1 / 8
AMM-2 Coverage
80 likes | 219 Vues
AMM-2 Coverage. Vexcel 27 April 2000. All Beams. S-6. F-1. S-2. S-1. EL-1 (asc only). SAR On Time. For all beams (per cycle): actual coverage = 1367 min 4 sec CDPF pad (reqtd) = 96 min 8 sec ASF pad (opt) = 192 min Without F1 (per cycle) actual coverage = 1009 min
Télécharger la présentation
AMM-2 Coverage
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
AMM-2 Coverage Vexcel 27 April 2000
SAR On Time • For all beams (per cycle): • actual coverage = 1367 min • 4 sec CDPF pad (reqtd) = 96 min • 8 sec ASF pad (opt) = 192 min • Without F1 (per cycle) • actual coverage = 1009 min • 4 sec CDPF pad (rqtd) = 62 min • 8 sec ASF pad (opt) = 123 min
More Related