1 / 16

DARSI II

Data Acquisition Real-Time System Integration. DARSI II. Preston Schipper Matt Hulse Adrienne Baile. Data Acquisition. What is Data Acquisition? Network of Sensors Central Collection Processing of Information Output. Our Data Acquisition System: Application: CU FSAE race car

victoria
Télécharger la présentation

DARSI II

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Acquisition Real-Time System Integration DARSI II Preston Schipper Matt Hulse Adrienne Baile

  2. Data Acquisition • What is Data Acquisition? • Network of Sensors • Central Collection • Processing of Information • Output • Our Data Acquisition System: • Application: CU FSAE race car • Design: Challenges, Solutions • Teamwork & Group Schedule • Impacts and Feasibility of DARSI after the Capstone expo. • Examples of Data Acquisition: • Anti-Lock Brakes • Airplane Black Boxes • Industrial Manufacturing • Lab Experiements

  3. What is Formula SAE? • Collegiate Design Series • Group of diverse engineering disciplines • World Wide Competition • Why FSAE needs DARSI • Objectives of DARSI • Gather • Process • Store • Present • Control

  4. DARSI System Breakdown: Fall 2004

  5. DARSI versus DARSI II Fall 2004 Capstone Project: DARSI Spring 2006 Capstone Project: DARSI II • Fully functioning data acquisition microprocessor subsystems • Linear position & Hall-effect wheel sensors • SmartMedia memory logging • Automated CAN Bus network • MS Windows data viewing software • Hardware miniaturization; surface mount chips • CAN Bus expansion; ‘bus master’ module • Real-time information for driver; LCD module • Multi-sensor compatible modules • Enhanced PC software; analysis tools • Traction control; real-time analysis/control module

  6. DARSI II: Bus Master Module Current Bus Master: • Bus Master ‘Module’: • Code package • Installed on every DARSI microprocessor • Hardware enabled • PIC Microcontroller – PIC18F458 • Controller Area Network (CAN) • C Programmable • Polling Data / Unique Bus Traffic • Hardware settings control which module acts as bus master. CAN Bus Data Frame

  7. DARSI II: LCD Module LCD Module: CrystalFontz CFAG12864B-TMI-V

  8. DARSI II: Multi-Sensor Modules  OLD NEW • Multi-sensor Modules: • PIC Microcontroller – PIC18F258 • Fast – 40 MHz • Controller Area Network (CAN) • 10-bit A/D converter • C Programmable • Minimize space/weight/repetitive hardware

  9. DARSI II: Traction Control Module • Traction Control System • Monitor front and rear wheel speeds through data on the CAN bus to detect wheel spin • Communicate with the ECU by D/A to through CAN to limit engine power • Changeable control system parameters for varying surface conditions (rain, gravel, dry, etc)

  10. Design Constraints & Implementation Challenges • High Temperatures • Signal Noise • Signal Attenuation • Durability / Vibrations • Weather • Power Limitations • Packaging • Storage Versus Real-time • Time / Board Prototyping • Communication / Compatibility • Data Processing Speed • Signal Acquisition

  11. Details of Project Processors LCD Systems • Microchip – PIC18F258/458 • Fast – 40 MHz • Cost <$10 • Controller Area Network (CAN) • C Programmable • CrystalFontz CFAG12864B-TMI-V • 75.0 x 52.7 x 8.9mm • 60.0 x 32.6mm Viewing Area • Built-in Samsung controller KS0107/KS0108 • PCB Redesign • Surface mount hardware Traction Control • 034 Motorsports Stage IC Engine Control System

  12. Labor and Responsibilities • PCB Design (Adrienne) • Schematics • PCB Development and Population • Processor Coding (Matt & Preston) • Multi-sensor capabilities • Bus Master module • LCD Module • Traction Control System • New Module Prototyping (Matt & Adrienne) • Breadboarding • Testing • Traction Control ECU Interfacing (Preston)

  13. Schedule

  14. What's After Expo? • Economics and Marketability • Broad consumer market • Fully customizable • State of the art • Manufacturability and Sustainability • Pre-manufactured and replaceable sensors • Modularity allows for adaptation • Simple expansion capabilities

  15. Impacts • Environment • Emissions • Fuel Economy • Safety • Acquired information allows for determining safe operating limits • Driver feedback to warn of dangerous conditions • Traction control will decrease out of control vehicles • Society • Racers • Environmental • Applications in general consumer market

  16. Final Objective To design and construct improvements and expansions for the DARSI modular telemetric data acquisition system for automotive applications with a focus on the CU FSAE race car. Questions?

More Related