1 / 5

Summary of PS talks

Summary of PS talks. MD review meeting. Space Charge in the PS (R. Wasef ). P riority: integer scans with different tune spreads and working point. Comparison with emittance growth measurements done by R. Cappi in 1993 Increase the vertical tune above 0.25 to study the limitations.

vangie
Télécharger la présentation

Summary of PS talks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of PS talks MD review meeting

  2. Space Charge in the PS (R. Wasef) • Priority: integer scans with different tune spreads and working point. • Comparison with emittance growth measurements done by R. Cappi in 1993 • Increase the vertical tune above 0.25 to study the limitations. • Shortening the flat bottom ? • time scale of the transverse emittance blow up • PS already operates at the longitudinal limits 180 ns @ injection. • Additional space charge simulations are needed with improved PS lattice (available since yesterday). • Important to collect all necessary information before LS1 for simulations concerning: • Working point control by the PFWs and their influence on non-linearities (also for optics with large dispersion) • Correction of chromaticity • Slow effects for simulations.

  3. Longitudinal Plane (H. Damerau) • RF manipulations mainly driven by recquirement from High brightness LHC beams. • HW installation during LS1: • Finemet-based wide-band kicker cavity will be installed during LS1. • 1-turn feedback on all 10MHz cavities • profit of MD session in extended run to test the existing coupled bunch feedback with C10-11 as kicker. • More studies are then needed to characterize the parameters of the CBI (rise time etc..), excite the beam with feedback • Limitation in intensity in the PS due to CBI: 1.7-1.9e11 ppb • Cavity C11 could be used to damp the CBI, but it is then not available as spare.

  4. Transverse Plane of the PS • Transverse damper in commissioning, missing the TD in the vertical plane. • TD fixed frequency and fixed tune. • Move the working point away from the linear coupling and check the damper on LHC beam. • E-cloud: decision after 2013, waiting for further improvement of the simulations (can we live with the damper? coating ?) • Importance of the impedance model for prediction of instability intensity threshold (headtail…) and impedance localization (MD in parallel).

  5. PS-SPS longitudinal beam transfer studies (H. Timko) • Budget is available for extra 40 or 80 MHz cavities. But the impedance budget should be first understood. • 40MHz space cavity: they are optimistic that the 40MHz can be repaired and used for tests. The cause of failure is not yet understood. • Not necessary to open the vacuum. • Power supplies of the cavities are the weak point (voltage per gap) • Additional MD time needed at the beginning of 2013 if the 40MHz are back.

More Related