An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda Item: 5.f.iiSuomi-NPP Operations Status, Planning and Roadmap by: NOAA Tom Schott and Chris Sisko Tel.: +1-301-817-4415 (T. Schott) and +1-301-817-4783 (C. Sisko) Mail: tom.schott@noaa.gov (T. Schott) and chris.a.sisko@noaa.gov (C. Sisko)

  2. SNPP launched on October 28th, 2011 at 0948 UTC. • Successful insertion into the 1330 LTAN orbit (PM). • Spacecraft Commissioning completed on March 8, 2012 • NOAA assumed SNPP Satellite Control Authority on February 22nd, 2013. • Transition of product generation system (NDE) to OSPO operations is scheduled to occur by July 31st, 2013. • JPSS Proving Ground campaign is underway to further exploit use of SNPP data using direct readout sites. • Calibration and validation activities are ongoing.

  3. Recent events: • VIIRS Day-Night-Band capability demonstrated as a new science and operational tool. • CrIS full spectrum capability test (Mar 12th, 2013). • ATMS and CrIS SDRs reach provisional status (Feb 2013). • Issues being worked (ongoing): • VIIRS Rotating Telescope Assembly (RTA)/ Half Angle Mirror (HAM) Sync Loss. • VIIRS Mirror degradation due to Tungsten Oxide contamination—delayed initial sensor(s) activation—instrument remains within system specifications. • VIIRS Single Board Computer (SBC) lockup. • Spacecraft maneuvers: • VIIRS Lunar Roll (~9 per year) for VIIRS calibration activities. • Drag Make-up maneuver for maintaining optimum geo-location. • Inclination Maneuvers (~3 per mission) to ensure optimum LTAN maintenance. • Risk Mitigation Maneuvers as potential conjunctions are identified by NASA Conjunction Assessment Risk Analysis (CARA) team.

  4. Provisional Maturity • ATMS SDR / TDR • CrIS SDR • VIIRS SDR / GEO • VIIRS EDR Imagery (non-NCC) • VIIRS IP – Cloud Mask • OMPS SDR (NP & TC) • Beta Maturity • VIIRS Active Fires • VIIRS EDR – SST / Ocean Color & Chlorophyll • VIIRS EDR – Surface Type / Vegetation Index • VIIRS IP – Surface Reflectance • VIIRS Aerosol Optical Thickness • VIIRS Aerosol Particle Size Parameter • CrIMMS EDR (AVMP & AVTP) • Validated / Calibrated – performance and calibration have been characterized, data/product is ready for use. • Provisional – data/product quality may not be optimal, incremental improvement still occurring. • Beta – early release data/product that has been minimally validated and may contain significant errors. OMPS EDR (NP and TC): Awaiting updates and path forward on: (1) Dark Current, (2) Smear, (3) Stray Lightfrom OMPS Team before “Provisional” approval. Instrument / Record / Type Definitions: ATMS – Advanced Technology Microwave Sounder CrIS – Cross-track Infrared Sounder VIIRS – Visible Infrared Imager / Radiometer Suite OMPS – Ozone Mapping and Profiler Suite CERES – Cloud and Earth Radiant Energy System CrIMMS – CrIS and ATMS combination SDR – Sensor Data Record TDR – Temperature Data Record EDR – Environmental Data Record IP – Intermediate Product NP – Nadir Profile TP – Total Column Profile http://www.star.nesdis.noaa.gov/jpss/Data.php

  5. ATMS and CrIS SDRs provided in near real-time to NWP Centers: NCEP, EUMETSAT/ECMWF, CMC – data are re-broadcast via GTS and EUMETcast. • Select VIIRS imager (375m resolution) channels sent to NWS Alaska Region via AWIPS Satellite Broadcast Network (SBN) – used in analysis for aviation, marine and public forecasts above 600 North and for sea ice analysis. • S-NPP imagery (moderate channels and DNB) from direct readout used by NWS Alaska Region Forecast Offices (Anchorage & Fairbanks). Volcanic ash plume (Kamchatka Peninsula) Image of Alaska (day-night band)

  6. Status on Transition to Operations activities: • most of the training activities have been completed. • NDE Production Environment (PE-1) Operational Readiness Review (ORR) is scheduled for July 23rd. • NDE PE-1 operational handover occurs on July 31st, 2013. • NDE PE-1 operational connections will be established after July 31st (in August) for EUMETSAT and NWS numerical prediction center and field offices and the NDE STE ops connections will be deprecated. • NDE and OSPO staff will work collectively between July 31st and Jan 31st to maintain system reliability. • NDE delivers STE as PE-2 to OSPO by January 2014. PE-1 = Production Environment-1 (ops system) PE-2 = Production Environment-2 (test system) STE = System test Environment (test system)

  7. Latest roadmap for system deployment: • NDE PE-1 (ops system) becomes operational on July 31st, 2013. • NDE PE-2 (test system) goes operational after Jan 31st, 2014. • PDA (Enterprise Distribution System – Product Distribution and Access) is ready for Integration & Testing by the middle of 2014. • PDA goes operational by late 2014 (TBD). • PDA becomes operational at our backup site called CBU (located in Fairmont, WV) in the late 2015 time period. • PDA will provide distribution of operational products for our real-time users and NDE will provide product generation capability. NDE 2.0 & PDA NDE 1.0/2.0 & PDA