1 / 20

Enabling Sub-Wavelength Network Architectures: Project Overview and Management Insights

The MAINS project focuses on developing sub-wavelength network architectures to support future networks. Funded under the STREP scheme, the project aims to achieve techno-economic analysis and standardization of these converged infrastructures. Objectives for the second year include designing OAM architectures, developing XML interfaces, implementing multidomain control planes, and conducting field trials to demonstrate virtualized services. Key results indicate significant cost savings, improved resilience, and the development of new standards and monitoring mechanisms to enhance network efficiency.

valiant
Télécharger la présentation

Enabling Sub-Wavelength Network Architectures: Project Overview and Management Insights

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAINS (Metro Architectures enablINgSubwavelegths)Overall project overview and management aspects Type of funding scheme: STREP Work program topics addressed: Objective ICT-2009.1.1: The Network of the Future c) Converged infrastructures in support of Future Networks

  2. Index • Project structure and objectives for the second year • Main results during the reporting period • Management aspects over the secondyear.

  3. Project structureand objectivesforsecondyear

  4. General work organization

  5. GANTT chart

  6. MAIN Objectivesduringsecondyear • WP1 • Technoeconomic analysis • Standardization activities • WP2 • Design of OAM architecture for sub-wavelength networks • Design of XML interfaces for sub-wavelength networks • WP3 • Implementation of Multidomaincontrol plane for sub-wavelength optical networks • Implementation of Network-Service interface and MAINS Transport Protocol • WP4 • TSON and OPST implementation and interconnection • Field trial of OPST ring demonstrating pc virtualisationservices • WP5 • Dissemination • Liaisons with other projects

  7. Mainresultsduringthereportingperiod

  8. WP1-Technoeconomic analysis and standardization • Up to 42% CapEx savings on transit router cost can be achieved by offloading up to 85% of the IP traffic to a subwavelength network [FUNEMS2012] [D12] • MAISN proposed architecture for VPC service is 20% of the cost of the current network architecture approach [NOC2011] [D12] • Resilience to data centre location and changing traffic patterns enable the sub-wavelength packet optical solution to achieve cost savings of 150% when compared to the IPoDWDM approach. [ONDM2012_1] • The flexibility of a sub-wavelength packet switched network reduces the risks stemming from forecasting uncertainty by 500% for 99.8% of the 1 million uniformly distributed configurations compared [ONDM2012_2] • Internet draft “Framework for GMPLS and path computation support of sub-wavelength switching optical networks” • SG15 ITU-T contribution 1527 Rev. 3 “Standardization of optical switching (photonic sub-lambda switching)” • NOC2011, Newcastle-upon-Tyne (UK). “Cost Reduction of 80% in Next-Generation Virtual Personal Computer Service Economics Using a Sub-Wavelength Metro Network” Cs. Kiss Kalló et al . • FUNMS 2012, Berlin (GER). “Benefits of Optical Packet Switching for Router By-pass in Metro Networks”. Cs. Kiss Kalló et al • ONDM 2012, Colchester (UK). “Cost-Effective Sub-wavelength Solution for Data Centre Location in Scaled Next-Generation Networks”. Cs. Kiss Kalló et al ; “Economic Modelling of Uncertain Next Generation Network Evolution”. Cs.Kiss Kalló, et al

  9. WP2- Common OAM Architecture • A new E2E architecture enabling MPLS and subwavelength OAM interworking. • OAM architecture within a single OPST and TSON subwalength domains • Novel performance monitoring mechanism enabling scalable OAM flows in E2E network architectures. FUNEMS 2012 “E2E-OAM in convergent Sub-wavelength-MPLS environments”. J.P Fernandez-Palacios et al

  10. WP2- XML interfaces • Design of XML interfaces for OPST and TSON and the associated API (Application Program Interface) definitions to be used in the Network Control Plane to deliver liquid bandwidth or bandwidth on demand, and similar highly responsive services.

  11. WP3- NSI and GMPLS implementation • Both MAINS NSI and control plane architectures designed during the first year were implemented and experimentally evaluated during the reporting period

  12. WP4- Experimental demonstrations • MAINS experimental activities were carried out over a lab as well as over a field trial in Cyprus which demonstrated a virtual PC application over the MAINS architecture

  13. Management aspects

  14. Dissemination in thereportingperiod • Conferences (12 papers ): • [OFC1] Joan Triay, Georgios S. Zervas, Cristina Cervello-Pastor, Dimitra Simeonidou, “GMPLS/PCE/OBST Architectures for Guaranteed Sub-Wavelength Mesh Metro Network Services“, Optical Fiber Communication Conference (OFC), Los Angeles, USA, March 2011. • [ECOC1]ShavanAskar, Georgios Zervas, David K. Hunter, Dimitra Simeonidou, “A Novel Ingress Node Design for video streaming over Optical Burst Switching Networks“, 37th European Conference on Optical Communication (ECOC 2011), Tu.6.K.6, Geneva, Switzerland, Sept. 2011. • [ECOC2] Georgios S. Zervas, Joan Triday, Norberto Amaya, Yixuan Quin, Cristina Cervello-Pastor, Dimitra Simeonidou, “Time Shared Optical Network (TSON): A Novel Metro Architecture for Flexible Multi-Granular Services“, 37th European Conference on Optical Communication • [ECOC3] Jaime Fullaondo, Javier Aracil, Juan Fernandez-Palacios “Optical Friendly HiSpeed File Transfer Protocol For Enabling Next Generation Nomadic Virtual PC Services” at ECOC 2011 conference. Geneva September 2011. • [ECOC4] Juan Pedro Fernández-Palacios (TID), “Nomadic Virtual PC: A user Case for Network and Distributed Cloud Interworking“. Presented in ECOC 2012, Geneva, Switerland. • [FUNEMS2012_01] Kiss Kalló, Victor Lopez, John Dunne, Mark Basham, J.P. Fernández-Palacios, “Benefits of Optical Packet Switching for Router By-pass in Metro Networks“, Future Networks and Mobile Summit, Berlin, Germany, July 2012. • [FUNEMS2012_02] Georgios S. Zervas, Bijan Rahimzadeh Rofee, Yan Yan, Dimitra Simeonidou, Giacomo Bernini, Gino Carrozzo, Nicola Ciulli, “Control and Transport of Time Shared Optical Networks (TSON) in Metro Areas“, accepted for publication in Future Network & Mobile Summit 2012, Berlin, Germany, July 2012. • [ONDM1] Kiss Kalló, J, Shields, Raymond Carley, Víctor López, J.P. Fernández-Palacios, “Cost-Effective Sub-wavelength Solution for Data Centre Location in Scaled Next-Generation Networks“, submitted to Optical Network Design and Modeling, ONDM 2012, Colchester, UK. • [ONDM2] Kiss Kalló, Raymond Carley, Conor O’Malley, Victor Lopez, J. P. Fernández-Palacios, “Economic Modelling of Uncertain Next-Generation Network Evolution”, submitted to Optical Network Design and Modeling, ONDM 2012, Colchester, UK. • [ONDM3] Yixuan Qin, Yan Yan, Georgios S. Zervas, Bijan R. Rofoee, Norberto Amaya, Dimitra Simeonidou, “Software/Hardware defined Network (SHINE): A Novel Adaptive Optical Network Framework for Future Internet”, accepted for publication in Optical Network Design and Modeling, ONDM 2012, Colchester, UK • [ICT1] Michael Georgiades, Jaime Fullaondo, George Zervas, Dimitra Simeonidou, Juan Pedro Fernández, Mark Basham, “A Suite of Optical Network Testbeds for a Realistic Evaluation of MAINS’ Sub-Wavelength Switched Metro Network”, Telecomunications (ICT), 2011, 18th International Conference on, pp. 238-243, Agia Napa, Cyprus, May 2011. • [NOC1] Cs. Kiss Kalló, M. Basham, J. Dunne, J. P. Fernández-Palacios, “Cost Reduction of 80% in Next-Generation Virtual Personal Computer Service Economics Using a Sub-Wavelength Metro Network“, 16th European Conference on Network and Optical Communications (NOC 2011), New Castle Upon Tyne, UK.

  15. Dissemination in thereportingperiod • Journals (3 papers): • [OPEX1] Georgios S. Zervas, Joan Triay, Norberto Amaya, Yixuan Quin, Cristina Cervelló-Pastor and Dimitra Simeonidou, “Time Shared Optical Network (TSON): A Novel Metro Architecture for Flexible Multi-Granular Services“. Optics Express Vol. 19, Iss. 26, pp. B509-B514, 2011. • [OPEX2] S. Askar, G. Zervas, D.K. Hunter, “A novel ingress node design for video streaming over optical burst switching networks“, Optics Express, Vol. 19, Iss. 26, pp. B191-B196, 2011. • [IEEE-TON] Joan Triay, Georgios S. Zervas, Cristina Cervello-Pastor, Dimitra Simeonidou, “Offline Routing, Wavelength and Time-Slot Assignment in Time-Shared Optical Network: A Flexibility and Complexity Study”, submitted to IEEE Transactions on Networking • 2 contributions to standards: • [ITU] SG15 ITU-T contribution 1527 R3 “Standardization of optical switching (photonic sub-lambda switching)”. • [GON] O. González de Dios, G. Bernini, G. Zervas, M. Basham, “Framework for GMPLS and path computation support of sub-wavelength switching optical networks“, draft-gonzalezdedios-subwavelength-framework-00.txt, March 7, 2011. • 4 Workshops organised by MAINS: • ONDM 2011 workshop about “Network Control Plane Evolution”. This workshop was done in collaboration with SRONGEST, GEYSERS and ETICS • ECOC 2011 Joint MAINS and GEYSERS ECOC workshop on Convergence of Optical Networks and Clouds. Geneva, 18 September, 2011 • FUNEMS2012. CAON workshop on “Optical networking standardization strategies”. Accepted workshop proposal. • ECOC 2012 CAON workshop on “Control Plane architectures for new optical switching technologies enabling flexibility in time, frequency and space domains”. Accepted workshop proposal • Other workshops: • NOC2012 Workshop on EU projects organised by FP7 ONE

  16. Resourcesconsumed Person-Month Status

  17. ContractAmmendment • A contact amendment was requested and approved in order to increase project duration in 3 months. • This time extension would enable : • to organize a workshop at ECOC • extend standardization activities within the project. • MAINS Description of Work (DoW) was updated according to the project extension.

  18. Concertationactivities • MAINS is actively participating in the CAON and Concertation meetings organised at programme level relating to the ICT Future Networks area. • Juan Fernández-Palacios is co-chair of the CAON (Convergent Access and Optical Networks) cluster where is coordination the standardization activities carried out within the cluster. • Furthermore, MAINS has also contributed to NEXT!WORK and CAON white papers providing its vision on metro network evolution.

  19. Liasonswithotherprojects • MAINS is actively collaborating with STRONGEST. Collaboration activities between STRONGEST and MAINS are focused on control plane interworking issues between GMPLS subwavelength domains implemented in MAINS and multilayer L2/WSON GMPLS domains implemented in STRONGEST. • MAINS have organized two workshops in collaboration with other projects during this period: • ONDM 2011 workshop about “Network Control Plane Evolution”. This workshop was done in collaboration with SRONGEST, GEYSERS and ETICS • Joint MAINS and GEYSERS ECOC workshop on Convergence of Optical Networks and Clouds. Geneva, 18 September, 2011 • MAINS is also organising two new workshops in 2012: • FUNEMS2012 workshop on “Optical Networking Standardization”. This workshop is done in collaboration with STRONGEST, GEYSERS, ETICS, CHRON, ACCORDANCE and OASE • ECOC 2012 workshop on “Control Plane architectures for new optical switching technologies enabling flexibility in time, frequency and space domains”. This workshop is done in collaboration with GEYSERS, AKARI, STRONGEST and OFELIA • MAINS will also participate in a workshop on EU projects in NOC2012 organized by project ONE

  20. Conclusions and nextsteps • Data and control planedesignand implementationactivitiesactivitiesare almostcompleted • Main activities to be carried out during the rest of the project can be summarised as follows: • Exploitation Plan Technoeconomicanalysis • Standardization • Implementation and Demonstration • MAINS implementation activities in 2012 will initially focus on creating and establishing a TSON network transport testbed. • TSON testbed will be interconnected with OPST ring (Intune NXT Beta nodes) to create the MAINS multi-technology multi-topology data plane testbed. • The testbed will be used to evaluate the end-to-end performance as well as validate different service scenarios (e.g. Virtual PC, UHD video). • Integration/interfacing of sub-wavelength enabled GMPLS control plane with the SLAE (Sub-Lambda Assignment Element) as well as the OPST and TSON nodes will be carried out. • The GMPLS control plane together with the SLAE will be used to provide dynamic control and provisioning of sub-wavelength services over the interconnected OPST-TSON transport network.