Integrating Demand Side Management Options

Integrating Demand Side Management Options. CPUC Workshop, March 7 th , 2008. Why integrate? (coordinate). Avoid lost opportunities Achieve market transformation Big Bold Programmatic Initiatives Access efficiencies in delivery systems Access additional EE (& other DSM energy savings).

varsha
Télécharger la présentation

Integrating Demand Side Management Options

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrating Demand Side Management Options CPUC Workshop, March 7th, 2008

  2. Why integrate? (coordinate) • Avoid lost opportunities • Achieve market transformation • Big Bold Programmatic Initiatives • Access efficiencies in delivery systems • Access additional EE (& other DSM energy savings)

  3. The intent is not to consolidate these programs under one administrator, but rather to find EE opportunities in these programs and, to the extent that energy savings can be directly attributable to utilities EE efforts, count those savings towards achievement of EE goals.(D. 07-10-032)

  4. What to integrate (coordinate) in Calif. EE Strategic Plan: • Full range of consumer demand side options • Present systems approach for all measures, programs & activities • Collaboratively engage market professionals and stakeholders- ! Identify process for this • www.californiaenergyefficiency.com

  5. What level of complexity? • Marketing, packaging & delivery (eg., outreach) • Operational improvements (eg., audits) • Optimization (eg., equipment recommendations) • RD&D • Market Transformation • New partnerships, players & approaches

  6. Why today? • Integration requirements (D-07-32-01) • Similar DR-EE program application filing schedules • Describe programs, activities, and funding requests for combined or coordinated DR/EE activities • Include specific proposals for implementing coordinated approaches to M & O • Leveraging funds for joint marketing of DR/EE/DSM • Consistent information in EE program • Include iDSM pilot projects (ALJ Ruling, D. 07-01-041)

  7. Draft Ca EE Strategic Plan- Vision“All demand-side management programs are coordinated and, as appropriate, integrated to increase the penetration of EE and to avoid lost opportunities” • Strategy 1: Establish integration procedures and determine the limits of integration through pilot projects • Goals: • Developing working definition... • Test delivery, create forum for ongoing exploration of issues • www.californiaenergyefficiency.com

  8. The Energy Action Plan (EAP) • Policy Goals: • Meet California’s energy growth needs while optimizing energy efficiency & conservation. • Decrease per capita energy use & reduce toxic & greenhouse gas emissions • “Loading Order” for Energy Resources: • Energy Efficiency • Demand Response • Renewable Generation • Cleanest Available Fossil Generation • EAP II adds climate change, RD&D, & transportation to the strategies

  9. Defining Success: • kW, kWh • Saving $ • Avoiding lost opportunities • Reducing GHGs • Water • Sustainability

  10. DSM Measurement Challenges

  11. Existing Demand Side Goals

  12. Is ‘Free-ridership’ an issue? • DR- is assessed on case by case basis • EE – existing methodology • For iDSM projects, clarification may be needed • e.g., DR programs that require (or strongly encourage) installation of EE technologies… • Changing incentive mechanism not under consideration • Design EM&V approach into pilots from start (process & quantitative)

  13. Process to advance iDSM ? • Is required to be identified in Strategic Plan • Will stretch through 2009… • Ensuring level playing field a priority • Broadening effort  RD&D, MT, new partnerships, players, approaches

  14. Today: • IOU presentation on foundational issues • discussion • Marketing, Education & Outreach • Positive Energy • LUNCH • Possible pilot projects - SMUD-ZNE homes • Operational integration – accts, audits, solicitations • General discussion

  15. Not today: • Detailed focus on procurement and DSM • Detailed focus on CSI & EE requirements • Formal guidance