10 - Agenda Item 5.8 Modified: 05 Oct 2005

  5. Phase IIa & IIb Attachment #10 - Agenda Item 5.8

  6. More Facts • Phase I – • Movement of the current database, user applications, utilities and system interfaces to the Cache’ Architecture • Includes SIT/OHI from CHCS • Change is intended to be invisible to the user • Deployment April ’06 through July ’06 • SIT/OHI just a step ahead • If EWS-R Phase 1 proceeds ahead of SIT/OHI then there will need to be a second migration effort Attachment #10 - Agenda Item 5.8

  7. EWS-R Assessment Issues/Risks • Risks: • Complexity of EWS-R • Convergence activities with CITPO: • Engineering Coordination • Configuration Management • CHCS II • DT&E • Near-Term or Significant Issue: … & CHCS changes that fall within the transition window and new non-CHCS initiatives are being monitored for potential convergence to identify where implementation may overlap with the Cache’ migration. Attachment #10 - Agenda Item 5.8

  8. Next Step Review of SIT/OHI Requirements analysis and Functional design Week of 28 Nov ‘06 Attachment #10 - Agenda Item 5.8

  9. EWSR/ Looking into the Future UBO goals : Chargemaster E- Billing: • Participate in IPR’s, meetings etc • Anticipate, Question, Stay in loop • Modifications can be made to the EWS-R at any time should the chargemaster product selected require changes Attachment #10 - Agenda Item 5.8