SUBSURFACE HEATING AND COOLING

SUBSURFACE HEATING AND COOLING. CHILLED CEILING (DRY WALL/CEILING). Bau Automotive Industrie. www.rehau.de. SYSTEM CHILLED CEILING. MOUNTING. Mounting of the main pipework Mounting under construction Mounting of the active ceiling elements

vachel
Télécharger la présentation

SUBSURFACE HEATING AND COOLING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUBSURFACE HEATING AND COOLING CHILLED CEILING (DRY WALL/CEILING) Bau Automotive Industrie www.rehau.de

  2. SYSTEM CHILLED CEILING MOUNTING • Mounting of the main pipework • Mounting under construction • Mounting of the active ceiling elements • Connecting of the ceiling elements to the pipework • Flushing and pressure test • Complete insulation • Mounting of the non active areas • Filling of the joints • Painting

  3. SYSTEM CHILLED CEILING CONSTRUCTION SIDE

  4. SYSTEM CHILLED CEILING MOUNTING PIPEWORK

  5. SYSTEM CHILLED CEILING MOUNTING PIPEWORK

  6. SYSTEM CHILLED CEILING MOUNTING PIPEWORK

  7. SYSTEM CHILLED CEILING MOUNTING PIPEWORK

  8. SYSTEM CHILLED CEILING MOUNTING INSULATION

  9. SYSTEM CHILLED CEILING INSULATION

  10. SYSTEM CHILLED CEILING INSULATION

  11. SYSTEM CHILLED CEILING MOUNTING OUTER PROFILE

  12. SYSTEM CHILLED CEILING MOUNTING SUPPORTS (CONCRETE SLAB)

  13. SYSTEM CHILLED CEILING MOUNTED UNDER CONSTRUCTION ON CONCRETE SLAB

  14. SYSTEM CHILLED CEILING MOUNTING SUPPORTS (ON WOOD)

  15. SYSTEM CHILLED CEILING MOUNTED UNDER CONSTRUCTION ON WOOD

  16. SYSTEM CHILLED CEILING DELIVERY CHILLED CEILING

  17. SYSTEM CHILLED CEILING DELIVERED CHILLED CEILING

  18. SYSTEM CHILLED CEILING MOUNTING OF CHILLED CEILING – PLATE LIFTER

  19. SYSTEM CHILLED CEILING MOUNTING OF CHILLED CEILING – BY HAND

  20. SYSTEM CHILLED CEILING INSTALLED CEILING (ACTIVE AREA)

  21. SYSTEM CHILLED CEILING INSTALLATION ON REARSIDE GYPSUM BOARD STRIPE

  22. SYSTEM CHILLED CEILING MOUNTING ACTIVE/ NON ACTIVE AREAS

  23. SYSTEM CHILLED CEILING MAKING OF JOINTS - STEPS • Chamfering of the cross joints • 1. Filling with filling material • Inserting of the reinforcement stripes • 2. Filling with filling material • If necessary, final filling with „finish“

  24. SYSTEM CHILLED CEILING MAKING OF JOINTS HRAK-Edge In order to avoid cracks it is necessary to use paper reinforcement stripes. The stripes have to be weted prior to use. 1. Filling Reinforcement stripe 2. Filling If necesary finish

  25. SYSTEM CHILLED CEILING WETING OF JOINTS

  26. SYSTEM CHILLED CEILING 1. FILLING

  27. SYSTEM CHILLED CEILING VIEW AFTER FIRST FILLING

  28. SYSTEM CHILLED CEILING INSERTING REINFORCEMENT STRIPE

  29. SYSTEM CHILLED CEILING SANDPAPERING

  30. SYSTEM CHILLED CEILING READY SURFACE