1 / 8

Log 203 Reliability and Maintainability

Log 203 Reliability and Maintainability. Presented by Course Manager, Dick Di Lorenzo, richard.dilorenzo@dau.mil (937) 255-4915;x3368 DAUMW 29 Aug 02 Acq Log FIPT. Log 203 R&M Outline. Course basics TLOs Issues. Log 203 R&M course basics. Acq Log Level II requirement

Télécharger la présentation

Log 203 Reliability and Maintainability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Log 203 Reliability and Maintainability Presented by Course Manager, Dick Di Lorenzo,richard.dilorenzo@dau.mil (937) 255-4915;x3368 DAUMW29 Aug 02 Acq Log FIPT

  2. Log 203 R&M Outline • Course basics • TLOs • Issues

  3. Log 203 R&M course basics • Acq Log Level II requirement • Web-based only (since May 2001) • 7 modules (1 per TLO) • An exam after each module and a comprehensive end-of-course exam • Approximately 17 hours of student time (formerly a 3-day classroom course) • 884 graduates in last 12 months • 88 students currently enrolled

  4. Log 203 R&M TLOs • TLO 1: Given the position of acquisition logistician in a program office, explain how the product’s R&M will affect the measures of logistics support. • TLO 2: Given the position of acquisition logistician in a program office, explain how the product’s R&M will affect the measures of combat capability • TLO 3: Given a MNS, develop operational and contractual R&M requirements • TLO 4: While reviewing a company’s proposal, consider all the activities that contractors may select in designing for reliability.

  5. Log 203 R&M TLOs cont’d • TLO 5: While reviewing a company’s proposal, consider all the activities that contractors may select in systems design for a more maintainable product. • TLO 6: Given an acquisition program, explain two types of reliability testing aimed at reducing the risk of failures and high support costs. • TLO 7: Given the position of acquisition logistician in a program office, explain how to keep manufacturing from adversely impacting the product’s reliability.

  6. Log 203 Issues • To be removed as Level II certification requirement. • Recommend course be retained as continuous learning module. • Needs update.

  7. Log 203 Summary • Course basics • TLOs • Issues

More Related