80 likes | 177 Vues
Explore broad cost estimates and subsidy needs in the diverse AD sector based on existing data and member feedback. Caution advised due to varied plant models. Results are in £ per MWh subsidy.
E N D
Notes • We have made these broad cost estimates based on existing data and feedback from members • The AD sector is a varied sector encompassing many different models: each plant built to date has followed quite specific models – therefore caution must be exercised in using this data other than for the purpose of calculating the average cost of electricity generation from AD and the subsidy required per MWh • Results are presented in £/ MWh of subsidy required (this can be converted into pence per kWh: for example £50/ MWh is 5 p/ kWh)