1 / 12

CENNI SUL SISTEMA ERTMS: finalità e tempi

CENNI SUL SISTEMA ERTMS: finalità e tempi. ETCS Roma, 23.02.99. ERTMS. ETCS. ERTMS/ETCS. Organismi di Standardizzazione. EU. UIC. ETCS Roma, 23.02.99. ERTMS/ETCS Application Level 1. ERTMS/ETCS Application Level 1 with infill. ERTMS/ETCS Application Level 2.

vachel
Télécharger la présentation

CENNI SUL SISTEMA ERTMS: finalità e tempi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CENNI SUL SISTEMA ERTMS:finalità e tempi ETCS Roma, 23.02.99

  2. ERTMS ETCS ERTMS/ETCS Organismi di Standardizzazione EU UIC ETCS Roma, 23.02.99

  3. ERTMS/ETCS Application Level 1 • ERTMS/ETCS Application Level 1 with infill • ERTMS/ETCS Application Level 2 • ERTMS/ETCS Application Level 3 Caratteristiche di ERTMS/ETCS Livello 1 Livello 1 “con infill” Livello 2 Livello 3 ETCS Roma, 23.02.99

  4. Integrazione con i segnali ottici, blocco fisso ETCS - vuoto - - vuoto - LIV 1 Balise ERTMS/ETCS - livello 1 - ETCS Roma, 23.02.99

  5. Integrazione con i segnali ottici, blocco fisso con "Infill" ETCS - vuoto - - vuoto - LIV 1 Balise Loop ERTMS/ETCS - livello 1 - ETCS Roma, 23.02.99

  6. blocco fisso ETCS - vuoto - LIV 2/3 LIV 1 Balise ERTMS/ETCS - livello 2 - ETCS Roma, 23.02.99

  7. Blocco mobile ETCS LIV 3 Integrità LIV 2/3 LIV 1 Balise ERTMS/ETCS - livello 3 - Interlocking e Radio Block Centre ETCS Roma, 23.02.99

  8. ETCS a bordo STM Sstema Non-ETCS ERTMS/ ETCS Applicazione - STM Operazioni - STM ETCS Roma, 23.02.99

  9. STM - con Dati aggiuntivi ETCS ETCS a bordo STM Sistemi Non-ETCS ETCS Balises ERTMS/ETCS Applicazione - STM ETCS Roma, 23.02.99

  10. Radio sotto-sistema EURORADIO (interfaccia con il radio-treno) • Balise sotto-sistema EUROBALISE • Loop sotto-sistema EUROLOOP ERTMS/ETCS - Sistemi di Trasmissione - ETCS Roma, 23.02.99

  11. EU Stati Membri EU EU DG VII DG VII EUROSIG EUROSIG Industria Europea ERTMS - una struttura di collaborazione ERTMS Users Group DB FS SNCF RAILTRACK NS RENFE Alstom ADtranz ACEC Alcatel SEL Ansaldo Sasib Railway CSEE Siemens Westinghouse EEIG Ferrovie Consorzio MORANE ETCS Roma, 23.02.99

  12. Master Plan - Project Life Cycle RICERCA Ferrovie Mission Statement User Requirements Technical Requirements Industria TEN System Development Certification Authorities Functional Prototyping Field Testing System Certification European Standards ERTMS Master Plan ETCS Roma, 23.02.99

More Related