ÖBB - Foundation. Catenary Wire. Contact Wire. Cantilever or Bracket Arm. Up to 75 m. Standard Types of Masts. Rectangular Concrete Mast Rectangular Steel Mast. Concrete Pad Foundation. of Rectangular Concrete Mast. Concrete Quantity: 1,2m³ to 12,8m³ Quiver for Mast Footing
E N D
Catenary Wire Contact Wire Cantilever or Bracket Arm Up to 75 m Rammfundierung bei nder ÖBB
Standard Types of Masts Rectangular Concrete Mast Rectangular Steel Mast Rammfundierung bei nder ÖBB
Concrete Pad Foundation of Rectangular Concrete Mast • Concrete Quantity: 1,2m³ to 12,8m³ • Quiver for Mast Footing • Fastening of Mast by compacted split gravel Split Gravel Rammfundierung bei nder ÖBB
Development of Piling Technology AUSTROPILE Rammfundierung bei nder ÖBB
Austropile Box-Section Frame consists of 4 steel plates with defined contact areas Contact Patch/Area Cutting Rammfundierung bei nder ÖBB
Piling Process Cavity for mast remains unfilled NO EXCAVATION Rammfundierung bei nder ÖBB
Advantages of Austropiles • Set-up of foundation in one step • No excavation • Immediately loadable • Modular concept allows delivery and installation on short notice • Construction of foundation at inadmissible location • Additional earth connection Rammfundierung bei nder ÖBB
Piling Rig Firstly operated at Rail Station Wörgl in 1992 Rammfundierung bei nder ÖBB
Hydraulic Hammer • Weight of hammer 1500kg • Total Weight 2700kg • Rate of Fall max 4,7m/s • Blowenergy 16,5 kNm • Blowrate 60-100/min. Rammfundierung bei nder ÖBB
Advantages of Piling Rig • Operation underneath existing lines and networks • Unconstrained operation of subsidiary track • Self-propelled (no locomotive) Rammfundierung bei nder ÖBB
Advantages of Piling Rig • Rail-Road Vehicle(minimized travel time) • Hydraulic Hammer(simplified handling/ adjustable to ground conditions) • Average Piling Time approx. 25 Minutes(at hardground conditions up to 1 hour) Rammfundierung bei nder ÖBB
Work Flow Rammfundierung bei nder ÖBB
Functional Range of Astropiles • Mastfoundation of Catenary Systems • Foundation of Sound Barrier Supports • Foundation of Signal Masts • Foundation of Floodlight Tower Rammfundierung bei nder ÖBB
Mast Mounting Device • Crane Momentum 75 mtons • Dead Weight 120 tons • Unconstrained operation of subsidiary track • Existing Catenary System does not impede operation Rammfundierung bei nder ÖBB
Client‘s Advantages • Optimized Use of Processing Time • Execution without Locomotives • Minimized Documentation of Client required ... hence beginning of construction works at short notice • Optimized Economical Production Costs of Foundation Rammfundierung bei nder ÖBB
Special Operation Joint Operation of Foundation and Installation Gangs in the Area of Haag Mission Possible by using EUROPTEN - Technology Rammfundierung bei nder ÖBB
Special Operation Railstation MeidlingFoundation Works closed to Platforms 80 Foundation completed in 13 Workingdays under full Operation of Railtraffic Rammfundierung bei nder ÖBB
For the further information please contact: • Mr. Wolfgang Schlesinger • wolfgang.schlesinger@europten.at • Marko Marijanovic • marko.marijanovic@porr.at Rammfundierung bei nder ÖBB
EUROPTEN an innovative Company Your PARTNER for the future ! Rammfundierung bei nder ÖBB