VHT SG November 2008 Closing Report. Authors:. Date: 2008-11-13. Abstract. This document is the closing report for the Very High Throughput Study Group for the November 2008 plenary session. Work Completed. PAR development EC report, Eldad Perahia, 08/0813r3

vicki
Télécharger la présentation

VHT SG November 2008 Closing Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VHT SG November 2008 Closing Report Authors: Date: 2008-11-13 Eldad Perahia, Intel Corporation

  2. Abstract This document is the closing report for the Very High Throughput Study Group for the November 2008 plenary session. Eldad Perahia, Intel Corporation

  3. Work Completed • PAR development • EC report, Eldad Perahia, 08/0813r3 • Feedback received on PAR and response, Jon Rosdahl, 08/1367r0 • Update to PAR, 08/806r7 • PAR & response to feedback approved by SG & WG • Technical Contribution • Designing for Coexistence, John Stine, 08/1306r0 • Joint meeting w/ TGac • Summary of 802.16m Development Process, Jose Puthenkulam, Vice Chair 802.16, 08/1394 • Inputs for a VHT Selection Procedure, Rolf De Vegt, 08/1392r0 • Introduction to VHT Usage Models, Rolf De Vegt, 08/1323r0 • Timeline update - if PAR approved by EC & Nescom: • TGad starts officially in January 2009 • Call for chair nominations and election would occur in January 2009 Eldad Perahia, Intel Corporation

  4. SG Extension Motion • Request the IEEE 802 LMSC to extend the 802.11 Very High Throughput Study Group. • Move: Darwin Engwer • Second: Rolf De Vegt • Vote Y: 44, N: 0, Abs: 0 Eldad Perahia, Intel Corporation

  5. Goals for January • If EC & NesCom approves PAR • Officially begin TGad (VHT60) activity • Officer elections • Start working on VHT60 task group documents • Selection procedure • Usage model • Etc… • Technical contributions Eldad Perahia, Intel Corporation

  6. Conference call times • Dec 4 – • 11:00-13:00 ET • Dec 18 - • 20:00-22:00 ET • Jan 15 – • 11:00-13:00 ET • Joint call w/ TGac • Usage model • Possible topics for calls • Usage model • selection procedure • other TG documents • Calls do not overlap TGac calls Eldad Perahia, Intel Corporation