1 / 14

IEEE 802.15 Working Group for Wireless Personal Area Networks (WPAN ™)

IEEE 802.15 Working Group for Wireless Personal Area Networks (WPAN ™). TG1 Opening Report January 2002 Dallas, TX USA. Contents. Summary Session #16/Dallas Overview Objectives (see summary) Submissions Sponsor Ballot #3 (SB3) Report Project Planning Status Next Meeting Status

vhaywood
Télécharger la présentation

IEEE 802.15 Working Group for Wireless Personal Area Networks (WPAN ™)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.15 Working Group for Wireless Personal Area Networks (WPAN™) TG1 Opening Report January 2002 Dallas, TX USA Ian Gifford, Consultant

  2. Contents • Summary • Session #16/Dallas Overview • Objectives (see summary) • Submissions • Sponsor Ballot #3 (SB3) Report • Project Planning Status • Next Meeting Status • Drafting History Ian Gifford, Consultant

  3. Summary [1 of 2] • Task Group 1 (TG1) is deriving a draft standard from the Bluetooth™ specification under IEEE PAR 802.15.1 • After Session #15, we attended the 4-5Dec01 IEEE-SA StdBd Committee Meetings (PatCom, RevCom) in NYC USA. • PatCom reviewed the Bluetooth LOA and accepted it. • RevCom reviewed the Application for approval of P802.15.1 –01/462r1a and it was disapproved (see notes on this slide). • After the RevCom meeting our Ballot Review Committee (BRC) was assembled to review and respond to the comments. Ian Gifford, Consultant

  4. Summary [2 of 2] • The BRC submitted the recirculation package and on 17Jan02 we closed our 10-day Std. 802.15.1/D1.0.1 Second Recirc. (SB3). It passed 27/2/2 or 93%. 2 Balloters submitted comments, we will provide rebuttal. • TG1 is not planning to meet during Session #16/Dallas. • During the Jan02/Mar02 between-session-period • SB3 resubmission to RevCom. • Attend the 19-21Mar02 IEEE-SA Std Board Committee Meetings in Piscataway, NJ USA. Ian Gifford, Consultant

  5. Session #16/Dallas – Submissions • 01/420r12 WG SB1-3 Comment DB Gifford • 01/457r0 TG1 Nov01 Minutes Gifford • 02/003r0 TG1 Jan02 Meeting Objectives and Agenda Gifford • 02/010r0 TG1 Jan02 Minutes Gifford • 02/016r0 WG TG1 Opening Report Jan02 Gifford • 02/xxx WG Liaison Report Jan02 Gifford • 02/049 WG TG1 Closing Report Jan02 Gifford The minutes and closing report are not needed as the TG1 is not meeting. Ian Gifford, Consultant

  6. IEEE 802.15 Working Group for Wireless Personal Area Networks (WPAN™) Sponsor Balloting Summary Report, SB1-3 Ian Gifford, Consultant

  7. } The third DISAPPROVING Balloter changed his vote on 12Oct01 from no to yes w/ comments. This changes the affirmation from 89% to 93% on SB1-2. SBs Summary Report • Sponsor Ballot #1, passed @89% • 30 Day Electronic Ballot • 27Jul01 Opened • 25Aug01 Closed • Sponsor Ballot #2, passed @89% • 10 Day Electronic Recirculation Ballot • 2Oct01 Opened • 11Oct01 Closed • Sponsor Ballot #3, passed @93% • 10 Day Electronic Recirculation Ballot • 7Jan02 Opened • 17Jan02 Closed Ian Gifford, Consultant

  8. SB1 Summary Report • P802.15.1/D0.9.2 • Closing date: 2001-08-25 • The report is the result from the group: 0000130 • 1. This ballot has met the 75% returned ballot requirement. • 33 eligible people in this ballot group. • 26 affirmative votes • 3 negative votes • 1 abstention votes • 30 votes received • 90% returned • 3% abstention • 2. The 75% affirmation requirement is being met. • 26 affirmative votes • 3 negative votes • 29 votes • 89% affirmative Source: -01/420r12 Ian Gifford, Consultant

  9. Generalization of Negative Comments • Proposed standard operates in the same band as 802.11 • Coexistence not addressed • Optional power level of 100mw • Normative vs. Informative SDL • Technical disagreements (how it works vs. how it might work better) • Further clarification on negatives and reply to some of the BRC rebuttals. Ian Gifford, Consultant

  10. IEEE 802.15.1 Current Project Planning • Jul99 • Initial Discussion on Proposals. • Nov99 • Initial draft ready for WG ballot. • Jan00 • First Ballot complete, second ballot kicked off. • Mar01 • Jul01 • Draft ready for IEEE sponsor ballot. • Sep01 • Nov01 • Dec01 • Mar02 • Approval by IEEE Standards Board 802.15.1 Project Target & 802 Sponsor Expectation Ian Gifford, Consultant

  11. Tentative Needs for Mar02 Interim • 11-15Mar02 (5 Days) • 0 People TG1 leadership is not planning to attend the Mar02 Plenary. Ian Gifford, Consultant

  12. IEEE 802.15 Future Meetings • March 11-14, 2002 St Louis, MO USA, Hyatt Regency, 802 Plenary Meeting. • May 13-17, 2002, Sydney, NSW, AU, Wentworth Sydney Hotel, Interim Meeting. • July 8-11, 2002 Vancouver, BC Canada, Hyatt Regency, 802 Plenary Meeting. • September 9-13, 2002, Hyatt Regency Monterey, 802.15 Interim Meeting. • November 11-14, 2002 Koloa, HI USA, Hyatt Regency Kauai, 802 Plenary Meeting. • More Info: • http://ieee802.org/15/pub/Meeting_Plan.html • http://ieee802.org/meeting/ Ian Gifford, Consultant

  13. Draft 0.0 - Tom Siep 100% Draft 0.1 - Tom Siep 100% Draft 0.2 - Tom Siep 100% Draft 0.3 - Tom Siep 100% 283 Pages Draft 0.4 - Tom Siep 100% Draft 0.5 - BT-IEEE Editorial Working Group 331 Pages 1 Chief Editor/6 Technical Editors 6 Bluetooth Promoter Company Reviewers w/ internal help ~300 Comments Draft 0.6 - BT-IEEE Editorial Working Group 308 Pages 1013 Comments Draft 0.7 – Tom Siep 100% 617 Pages Draft 0.7.1 - IEEE 802.15 Task Group 1 Technical Editors 803 Pages 1 Chief Editor/11 Technical Editors Draft 0.7.2 - IEEE 802.15 Task Group 1 Technical Editors 773 Pages 1 Chief Editor/11 Technical Editors 412 Comments Draft 0.7.3 – Jennifer Longman, IEEE-SA Project Editor 100% Draft 0.7.4 - IEEE 802.15 Task Group 1 Technical Editors Draft 0.8.0 - IEEE 802.15 Task Group 1 Technical Editors 1130 Pages 1 Chief Editor/7 Technical Editors 376 comments Draft 0.9.1 - IEEE 802.15 Task Group 1 Technical Editors 1159 Pages 1 Chief Editor/7 Technical Editors 71 comments Draft 0.9.2 - IEEE 802.15 Task Group 1 Technical Editors 1159 Pages 1 Chief Editor/3 Technical Editors 60 comments Draft 1.0.1 - IEEE 802.15 Task Group 1 Technical Editors 1165 Pages 1 Chief Editor/3 Technical Editors 0 comments Draft 1.1 - IEEE 802.15 Task Group 1 Technical Editors 1159 Pages 1 Project Editor 0 comments 802.15.1 Drafting History The IEEE-SA Project Editor will provide D1.1, an updated Draft post SB2 or D1.0.1, this week. Ian Gifford, Consultant

  14. In conclusion, the Project 802.15.1 would like to leave you with this slide  Ian Gifford, Consultant

More Related