1 / 11

RPC BARREL P. Vitulo per Bari/Frascati/Napoli/Pavia

RPC BARREL P. Vitulo per Bari/Frascati/Napoli/Pavia. Outline: Dettaglio Richieste 2009 per Sezioni Totale Richieste 2009 per RPC BARREL e confronto con Luglio 2008 Proposta Distribuzione Servizi MoA per RPC BARREL Dettaglio richieste MOF-B Richieste aggiuntive 2008

vicky
Télécharger la présentation

RPC BARREL P. Vitulo per Bari/Frascati/Napoli/Pavia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC BARREL P. Vitulo per Bari/Frascati/Napoli/Pavia • Outline: • Dettaglio Richieste 2009 per Sezioni • Totale Richieste 2009 per RPC BARREL e confronto con Luglio 2008 • Proposta Distribuzione Servizi MoA per RPC BARREL • Dettaglio richieste MOF-B • Richieste aggiuntive 2008 • Piano di intervento e spare • Closed Loop @ P5 • GIF Roma 21/7/2008 CMS Referees

  2. Dettaglio richieste 2009 BARI Roma 21/7/2008 CMS Referees

  3. Dettaglio richieste 2009 FRASCATI Roma 21/7/2008 CMS Referees

  4. Dettaglio richieste 2009 NAPOLI Roma 21/7/2008 CMS Referees

  5. Dettaglio richieste 2009 PAVIA Roma 21/7/2008 CMS Referees

  6. Riassunto richieste 2009 e confronto con il 2008 (Luglio) n.b. Il confronto è fatto a Luglio 2008 Roma 21/7/2008 CMS Referees

  7. - Distribuzione Servizi MoA per sezione - Rapporto servizi Italia/CERN Roma 21/7/2008 CMS Referees

  8. Da Tabella RPC documento ufficiale MoA da cui è stato estratto solo il BARREL Roma 21/7/2008 CMS Referees

  9. Dettaglio richieste MOF-B 2009 Roma 21/7/2008 CMS Referees

  10. RPC BARREL Richieste aggiuntive 2008 Roma 21/7/2008 CMS Referees

  11. Wheel sec chamber problem spare severity access Piano di intervento e Spare W-2 7 Rb1in-right Leak broken output T-connector No avail Medium , Can operate To be removed and repaired on place W-1 12 RB4/2000-right ID266-357 Leak External connections ? 0.02mbar/min. No avail Low , Can operate First check connection on wheel. Otherwise to be removed and need spare 6 RB3 right ID 1, 12 Leak External connections? 0.04mbar/min. 1 spare with serv.avail Low, Can operate First check connection on wheel. Otherwise to be removed and need one spare 10 RB4/2500 right ID 124,128 Leak, External connections? 0.2 mbar/min No avail Medium, Can operate First check connection on wheel. Otherwise to be removed and need spare 6 RB4-1500 right without service LV digital cable in short No need High, not in operation To be removed and repaired on place 8 W-1/RB3+ Distribution board. FEB threshold control ok Low, in operation To be pulled out to replace the board W0 8 RB3 left ID 6,2 Leak no pressure No avail Medium in operation in gas ricirculation To be removed. Need spare 1 RB1out left ID 408 Leak 0.05 mbar/min avail Low, in operation, in gas ricirculation To be removed. 2 RB3 right ID 24, 287 Leak 0.250 mbar/min 1 spare with service avail Medium, in operation , in gas ricirculation To be removed. Need one spare 8 RB2out Distribution board, FEB Threshold control ok Low in operation To be pulled out to replace the board W+2 8 RB4+ right ID 150 Leak broken input T-connector No avail High, not in operation To be removed and repaired on place 5 RB1out Distribution board. FEB threshold control ok Low, in operation To be pulled out to replace board

More Related