COCOMO II Estimation

COCOMO II Estimation . Pongtip Aroonvatanaporn CSCI 577b Spring 2011 March 25, 2011. Outline. Problems COCOMO II parameters Scale Factors Cost Drivers CSCI577 Scenario COCOMO II estimation uncertainties. Problems. Many misunderstandings of COCOMO parameters Name sound straightforward

varuna
Télécharger la présentation

COCOMO II Estimation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COCOMO II Estimation PongtipAroonvatanaporn CSCI 577b Spring 2011 March 25, 2011 (C) USC-CSSE

  2. Outline • Problems • COCOMO II parameters • Scale Factors • Cost Drivers • CSCI577 Scenario • COCOMO II estimation uncertainties (C) USC-CSSE

  3. Problems • Many misunderstandings of COCOMO parameters • Name sound straightforward • But actual meanings are more detailed • Inaccurate estimations of effort • Incorrect values specified for COCOMO drivers • Many done with guesses (C) USC-CSSE

  4. Outline • Problems • COCOMO II parameters • Scale Factors • Cost Drivers • CSCI577 Scenario • COCOMO II estimation uncertainties (C) USC-CSSE

  5. Scale Factors • Precedentedness (PREC) • Development Flexibility (FLEX) • Architecture / Risk Resolution (RESL) • Team Cohesion (TEAM) • Process Maturity (PMAT) (C) USC-CSSE

  6. PREC • Similarity to previously developed projects • Knowledge on the project • Familiarity Very low Low Nominal High Very high Extra high Most likely for 577 (C) USC-CSSE

  7. PREC for 577 • Most students are familiar with web development • Web applications have been done for many years (C) USC-CSSE

  8. FLEX • The flexibility in development allowed in the project • Levels of conformity required in developing the software product • Dependent on external interface and specifications Very low Low Nominal High Very high Extra high Most likely for 577 (C) USC-CSSE

  9. FLEC for 577 • Most clients do not have strict requirements on specifications • Only on capabilities, but not implementation • Developers can often suggest development approaches • Developers often know better (C) USC-CSSE

  10. RESL • How much effort is spent in reviewing design and mitigating risks Very low Low Nominal High Very high Extra high Most likely for 577 (C) USC-CSSE

  11. RESL for 577 • ICSM is a risk-based process • Risk resolution are done extensively throughout the project life-cycle • Project designs and architectures are reviewed • ARB at every milestones • Reviews by IIV&V (C) USC-CSSE

  12. PMAT • Based on the SEI’s Capability Maturity Model (CMM) • Values correspond to CMMI levels Very low Low Nominal High Very high Extra high Most likely for 577 (C) USC-CSSE

  13. PMAT for 577 • The level of detail done for 577 equates roughly to CMMI level 2 • If you perform extra project management or life-cycle management tasks, level can increase (C) USC-CSSE

  14. Cost Drivers • Focus on the post-architecture • Overall design of the project is already known • For use in development and maintenance of software products • Cost drivers usually tend to be different for each module • E.g. UI modules are usually less complex than server modules • Achieve more accurate estimation when done by module (C) USC-CSSE

  15. Product • Required Software Reliability (RELY) • Database Size (DATA) • Product Complexity (CPLX) • Developed for Reusability (RUSE) • Documentation Match to Life-Cycle Needs (DOCU) (C) USC-CSSE

  16. RELY • The required reliability of the software product • What is the impact of the software failure? Very low Low Nominal High Very high Slight inconvenience Low, easily recoverable losses Moderate, easily recoverable losses High financial losses Risk to human life Most likely for 577 (C) USC-CSSE

  17. RELY for 577 • Most are web application projects • Content management systems, user management systems, informative web • Systems are used mainly for convenience • To speed up process • To reach wider audience • No safety critical systems (C) USC-CSSE

  18. DATA • Calculation formula provided in the COCOMO book • Based on the ratio of database size and program size • Not simply how much you need to store • The data required to complete test of the program (C) USC-CSSE

  19. CPLX • 5 areas • Control operations • Computational operations • Device-dependent operations • Data management operations • User interface management operations • Find the average between the areas Very low Low Nominal High Very high Most likely for 577 (C) USC-CSSE

  20. CPLX for 577 • Mostly using simple reads and writes between application and database • Utilize NDI/NCS components (i.e. MySQL, PHP, Apache, Tomcat) • Simple UI designs • No widget designs, no framework designs • No direct hardware operations • No complex data structure designs (C) USC-CSSE

  21. RUSE • How much of the components will need to be reused in other applications • Effort needed to achieve generic design • Effort for testing to ensure wide range of compatibility • Across project • Across product line • Across multiple product lines Low Nominal High Very high Extra high Most likely for 577 Across product lines None Across project Across program Across multiple product lines (C) USC-CSSE

  22. RUSE for 577 • Not developing for a product line • Independent / standalone web applications • Very little reuse components • Unless designing frameworks and widgets for use within project (C) USC-CSSE

  23. DOCU • Based on the life-cycle needs • How much of the life-cycle is captured in documentation • How much is suitable • Affects maintenance portion of life-cycle • Software understanding (SU) Very low Low Nominal High Very high Most likely for 577 Many life-cycle needs uncovered Some life-cycle needs uncovered Right-sized to life-cycle needs Excessive for life-cycle needs Very excessive for life-cycle needs (C) USC-CSSE

  24. DOCU for 577 • ICSM does require certain amount of documentation • May seem excessive due to • Learning curve • Teaching process • Actual documentation may be more than required for project complexity (C) USC-CSSE

  25. Platform • Execution Time Constraint (TIME) • Main Storage Constraint (STOR) • Platform Volatility (PVOL) (C) USC-CSSE

  26. Platform • Given the modern day technologies, these drivers are nearly irrelevant. • Most likely NOMINAL for 577 projects • Little computation resource required for web applications • Storage is cheap • Size of data store tends to be insignificant compared to available storage • Platforms are stable (i.e. OS, DBMS). Major changes are not needed. (C) USC-CSSE

  27. Personnel • Analyst Capability (ACAP) • Programmer Capability (PCAP) • Personnel Continuity (PCON) • Applications Experience (APEX) • Platform Experience (PLEX) • Language and Tool Experience (LTEX) (C) USC-CSSE

  28. ACAP • Capability of requirements gatherer, high-level and detailed designers. • Not based on the experience of analyst • Abilities in • Analysis and design • Efficiency and thoroughness • Communication and cooperation Very low Low Nominal High Very high Most likely for 577 15th percentile 35th percentile 55th percentile 75th percentile 90th percentile (C) USC-CSSE

  29. PCAP • Ability of programmers to deal with • COTS packages • SDKs, frameworks, etc. • Based on the capability of the team, not the individuals • Not experience Very low Low Nominal High Very high Most likely for 577 15th percentile 35th percentile 55th percentile 75th percentile (C) USC-CSSE

  30. APEX • Team’s experience with specific type of application Very low Low Nominal High Very high Most likely for 577 < 2 months 6 months 1 year 3 years 6 years (C) USC-CSSE

  31. APEX for 577 • Most are computer science students • Familiar with web development (C) USC-CSSE

  32. PLEX • Experience with the platforms used • Database • Graphical user interface • Frameworks • Middlewares Very low Low Nominal High Very high Most likely for 577 < 2 months 6 months 1 year 3 years 6 years (C) USC-CSSE

  33. PLEX for 577 • Most experiences develop from industry work • Many undergraduate courses may not have provided the necessary experience (C) USC-CSSE

  34. LTEX • Experience on the programming language used • Experience with the tool support used for development • IDE, DBMS Very low Low Nominal High Very high Most likely for 577 < 2 months 6 months 1 year 3 years 6 years (C) USC-CSSE

  35. LTEX for 577 • Most are computer science students • Should be familiar with few programming languages • Chosen language are often picked by developers, not client • Pick language most comfortable/experienced with (C) USC-CSSE

  36. Project • Use of Software Tools (TOOL) • Multisite Development (SITE) • Required Development Schedule (SCED) (C) USC-CSSE

  37. TOOL • Extensiveness on the use of tools in the development process • Code editing • Life-cycle management Very low Low Nominal High Very high Most likely for 577 Edit, code, debug Simple CASE, little integration Basic life-cycle tools, moderately integrated Strong life-cycle tools, moderately integrated Proactive life-cycle tools, well integrated with processes, methods, reuse (C) USC-CSSE

  38. TOOL for 577 • Most teams do not have access to life-cycle support tools • Most require expensive licenses • Some software engineering aid tools • Bugzilla is used for bug/defect tracking • SVN for version control (C) USC-CSSE

  39. SCED • Based on percentage of schedule compression • Stretch-out or acceleration • Accelerated schedules tend to produce more effort at early and later phases • Balanced out by middle phases • Higher ratings do not add or decrease effort Very low Low Nominal High Very high Most likely for 577 75% or nominal 85% of nominal 100% of nominal 130% of nominal 160% of nominal (C) USC-CSSE

  40. SCED for 577 • Nominal, high, and very high ratings all have value of 1.0 • Makes no difference • Must be at least nominal since much effort is spent in early phases • Address and mitigate risks • Design, review, and refine architecture (C) USC-CSSE

  41. Outline • Problems • COCOMO II parameters • Scale Factors • Cost Drivers • CSCI577 Scenario • COCOMO II estimation uncertainties (C) USC-CSSE

  42. Purpose • To determine the level of estimation uncertainty throughout the project • Develop the cone of uncertainty in project effort estimation (C) USC-CSSE

  43. What to do • Revisit project estimation since the beginning of project • For each COCOMO parameter, determine • Optimistic value • Most likely value • Pessimistic value • The same process done for Code Count assignment (C) USC-CSSE

  44. What to do • First individually revisit the estimations • Provide values for the estimations • Discuss each COCOMO parameter among team members • Final values should be consensus among team members (C) USC-CSSE